The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 5, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100     *  
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 60   REDUCED REACTOR POWER LEVEL TO REPAIR A TUBE LEAK IN THE "B" CONDENSER. COM *  
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 99   TURBINE CONTROL VALVES FULLY OPEN    
INDIAN POINT 3 92   INCREASING REACTOR POWER LEVEL AFTER REPAIRING A MAIN TURBINE OIL BEARING TR *  
LIMERICK 1 100     *  
LIMERICK 2 100        
MILLSTONE 2 100   MINOR RCS LEAKAGE INTO THE RBCCW SYSTEM WAS FOUND IN THE SAMPLE COOLER. *  
MILLSTONE 3 100        
NINE MILE POINT 1 0 10/28/1999 REPAIRING #11 RECIRC PUMP    
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 0 10/29/1999 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 0 10/01/1999 EXITING REFUELING OUTAGE    
FARLEY 1 100        
FARLEY 2 0 10/15/1999 REFUELING OUTAGE - DEFUELED    
HARRIS 1 100        
HATCH 1 100        
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 6   STARTUP IN PROGRESS *  
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 0 11/04/1999 ENTERING REFUELING OUTAGE *  
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 20   BRINGING THE MAIN TURBINE ON LINE *  
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 0 10/23/1999 REFUELING OUTAGE    
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE - DEFUELED    
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 0 10/22/1999 REFUELING OUTAGE    
FERMI 2 97        
KEWAUNEE 1 97        
LASALLE 1 0 10/22/1999 REFUELING OUTAGE    
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 0 10/15/1999 REFUELING OUTAGE - CORE RELOAD COMPLETED *  
PERRY 1 100        
POINT BEACH 1 0 10/15/1999 REFUELING OUTAGE - DEFUELED *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 83   REDUCING REACTOR POWER LEVEL TO 50% FOR OFFSITE ELECTRICAL LINE WORK. *  
CALLAWAY 1 1   STARTUP IN PROGRESS. REACTOR POWER IS AT 1E-08 AMPS (BELOW POINT OF ADDING H *  
COMANCHE PEAK 1 100     *  
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100     *  
FT CALHOUN 1 0 10/01/1999 REFUELING OUTAGE    
GRAND GULF 1 0 10/22/1999 REFUELING OUTAGE    
PALO VERDE 1 0 10/02/1999 REFUELING OUTAGE - CORE RELOAD COMPLETED    
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 90   CHEMISTRY HOLD POINT *  
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 0 10/12/1999 EXITING REFUELING OUTAGE    
WASHINGTON NUCLEAR 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021