The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 10, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 99   POWER LIMITED DUE TO AN OUT OF SERVICE MOISTURE SEPARATOR REHEATER *  
BEAVER VALLEY 2 0 02/26/1999 EXITING REFUELING OUTAGE    
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 03/12/1999 REFUELING OUTAGE - DEFUELED    
FITZPATRICK 1 100        
GINNA 1 0 03/01/1999 REFUELING OUTAGE - *  
HOPE CREEK 1 100        
INDIAN POINT 2 99   MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 82   COASTDOWN TO REFUELING OUTAGE *  
MILLSTONE 2 0 02/20/1996 REFUELING OUTAGE - REPAIRING A SMALL (400 ml/min) BODY-TO-BONNET LEAK IN A S    
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 80   HOLDING POWER AT THIS LEVEL DUE TO AN INOPERABLE MAIN STEAM ISOLATION VALVE    
SALEM 1 100        
SALEM 2 0 04/03/1999 ENTERING REFUELING OUTAGE    
SEABROOK 1 0 03/27/1999 REFUELING OUTAGE - DEFUELED *  
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 0 03/12/1999 REFUELING OUTAGE -    
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 81   COASTDOWN TO REFUELING OUTAGE    
BROWNS FERRY 3 100        
BRUNSWICK 1 60   PLANNED MAINTENANCE AND VALVE TESTING *  
BRUNSWICK 2 95   COASTDOWN TO REFUELING OUTAGE    
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 50   OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD    
HARRIS 1 100        
HATCH 1 0 03/01/1999 REFUELING OUTAGE -    
HATCH 2 98   MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION AFTER PERFORMA    
MCGUIRE 1 100        
MCGUIRE 2 0 03/12/1999 REFUELING OUTAGE -    
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 50   REDUCED POWER WHILE REPAIRS ARE MADE TO A SMALL LEAK IN THE ECCS SUCTION PIP    
SEQUOYAH 1 100        
SEQUOYAH 2 66   COASTDOWN TO REFUELING OUTAGE    
SUMMER 1 0 04/03/1999 REFUELING OUTAGE -    
SURRY 1 100        
SURRY 2 70   COASTDOWN TO REFUELING OUTAGE *  
TURKEY POINT 3 100        
TURKEY POINT 4 76   PERFORMING CALIBRATIONS PRIOR TO INCREASING POWER *  
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 0 02/27/1999 REFUELING OUTAGE *  

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100     *  
BRAIDWOOD 2 89   COASTDOWN TO REFUELING OUTAGE *  
BYRON 1 0 03/27/1999 REFUELING OUTAGE - DEFUELED    
BYRON 2 100        
CLINTON 1 0 09/06/1996 REFUELING OUTAGE    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 97     *  
DRESDEN 3 94   EQUIPMENT SWAPS *  
DUANE ARNOLD 1 100        
FERMI 2 50   PLANNED MAINTENANCE *  
KEWAUNEE 1 98   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING    
LASALLE 1 99        
LASALLE 2 1   IN STARTUP *  
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 0 03/26/1999 REFUELING OUTAGE -    
POINT BEACH 1 95     *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 0 04/09/1999 MAINTENANCE OUTAGE *  
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 90   INCREASING POWER *  
COMANCHE PEAK 2 0 03/20/1999 REFUELING OUTAGE - ONE ASSEMBLY LEFT TO LOAD *  
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100     *  
PALO VERDE 2 0 03/26/1999 REFUELING OUTAGE - DEFUELED    
PALO VERDE 3 100        
RIVER BEND 1 0 04/03/1999 REFUELING OUTAGE -    
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 03/27/1999 REFUELING OUTAGE - DEFUELED    
SOUTH TEXAS 1 0 03/26/1999 REFUELING OUTAGE - DEFUELED    
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 100     *  
WATERFORD 3 100        
WOLF CREEK 1 0 04/03/1999 REFUELING OUTAGE -    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021