Power Reactor Status Report for May 18, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 100 | * | |||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 77 | INCREASING POWER AFTER EXITING A MAINTENANCE OUTAGE | * | ||
CALVERT CLIFFS 2 | 100 | ||||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 98 | OPERATING AT REDUCED LOAD DUE TO DELTA-T SETPOINT ISSUES | |||
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F | |||
INDIAN POINT 3 | 94 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE STOP AND CONTROL VALVE TESTIN | * | ||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE - HYDROSTATIC TEST IN PROGRESS | * | |
MILLSTONE 2 | 79 | INCREASING POWER TO 90% FOR AN NRC HOLD | * | ||
MILLSTONE 3 | 0 | 05/01/1999 | REFUELING OUTAGE - FUEL OFFLOAD SUSPENDED DUE TO PROBLEMS WITH SIGMA MACHINE | ||
NINE MILE POINT 1 | 0 | 04/11/1999 | REFUELING OUTAGE - DEFUELED | ||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 0 | 05/08/1999 | REFUELING OUTAGE - FIRST PHASE OF FUEL SHUFFLE COMPLETE | ||
SALEM 1 | 100 | ||||
SALEM 2 | 0 | 04/03/1999 | REFUELING OUTAGE | ||
SEABROOK 1 | 92 | HOLDING POWER AT THIS LEVEL TO MONITOR TURBINE VIBRATION AFTER EXITING A REF | * | ||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 85 | INCREASING POWER AFTER RECOVERING FROM AN AUTOMATIC TURBINE TRIP/REACTOR SCR | * | ||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE | ||
CATAWBA 1 | 0 | 04/21/1999 | REFUELING OUTAGE - PLAN TO ENTER MODE 4 TODAY | * | |
CATAWBA 2 | 0 | 05/03/1999 | MAINTENANCE OUTAGE - PLAN TO ENTER MODE 4 BY THE END OF THIS SHIFT TO REPAIR | * | |
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 100 | ||||
HARRIS 1 | 100 | ||||
HATCH 1 | 98 | HOLDING POWER AT THIS LEVEL TO PERFORM A 24-HOUR SOAK AS PART OF POWER UPRAT | * | ||
HATCH 2 | 98 | MAXIMUM OPERATING POWER | |||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | * | |||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 100 | ||||
SUMMER 1 | 0 | 05/18/1999 | MANUAL REACTOR TRIP FROM 73% POWER DUE TO HIGH VIBRATION ON THE MAIN TURBINE | * | 1 |
SURRY 1 | 100 | ||||
SURRY 2 | 0 | 04/18/1999 | REFUELING OUTAGE | ||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 100 | ||||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | * | |||
BRAIDWOOD 2 | 0 | 04/23/1999 | REFUELING OUTAGE | * | |
BYRON 1 | 12 | PLAN TO PLACE UNIT ON LINE TODAY AFTER RECOVERING FROM AN AUTOMATIC REACTOR | * | ||
BYRON 2 | 100 | ||||
CLINTON 1 | 0 | 05/14/1999 | REFUELING OUTAGE | * | |
COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 100 | ||||
DRESDEN 3 | 100 | * | |||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 97 | ADMINISTRATIVE POWER LIMIT | |||
KEWAUNEE 1 | 97 | POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING | |||
LASALLE 1 | 100 | ||||
LASALLE 2 | 100 | ||||
MONTICELLO 1 | 0 | 05/08/1999 | MAINTENANCE OUTAGE | ||
PALISADES 1 | 0 | 05/07/1999 | MAINTENANCE OUTAGE - PLAN TO PLACE UNIT ON LINE TODAY | * | |
PERRY 1 | 100 | ||||
POINT BEACH 1 | 0 | 05/14/1999 | MAINTENANCE OUTAGE | * | |
POINT BEACH 2 | 20 | PREPARING TO PLACE THE TURBINE ON LINE AFTER PERFORMING A MAINTENANCE OUTAGE | * | ||
PRAIRIE ISLAND 1 | 0 | 04/16/1999 | REFUELING OUTAGE - REACTOR VESSEL HEAD ON AND TENSIONED - FILL AND VENT IN P | * | |
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 100 | ||||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 100 | ||||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE - FUEL SHUFFLE ON HOLD FOR THE PERFORMANCE OF EMERGENCY COR | * | |
SAN ONOFRE 2 | 97 | INCREASING POWER AFTER DECREASING TO 95% POWER TO PERFORM A HEAT TREAT | * | ||
SAN ONOFRE 3 | 100 | * | |||
SOUTH TEXAS 1 | 100 | * | |||
SOUTH TEXAS 2 | 100 | ||||
WASHINGTON NUCLEAR 2 | 0 | 04/17/1999 | MAINTENANCE OUTAGE | ||
WATERFORD 3 | 94 | INCREASING POWER AFTER DECREASING TO 90% POWER TO REPAIR MAIN TURBINE GOVERN | * | ||
WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021