The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 3, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 0 05/01/1999 SHUTDOWN FROM STARTUP TESTING DUE TO PROBLEMS WITH THE MAIN TURBINE SEAL OIL    
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 03/12/1999 REFUELING OUTAGE    
FITZPATRICK 1 100        
GINNA 1 99        
HOPE CREEK 1 100     *  
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 0 04/16/1999 REFUELING OUTAGE    
MILLSTONE 2 0 02/20/1996 PLANT STARTUP ON HOLD    
MILLSTONE 3 0 05/01/1999 ENTERING REFUELING OUTAGE *  
NINE MILE POINT 1 0 04/11/1999 REFUELING OUTAGE - DEFUELED    
NINE MILE POINT 2 1   STARTUP - CRITICALITY ACHIEVED AT 0118 ET *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 80   INOPERABLE MAIN STEAM ISOLATION VALVE    
SALEM 1 100        
SALEM 2 0 04/03/1999 REFUELING OUTAGE    
SEABROOK 1 0 03/27/1999 REFUELING OUTAGE    
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 97   CONTROL ROD 30-31 DRIFTED IN. WILL REPLACE PILOT SOLENOID ASSOCIATED WITH CO *  
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 0 04/11/1999 REFUELING OUTAGE    
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 0 04/16/1999 REFUELING OUTAGE - REFUELING IN PROGRESS *  
CATAWBA 1 0 04/21/1999 REFUELING OUTAGE    
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 50   OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD *  
HARRIS 1 100        
HATCH 1 55   HOLDING POWER DUE TO A CLOGGED SENSOR LINE TO THE WATER LEVEL TRANSMITTER F *  
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 0 04/18/1999 REFUELING OUTAGE    
SUMMER 1 0 04/03/1999 EXITING REFUELING OUTAGE *  
SURRY 1 100        
SURRY 2 0 04/18/1999 REFUELING OUTAGE - DEFUELED    
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 0 04/23/1999 REFUELING OUTAGE    
BYRON 1 100        
BYRON 2 100        
CLINTON 1 0 09/06/1996 NOT CRITICAL AT TIME OF PHONE CALL (0430 ET). *  
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 0 04/23/1999 MAINTENANCE OUTAGE    
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100     *  
FERMI 2 97   ADMINISTRATIVE POWER LIMIT    
KEWAUNEE 1 97        
LASALLE 1 100        
LASALLE 2 60   REPAIRING MAIN CONDENSER TUBE LEAKS *  
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 1   STARTUP IN PROGRESS. STEAM DOME PRESSURE AT 140psig AND IRMs 7 T0 8 RANGE. *  
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 0 04/16/1999 REFUELING OUTAGE    
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100     *  
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 20   HOLDING POWER LEVEL FOR POWER RANGE INSTRUMENTATION CALIBRATION *  
PALO VERDE 3 100     *  
RIVER BEND 1 0 04/03/1999 REFUELING OUTAGE    
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 03/27/1999 REFUELING OUTAGE    
SOUTH TEXAS 1 100     *  
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 0 04/17/1999 MAINTENANCE OUTAGE    
WATERFORD 3 100        
WOLF CREEK 1 0 04/03/1999 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021