Power Reactor Status Report for April 22, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 0 | 04/12/1999 | MAINTENANCE OUTAGE | ||
BEAVER VALLEY 2 | 100 | ||||
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 0 | 03/12/1999 | REFUELING OUTAGE | ||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 2 | PREPARING TO START FEED PUMP AND ROLL THE TURBINE | * | ||
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | |||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 0 | 04/20/1999 | MAINTENANCE ON EQUIPMENT THAT CAUSED REACTOR SCRAM | * | |
LIMERICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE | ||
MILLSTONE 2 | 0 | 02/20/1996 | REFUELING OUTAGE | ||
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 0 | 04/11/1999 | REFUELING OUTAGE | ||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 80 | INOPERABLE MAIN STEAM ISOLATION VALVE | |||
SALEM 1 | 100 | ||||
SALEM 2 | 0 | 04/03/1999 | REFUELING OUTAGE - DEFUELED | ||
SEABROOK 1 | 0 | 03/27/1999 | REFUELING OUTAGE - DEFUELED | ||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 0 | 03/12/1999 | REFUELING OUTAGE | ||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 0 | 04/11/1999 | REFUELING OUTAGE | ||
BROWNS FERRY 3 | 98 | PRECONDITIONING | * | ||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 0 | 04/16/1999 | REFUELING OUTAGE | ||
CATAWBA 1 | 0 | 04/21/1999 | COOLING DOWN FOR A REFUELING OUTAGE | * | |
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 50 | OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD | |||
HARRIS 1 | 100 | ||||
HATCH 1 | 0 | 03/01/1999 | REFUELING OUTAGE | ||
HATCH 2 | 98 | MAXIMUM OPERATING POWER | |||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 100 | ||||
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 0 | 04/18/1999 | REFUELING OUTAGE | ||
SUMMER 1 | 0 | 04/03/1999 | REFUELING OUTAGE - DEFUELED | ||
SURRY 1 | 100 | ||||
SURRY 2 | 0 | 04/18/1999 | REFUELING OUTAGE | ||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 100 | ||||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 70 | COASTDOWN TO REFUELING OUTAGE | |||
BYRON 1 | 0 | 03/27/1999 | REFUELING OUTAGE | ||
BYRON 2 | 100 | ||||
CLINTON 1 | 0 | 09/06/1996 | REFUELING OUTAGE | ||
COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 100 | ||||
DRESDEN 3 | 100 | ||||
DUANE ARNOLD 1 | 0 | 04/17/1999 | MAINTENANCE OUTAGE - PROCEEDING TO COLD SHUTDOWN TO REPAIR MAIN GENERATOR GR | ||
FERMI 2 | 97 | ||||
KEWAUNEE 1 | 97 | ||||
LASALLE 1 | 100 | ||||
LASALLE 2 | 80 | REDUCED POWER FOR ROD SEQUENCE CHANGE | * | ||
MONTICELLO 1 | 0 | 04/22/1999 | REACTOR SCRAM AT 100% POWER DUE TO LOW REACTOR WATER LEVEL. MAY BE DUE TO D | * | 1 |
PALISADES 1 | 100 | ||||
PERRY 1 | 0 | 03/26/1999 | REFUELING OUTAGE | ||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 0 | 04/16/1999 | REFUELING OUTAGE | ||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 0 | 04/09/1999 | MAINTENANCE OUTAGE | ||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 95 | REDUCED POWER DUE TO LEAK IN THE "3A" LOW PRESSURE FEEDWATER HEATER | * | ||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 3 | HOLDING FOR TURBINE WORK | * | ||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 0 | 03/26/1999 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS | ||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE | ||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 0 | 03/27/1999 | REFUELING OUTAGE - DEFUELED | ||
SOUTH TEXAS 1 | 0 | 03/26/1999 | REFUELING OUTAGE - RELOADING FUEL | ||
SOUTH TEXAS 2 | 100 | ||||
WASHINGTON NUCLEAR 2 | 0 | 04/17/1999 | MAINTENANCE OUTAGE | ||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 0 | 04/03/1999 | REFUELING OUTAGE - DEFUELED |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021