Power Reactor Status Report for October 18, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100     *  
CALVERT CLIFFS 2 100        
FITZPATRICK 1 0 10/14/1999 PERFORMING POST-TRIP INVESTIGATION (REFER TO EVENT #36293)    
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 100     *  
INDIAN POINT 3 0 09/10/1999 EXITING REFUELING OUTAGE - UNUSUAL EVENT DECLARED ON 10/18/99 DUE TO AN UNID *  
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 7   EXITING MAINTENANCE OUTAGE *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 0 09/29/1999 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS    
PILGRIM 1 100        
SALEM 1 0 09/17/1999 EXITING REFUELING OUTAGE    
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100     *  
THREE MILE ISLAND 1 0 09/10/1999 EXITING REFUELING OUTAGE - PREPARING FOR STARTUP *  
VERMONT YANKEE 1 97   COASTDOWN TO REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100   UNUSUAL EVENT DECLARED ON 10/16/99 DUE TO ISSUANCE OF A HURRICANE WARNING - *  
BRUNSWICK 2 100   UNUSUAL EVENT DECLARED ON 10/16/99 DUE TO ISSUANCE OF A HURRICANE WARNING - *  
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 0 10/01/1999 REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS    
FARLEY 1 100        
FARLEY 2 0 10/15/1999 ENTERING REFUELING OUTAGE    
HARRIS 1 100        
HATCH 1 100        
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 0 09/17/1999 REFUELING OUTAGE - DEFUELED    
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 0 09/24/1999 EXITING REFUELING OUTAGE    
SAINT LUCIE 1 5   EXITING REFUELING OUTAGE - PLAN TO PLACE UNIT ON LINE TODAY *  
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 0 10/03/1999 REFUELING OUTAGE - DEFUELED    
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 80   HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING *  
BYRON 2 92   COASTDOWN TO REFUELING OUTAGE *  
CLINTON 1 100        
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE - DEFUELED    
DAVIS BESSE 1 100        
DRESDEN 2 0 10/01/1999 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS    
DRESDEN 3 100        
DUANE ARNOLD 1 92   COASTDOWN TO REFUELING OUTAGE    
FERMI 2 97        
KEWAUNEE 1 97        
LASALLE 1 80   COASTDOWN TO REFUELING OUTAGE *  
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 0 10/15/1999 ENTERING REFUELING OUTAGE    
PERRY 1 100        
POINT BEACH 1 0 10/15/1999 ENTERING REFUELING OUTAGE *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 98   INCREASING POWER FOLLOWING A LOAD DROP TO APPROXIMATELY 50% POWER TO PERFORM *  
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 0 10/02/1999 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS    
COMANCHE PEAK 1 0 09/24/1999 REFUELING OUTAGE- FUEL RELOAD IN PROGRESS    
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 0 09/25/1999 REFUELING OUTAGE - FUEL RELOAD COMPLETED *  
FT CALHOUN 1 0 10/01/1999 REFUELING OUTAGE - DEFUELED *  
GRAND GULF 1 100        
PALO VERDE 1 0 10/02/1999 REFUELING OUTAGE - DEFUELED - UNUSUAL EVENT DECLARED ON 10/16/99 BECAUSE AN    
PALO VERDE 2 100   UNUSUAL EVENT DECLARED ON 10/16/99 BECAUSE AN EARTHQUAKE WAS FELT ONSITE - U    
PALO VERDE 3 100   UNUSUAL EVENT DECLARED ON 10/16/99 BECAUSE AN EARTHQUAKE WAS FELT ONSITE - U    
RIVER BEND 1 100     *  
SAN ONOFRE 2 100   UNUSUAL EVENT DECLARED ON 10/16/99 DUE TO AN EARTHQUAKE LOCATED ABOUT 100 MI    
SAN ONOFRE 3 100   UNUSUAL EVENT DECLARED ON 10/16/99 DUE TO AN EARTHQUAKE LOCATED ABOUT 100 MI    
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 0 10/12/1999 REFUELING OUTAGE - PREPARING TO LIFT REACTOR VESSEL HEAD *  
WASHINGTON NUCLEAR 2 0 09/18/1999 EXITING REFUELING OUTAGE    
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021