Power Reactor Status Report for April 12, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 48 | REDUCING POWER FOR MAINTENANCE OUTAGE | * | ||
BEAVER VALLEY 2 | 10 | INCREASING POWER | * | ||
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 0 | 03/12/1999 | REFUELING OUTAGE - DEFUELED | ||
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 0 | 03/01/1999 | REFUELING OUTAGE | ||
HOPE CREEK 1 | 100 | ||||
INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | |||
INDIAN POINT 3 | 100 | ||||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 82 | COASTDOWN TO REFUELING OUTAGE | |||
MILLSTONE 2 | 0 | 02/20/1996 | REFUELING OUTAGE - MOCKUP WORK DONE, READY TO REPAIR BODY-TO-BONNET LEAK IN | * | |
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 0 | 04/11/1999 | REFUELING OUTAGE | * | |
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 100 | ||||
PILGRIM 1 | 80 | HOLDING POWER AT THIS LEVEL DUE TO AN INOPERABLE MAIN STEAM ISOLATION VALVE | * | ||
SALEM 1 | 100 | ||||
SALEM 2 | 0 | 04/03/1999 | REFUELING OUTAGE | ||
SEABROOK 1 | 0 | 03/27/1999 | REFUELING OUTAGE - DEFUELED | ||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 0 | 03/12/1999 | REFUELING OUTAGE | ||
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 0 | 04/11/1999 | REFUELING OUTAGE | * | |
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 75 | CONTROL ROD IMPROVEMENT | * | ||
BRUNSWICK 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
CATAWBA 1 | 100 | ||||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 50 | OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD | |||
HARRIS 1 | 100 | ||||
HATCH 1 | 0 | 03/01/1999 | REFUELING OUTAGE | ||
HATCH 2 | 98 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION AFTER PERFORMA | |||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 0 | 03/12/1999 | REFUELING OUTAGE - HEATING UP TO MODE 4 | * | |
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | ||||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | * | |||
SAINT LUCIE 1 | 100 | * | |||
SAINT LUCIE 2 | 100 | * | |||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 65 | COASTDOWN TO REFUELING OUTAGE | * | ||
SUMMER 1 | 0 | 04/03/1999 | REFUELING OUTAGE | ||
SURRY 1 | 100 | ||||
SURRY 2 | 70 | COASTDOWN TO REFUELING OUTAGE | |||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 100 | ||||
VOGTLE 1 | 100 | ||||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 0 | 02/27/1999 | REFUELING OUTAGE - FINAL TESTING PRIOR TO PLANT STARTUP | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 88 | COASTDOWN TO REFUELING OUTAGE | |||
BYRON 1 | 0 | 03/27/1999 | REFUELING OUTAGE - RELOADING CORE | ||
BYRON 2 | 100 | ||||
CLINTON 1 | 0 | 09/06/1996 | REFUELING OUTAGE | ||
COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 100 | * | |||
DRESDEN 3 | 99 | * | |||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 97 | * | |||
KEWAUNEE 1 | 98 | * | |||
LASALLE 1 | 100 | * | |||
LASALLE 2 | 22 | HEATER TUNING PRIOR TO INCREASING POWER | * | ||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 100 | ||||
PERRY 1 | 0 | 03/26/1999 | REFUELING OUTAGE - MOVING FUEL | * | |
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 100 | ||||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 0 | 04/09/1999 | MAINTENANCE OUTAGE | ||
QUAD CITIES 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 0 | 03/20/1999 | REFUELING OUTAGE - CORE RELOADED PERFORMING ECCS FLOW VERIFICATION | * | |
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 100 | ||||
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 100 | ||||
PALO VERDE 2 | 0 | 03/26/1999 | REFUELING OUTAGE - DEFUELED | ||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE - SIPPING CORE | ||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 0 | 03/27/1999 | REFUELING OUTAGE - DEFUELED | ||
SOUTH TEXAS 1 | 0 | 03/26/1999 | REFUELING OUTAGE - DEFUELED | ||
SOUTH TEXAS 2 | 100 | ||||
WASHINGTON NUCLEAR 2 | 85 | LOAD FOLLOW | |||
WATERFORD 3 | 100 | ||||
WOLF CREEK 1 | 0 | 04/03/1999 | REFUELING OUTAGE - PREPARING TO MOVE FUEL | * |