Power Reactor Status Report for November 10, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 100 | ||||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 100 | ||||
FITZPATRICK 1 | 0 | 11/05/1999 | STARTUP IN PROGRESS AFTER PERFORMING NOBLE METAL INJECTION | * | |
GINNA 1 | 100 | ||||
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 99 | ||||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 100 | ||||
MILLSTONE 2 | 99 | ||||
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 0 | 10/28/1999 | PLANNED MAINTENANCE OUTAGE FOR RECIRC PUMP SEAL REPLACEMENT | * | |
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 98 | PERFORMING A CORE SPRAY SURVEILLANCE | * | ||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 100 | ||||
SALEM 1 | 100 | ||||
SALEM 2 | 100 | ||||
SEABROOK 1 | 100 | ||||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 0 | 10/29/1999 | REFUELING OUTAGE - FIRST FUEL SHUFFLE COMPLETED | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 100 | ||||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 100 | ||||
CATAWBA 1 | 100 | ||||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 0 | 10/01/1999 | EXITING REFUELING OUTAGE | ||
FARLEY 1 | 100 | ||||
FARLEY 2 | 0 | 10/15/1999 | REFUELING OUTAGE - DEFUELED | ||
HARRIS 1 | 100 | ||||
HATCH 1 | 100 | ||||
HATCH 2 | 98 | MAXIMUM OPERATING POWER | |||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 0 | 11/04/1999 | REFUELING OUTAGE - HEAD DETENSIONING IN PROGRESS | * | |
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 100 | ||||
SUMMER 1 | 100 | ||||
SURRY 1 | 100 | ||||
SURRY 2 | 100 | ||||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 60 | HOLDING POWER AT THIS LEVEL TO PERFORM CONDENSER WATERBOX CLEANING | * | ||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | * | |||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 100 | ||||
BYRON 1 | 100 | ||||
BYRON 2 | 0 | 10/23/1999 | REFUELING OUTAGE | ||
CLINTON 1 | 100 | ||||
COOK 1 | 0 | 09/08/1997 | REFUELING OUTAGE - DEFUELED | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE - DEFUELED | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 100 | ||||
DRESDEN 3 | 100 | ||||
DUANE ARNOLD 1 | 0 | 10/22/1999 | REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS | * | |
FERMI 2 | 97 | ||||
KEWAUNEE 1 | 97 | ||||
LASALLE 1 | 0 | 10/22/1999 | REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS | * | |
LASALLE 2 | 100 | ||||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 0 | 10/15/1999 | REFUELING OUTAGE | ||
PERRY 1 | 100 | ||||
POINT BEACH 1 | 0 | 10/15/1999 | REFUELING OUTAGE - DEFUELED | ||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 100 | ||||
QUAD CITIES 2 | 90 | HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED SURVEILLANCE TESTING (CONTROL | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 0 | 11/06/1999 | MID-CYCLE STEAM GENERATOR INSPECTION OUTAGE | * | |
CALLAWAY 1 | 95 | HOLDING POWER AT THIS LEVEL TO PERFORM FLUX MAPPING | * | ||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 0 | 10/01/1999 | EXITING REFUELING OUTAGE - PREPARING TO GO CRITICAL | * | |
GRAND GULF 1 | 0 | 10/22/1999 | REFUELING OUTAGE - FUEL SHUFFLE/RELOAD IN PROGRESS | * | |
PALO VERDE 1 | 19 | UNIT ON LINE AFTER EXITING A REFUELING OUTAGE | * | ||
PALO VERDE 2 | 100 | ||||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 100 | ||||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 100 | ||||
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 47 | INCREASING POWER TO 48% TO PERFORM NUCLEAR INSTRUMENT CALIBRATIONS AFTER EXI | * | ||
WASHINGTON NUCLEAR 2 | 100 | ||||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 100 |