Power Reactor Status Report for May 18, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 100 | * | |||
| BEAVER VALLEY 2 | 100 | ||||
| CALVERT CLIFFS 1 | 77 | INCREASING POWER AFTER EXITING A MAINTENANCE OUTAGE | * | ||
| CALVERT CLIFFS 2 | 100 | ||||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 98 | OPERATING AT REDUCED LOAD DUE TO DELTA-T SETPOINT ISSUES | |||
| HOPE CREEK 1 | 100 | ||||
| INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F | |||
| INDIAN POINT 3 | 94 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE STOP AND CONTROL VALVE TESTIN | * | ||
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE - HYDROSTATIC TEST IN PROGRESS | * | |
| MILLSTONE 2 | 79 | INCREASING POWER TO 90% FOR AN NRC HOLD | * | ||
| MILLSTONE 3 | 0 | 05/01/1999 | REFUELING OUTAGE - FUEL OFFLOAD SUSPENDED DUE TO PROBLEMS WITH SIGMA MACHINE | ||
| NINE MILE POINT 1 | 0 | 04/11/1999 | REFUELING OUTAGE - DEFUELED | ||
| NINE MILE POINT 2 | 100 | ||||
| OYSTER CREEK 1 | 100 | ||||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 0 | 05/08/1999 | REFUELING OUTAGE - FIRST PHASE OF FUEL SHUFFLE COMPLETE | ||
| SALEM 1 | 100 | ||||
| SALEM 2 | 0 | 04/03/1999 | REFUELING OUTAGE | ||
| SEABROOK 1 | 92 | HOLDING POWER AT THIS LEVEL TO MONITOR TURBINE VIBRATION AFTER EXITING A REF | * | ||
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 100 | ||||
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 85 | INCREASING POWER AFTER RECOVERING FROM AN AUTOMATIC TURBINE TRIP/REACTOR SCR | * | ||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 100 | ||||
| BRUNSWICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE | ||
| CATAWBA 1 | 0 | 04/21/1999 | REFUELING OUTAGE - PLAN TO ENTER MODE 4 TODAY | * | |
| CATAWBA 2 | 0 | 05/03/1999 | MAINTENANCE OUTAGE - PLAN TO ENTER MODE 4 BY THE END OF THIS SHIFT TO REPAIR | * | |
| CRYSTAL RIVER 3 | 100 | ||||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 100 | ||||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 98 | HOLDING POWER AT THIS LEVEL TO PERFORM A 24-HOUR SOAK AS PART OF POWER UPRAT | * | ||
| HATCH 2 | 98 | MAXIMUM OPERATING POWER | |||
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 100 | ||||
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 100 | ||||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 100 | * | |||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 100 | ||||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 100 | ||||
| SUMMER 1 | 0 | 05/18/1999 | MANUAL REACTOR TRIP FROM 73% POWER DUE TO HIGH VIBRATION ON THE MAIN TURBINE | * | 1 |
| SURRY 1 | 100 | ||||
| SURRY 2 | 0 | 04/18/1999 | REFUELING OUTAGE | ||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 100 | ||||
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 100 | * | |||
| BRAIDWOOD 2 | 0 | 04/23/1999 | REFUELING OUTAGE | * | |
| BYRON 1 | 12 | PLAN TO PLACE UNIT ON LINE TODAY AFTER RECOVERING FROM AN AUTOMATIC REACTOR | * | ||
| BYRON 2 | 100 | ||||
| CLINTON 1 | 0 | 05/14/1999 | REFUELING OUTAGE | * | |
| COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
| COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
| DAVIS BESSE 1 | 100 | ||||
| DRESDEN 2 | 100 | ||||
| DRESDEN 3 | 100 | * | |||
| DUANE ARNOLD 1 | 100 | ||||
| FERMI 2 | 97 | ADMINISTRATIVE POWER LIMIT | |||
| KEWAUNEE 1 | 97 | POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING | |||
| LASALLE 1 | 100 | ||||
| LASALLE 2 | 100 | ||||
| MONTICELLO 1 | 0 | 05/08/1999 | MAINTENANCE OUTAGE | ||
| PALISADES 1 | 0 | 05/07/1999 | MAINTENANCE OUTAGE - PLAN TO PLACE UNIT ON LINE TODAY | * | |
| PERRY 1 | 100 | ||||
| POINT BEACH 1 | 0 | 05/14/1999 | MAINTENANCE OUTAGE | * | |
| POINT BEACH 2 | 20 | PREPARING TO PLACE THE TURBINE ON LINE AFTER PERFORMING A MAINTENANCE OUTAGE | * | ||
| PRAIRIE ISLAND 1 | 0 | 04/16/1999 | REFUELING OUTAGE - REACTOR VESSEL HEAD ON AND TENSIONED - FILL AND VENT IN P | * | |
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 100 | ||||
| QUAD CITIES 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 100 | ||||
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 100 | ||||
| COOPER 1 | 100 | ||||
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 100 | ||||
| FT CALHOUN 1 | 100 | ||||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 100 | ||||
| PALO VERDE 2 | 100 | ||||
| PALO VERDE 3 | 100 | ||||
| RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE - FUEL SHUFFLE ON HOLD FOR THE PERFORMANCE OF EMERGENCY COR | * | |
| SAN ONOFRE 2 | 97 | INCREASING POWER AFTER DECREASING TO 95% POWER TO PERFORM A HEAT TREAT | * | ||
| SAN ONOFRE 3 | 100 | * | |||
| SOUTH TEXAS 1 | 100 | * | |||
| SOUTH TEXAS 2 | 100 | ||||
| WASHINGTON NUCLEAR 2 | 0 | 04/17/1999 | MAINTENANCE OUTAGE | ||
| WATERFORD 3 | 94 | INCREASING POWER AFTER DECREASING TO 90% POWER TO REPAIR MAIN TURBINE GOVERN | * | ||
| WOLF CREEK 1 | 100 |