The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 17, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 99   INCREASING POWER AFTER EXITING A REFUELING OUTAGE *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 0 03/10/2000 EXITING REFUELING OUTAGE    
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 96   COASTDOWN TO REFUELING OUTAGE *  
INDIAN POINT 2 0 02/15/2000 MAINTENANCE/REFUELING OUTAGE - FUEL PARTIALLY OFFLOADED    
INDIAN POINT 3 100        
LIMERICK 1 0 03/29/2000 REFUELING OUTAGE - SECOND PHASE OF FUEL SHUFFLE IN PROGRESS    
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 0 03/03/2000 REFUELING OUTAGE    
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100     *  
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 27   UNIT ON LINE - INCREASING POWER AT A RATE OF 5% PER HOUR AFTER RECOVERING FROM A MANUAL REACTOR TRIP FROM 99% POWER DUE TO A TURBINE RUNBACK ON 04/12/00 (REFER TO EVENT #36882) *  
SALEM 2 100     *  
SEABROOK 1 100        
SUSQUEHANNA 1 0 03/18/2000 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS    
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 0 04/15/2000 AUTOMATIC REACTOR SCRAM FROM 70% POWER ON LOW REACTOR VESSEL WATER LEVEL (RVWL) DUE TO LOSS OF A FEEDWATER PUMP - BOTH RECIRC PUMPS ALSO TRIPPED ON LOW RVWL RESULTING IN ACTUATION OF HPCI AND RCIC (REFER TO EVENT #36892) - ENTERING REFUELING OUTAGE EARLY   1
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 0 03/04/2000 REFUELING OUTAGE - DEFUELED    
FARLEY 2 100        
HARRIS 1 0 04/15/2000 ENTERING REFUELING OUTAGE    
HATCH 1 100        
HATCH 2 94   HOLDING POWER AT THIS LEVEL DUE TO OSCILLATIONS ON TURBINE CONTROL VALVE #4 AFTER EXITING A REFUELING OUTAGE *  
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 0 04/12/2000 REFUELING OUTAGE    
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 0 04/17/2000 ENTERING REFUELING OUTAGE *  
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100     *  
SURRY 1 0 04/16/2000 ENTERING REFUELING OUTAGE *  
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 0 04/15/2000 AUTOMATIC NEGATIVE FLUX RATE TRIP FROM 100% DUE TO A DROPPED ROD ON 04/15/00 (REFER TO EVENT #36893) - MANUAL REACTOR TRIP DUE TO A DIFFERENCE BETWEEN SHUTDOWN BANK 'B' GROUP DEMAND AND DIGITAL ROD POSITION INDICATION FOR ROD G-13 (REFER TO EVENT #36895)   2
BYRON 1 100        
BYRON 2 100     *  
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE - REFUELED - CORE ALTERATIONS COMPLETE    
DAVIS BESSE 1 0 03/31/2000 REFUELING OUTAGE - DEFUELED    
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 0 04/01/2000 REFUELING OUTAGE - FIRST OF TWO FUEL SHUFFLES COMPLETE - CONTROL ROD RECOUPLING IN PROGRESS *  
KEWAUNEE 1 97        
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 80   INCREASING POWER AT A RATE OF ABOUT 1% PER HOUR AFTER DECREASING TO 72% POWER TO PERFORM FUEL LEAK LOCALIZATION ACTIVITIES - TWO POSSIBLE LEAKERS IDENTIFIED *  
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 0 03/04/2000 REFUELING OUTAGE    
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100   INVESTIGATING COMPUTER PROBLEMS INVOLVING CALCULATION OF CORE PEAKING FACTORS *  
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 0 04/14/2000 REFUELING OUTAGE - DEFUELED    
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 0 03/01/2000 REFUELING OUTAGE - DEFUELED - REPLACING STEAM GENERATORS    
SOUTH TEXAS 2 100     *  
WATERFORD 3 100        
WNP-2 85   INCREASING POWER TO 95% AS PART OF LOAD FOLLOWING ACTIVITIES *  
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021