The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 22, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 58   REDUCED POWER FOR MAINTENANCE *  
HOPE CREEK 1 100        
INDIAN POINT 2 99   MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 0 04/16/1999 REFUELING OUTAGE    
MILLSTONE 2 100        
MILLSTONE 3 0 05/01/1999 REFUELING OUTAGE - DEFUELED *  
NINE MILE POINT 1 0 04/11/1999 REFUELING OUTAGE - DEFUELED    
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 0 05/08/1999 REFUELING OUTAGE    
SALEM 1 0 05/20/1999 READY FOR REACTOR STARTUP *  
SALEM 2 0 04/03/1999 READY FOR REACTOR STARTUP *  
SEABROOK 1 68   INCREASING POWER *  
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100     *  
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 5   PLANT STARTUP IN PROGRESS *  
CATAWBA 1 0 04/21/1999 READY FOR REACTOR STARTUP *  
CATAWBA 2 0 05/03/1999 MAINTENANCE OUTAGE - REPAIR OF GENERATOR ROTOR    
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 99     *  
HATCH 2 36   REDUCING POWER FOR MAINTENANCE ON MAIN GENERATOR HYDROGEN SEAL *  
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 0 05/20/1999 REFUELING OUTAGE *  
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100     *  
SURRY 1 100        
SURRY 2 0 04/18/1999 REFUELING OUTAGE    
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 58   INCREASING POWER *  
BYRON 1 100        
BYRON 2 100        
CLINTON 1 0 05/19/1999 HOLDING FOR FEEDWATER REG VALVE ISSUES    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 24   HOLDING POWER DUE TO PROBLEMS *  
KEWAUNEE 1 97   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING    
LASALLE 1 45   REDUCED POWER FOR MAINTENANCE ON MAIN CONDENSERS *  
LASALLE 2 100        
MONTICELLO 1 0 05/08/1999 MAINTENANCE OUTAGE    
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 1   REACTOR AT 1% POWER AND HOLDING FOR SECONDARY STARTUP *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 0 04/16/1999 PREPARING FOR REACTOR STARTUP *  
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 0 05/21/1999 SEE EVENT #35753, REACTOR SCRAM DUE TO HIGH LEVEL IN THE SCRAM DISCHARGE VOL * 1
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 0 04/03/1999 REFUELING OUTAGE - FUEL SHUFFLE ON GOING *  
SAN ONOFRE 2 100     *  
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 0 04/17/1999 MAINTENANCE OUTAGE    
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021