Power Reactor Status Report for May 15, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 60 | HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED MAINTENANCE ON A FEEDWATER PU | * | ||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 0 | 05/10/1999 | MAINTENANCE OUTAGE - PREPARING TO ENTER MODE 4 | * | |
CALVERT CLIFFS 2 | 100 | * | |||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 98 | OPERATING AT REDUCED LOAD DUE TO DELTA-T SETPOINT ISSUES | |||
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO STEAM FLOW DEMAND - TURBINE THROTTLE VALVES F | |||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE - FUEL MOVES COMPLETE - REACTOR REASSEMBLY IN PROGRESS | * | |
MILLSTONE 2 | 19 | INCREASING POWER TO 29% FOR AN NRC HOLD | * | ||
MILLSTONE 3 | 0 | 05/01/1999 | REFUELING OUTAGE - FUEL OFFLOAD SUSPENDED DUE TO PROBLEMS WITH SIGMA MACHINE | * | |
NINE MILE POINT 1 | 0 | 04/11/1999 | REFUELING OUTAGE - DEFUELED | ||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 70 | DECREASING TO 65% POWER TO PERFORM PLANNED MAINTENANCE ON A FEEDWATER HEATER | * | ||
PEACH BOTTOM 2 | 72 | INCREASING POWER AFTER REDUCING POWER TO THIS LEVEL TO PERFORM MAIN STEAM IS | * | ||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 0 | 05/08/1999 | REFUELING OUTAGE - FUEL OFFLOAD AND FUEL SHUFFLE IN PROGRESS | ||
SALEM 1 | 100 | ||||
SALEM 2 | 0 | 04/03/1999 | REFUELING OUTAGE | ||
SEABROOK 1 | 49 | INCREASING POWER AFTER EXITING A REFUELING OUTAGE | * | ||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 100 | ||||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 100 | * | |||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE | ||
CATAWBA 1 | 0 | 04/21/1999 | REFUELING OUTAGE | * | |
CATAWBA 2 | 0 | 05/03/1999 | MAINTENANCE OUTAGE - TROUBLESHOOTING INTERMEDIATE RANGE DETECTOR PROBLEM | * | |
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 100 | ||||
HARRIS 1 | 100 | ||||
HATCH 1 | 97 | HOLDING POWER AT THIS LEVEL TO PERFORM POWER UPRATE TESTING | * | ||
HATCH 2 | 98 | MAXIMUM OPERATING POWER | |||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 63 | DECREASING TO 60% POWER TO PERFORM BUS DUCT COOLING MAINTENANCE | * | ||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 0 | 05/15/1999 | FORCED MAINTENANCE OUTAGE DUE TO LOW REACTOR COOLANT PUMP OIL LEVEL | * | |
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 98 | HOLDING POWER AT THIS LEVEL TO PERFORM NUCLEAR INSTRUMENTATION SYSTEM CALIBR | * | ||
SUMMER 1 | 48 | HOLDING POWER AT THIS LEVEL TO PERFORM FLUX MAPPING AND NUCLEAR INSTRUMENTAT | * | ||
SURRY 1 | 100 | ||||
SURRY 2 | 0 | 04/18/1999 | REFUELING OUTAGE | ||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 100 | ||||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 0 | 04/23/1999 | REFUELING OUTAGE | ||
BYRON 1 | 0 | 05/13/1999 | AUTOMATIC REACTOR TRIP FROM 100% POWER DUE TO AN INADVERTENT POWER RANGE HIG | * | |
BYRON 2 | 100 | ||||
CLINTON 1 | 0 | 05/14/1999 | REFUELING OUTAGE - MANUAL REACTOR SCRAM FROM 4% POWER DUE TO A LEVEL TRANSIE | * | 1 |
COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 99 | * | |||
DRESDEN 3 | 99 | ||||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 97 | ADMINISTRATIVE POWER LIMIT | |||
KEWAUNEE 1 | 97 | POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING | |||
LASALLE 1 | 100 | ||||
LASALLE 2 | 100 | ||||
MONTICELLO 1 | 0 | 05/08/1999 | MAINTENANCE OUTAGE | ||
PALISADES 1 | 0 | 05/07/1999 | MAINTENANCE OUTAGE - REACTOR COOLANT SYSTEM SOLID - HEATUP IN PROGRESS | * | |
PERRY 1 | 100 | ||||
POINT BEACH 1 | 0 | 05/14/1999 | MANUAL REACTOR TRIP FROM 100% POWER AND MANUAL SAFETY INJECTION DUE TO A STE | * | 1 |
POINT BEACH 2 | 52 | HOLDING POWER AT THIS LEVEL TO PERFORM INSPECTION ON THE #4 FEEDWATER HEATER | * | ||
PRAIRIE ISLAND 1 | 0 | 04/16/1999 | REFUELING OUTAGE - FUEL RELOAD COMPLETE | ||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 100 | ||||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 100 | ||||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 99 | HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE BYPASS VALVE TESTING | * | ||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE - FUEL SHUFFLE TEMPORARILY STOPPED | * | |
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 0 | 05/13/1999 | MANUAL REACTOR TRIP FROM 97% POWER DUE TO LOSS OF BOTH FEEDWATER PUMPS (REFE | * | |
SOUTH TEXAS 1 | 100 | ||||
SOUTH TEXAS 2 | 100 | ||||
WASHINGTON NUCLEAR 2 | 0 | 04/17/1999 | MAINTENANCE OUTAGE | ||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 100 | * |