The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 12, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 0 05/10/1999 MAINTENANCE OUTAGE *  
CALVERT CLIFFS 2 97   HOLDING POWER AT THIS LEVEL TO PERFORM POST REFUELING OUTAGE TESTING *  
FITZPATRICK 1 100        
GINNA 1 97     *  
HOPE CREEK 1 70   HOLDING POWER AT THIS LEVEL TO PERFORM PLANNED MAINTENANCE ON THE 'A' FEEDWA *  
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 0 04/16/1999 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS *  
MILLSTONE 2 22   INCREASING POWER *  
MILLSTONE 3 0 05/01/1999 REFUELING OUTAGE *  
NINE MILE POINT 1 0 04/11/1999 REFUELING OUTAGE - DEFUELED    
NINE MILE POINT 2 100     *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 0 05/08/1999 REFUELING OUTAGE    
SALEM 1 100        
SALEM 2 0 04/03/1999 REFUELING OUTAGE    
SEABROOK 1 0 03/27/1999 REFUELING OUTAGE - REACTOR CRITICAL *  
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 86   HOLDING POWER AT THIS LEVEL TO PERFORM POWER ASCENSION TESTING AFTER EXITING *  
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 0 04/16/1999 REFUELING OUTAGE - FUEL RELOAD COMPLETE - VESSEL HYDRO IN PROGRESS *  
CATAWBA 1 0 04/21/1999 REFUELING OUTAGE - FUEL RELOAD COMPLETE *  
CATAWBA 2 0 05/03/1999 MAINTENANCE OUTAGE    
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 94   HOLDING POWER AT THIS LEVEL DUE TO AN EHC PROBLEM ON THE #4 GOVERNOR VALVE *  
HARRIS 1 100        
HATCH 1 75   INCREASING POWER *  
HATCH 2 86   INCREASING POWER *  
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 30   HOLDING POWER AT THIS LEVEL TO LET XENON BUILD IN AND TO PERFORM FLUX MAPPIN *  
SUMMER 1 30   CHEMISTRY HOLD *  
SURRY 1 100        
SURRY 2 0 04/18/1999 REFUELING OUTAGE    
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 0 04/23/1999 REFUELING OUTAGE    
BYRON 1 100        
BYRON 2 100        
CLINTON 1 1   REFUELING OUTAGE - STARTUP IN PROGRESS *  
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100     *  
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 97        
KEWAUNEE 1 97        
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 0 05/08/1999 MAINTENANCE OUTAGE    
PALISADES 1 0 05/07/1999 MAINTENANCE OUTAGE    
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 0 04/16/1999 REFUELING OUTAGE - FUEL RELOAD COMPLETE *  
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 100     *  
PALO VERDE 3 100        
RIVER BEND 1 0 04/03/1999 REFUELING OUTAGE - PLAN TO CONTINUE FUEL SHUFFLE TODAY *  
SAN ONOFRE 2 100        
SAN ONOFRE 3 85   HOLDING POWER AT THIS LEVEL DUE TO CLOSURE OF A TURBINE STOP VALVE *  
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 0 04/17/1999 MAINTENANCE OUTAGE    
WATERFORD 3 100        
WOLF CREEK 1 54   HOLDING POWER AT THIS LEVEL TO REPAIR A HIGH PRESSURE FEEDWATER HEATER LEAK *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.