Power Reactor Status Report for April 7, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BEAVER VALLEY 1 | 98 | POWER LIMITED DUE TO AN OUT OF SERVICE MOISTURE SEPARATOR REHEATER | |||
| BEAVER VALLEY 2 | 0 | 02/26/1999 | EXITING REFUELING OUTAGE | ||
| CALVERT CLIFFS 1 | 100 | ||||
| CALVERT CLIFFS 2 | 0 | 03/12/1999 | REFUELING OUTAGE - DEFUELED | ||
| FITZPATRICK 1 | 100 | ||||
| GINNA 1 | 0 | 03/01/1999 | REFUELING OUTAGE - FUEL RELOAD COMPLETE | ||
| HOPE CREEK 1 | 95 | * | |||
| INDIAN POINT 2 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | |||
| INDIAN POINT 3 | 100 | ||||
| LIMERICK 1 | 100 | ||||
| LIMERICK 2 | 84 | COASTDOWN TO REFUELING OUTAGE | |||
| MILLSTONE 2 | 0 | 02/20/1996 | REFUELING OUTAGE - REPAIRING A SMALL (400 ml/min) BODY-TO-BONNET LEAK IN A S | * | |
| MILLSTONE 3 | 100 | ||||
| NINE MILE POINT 1 | 100 | ||||
| NINE MILE POINT 2 | 100 | ||||
| OYSTER CREEK 1 | 100 | ||||
| PEACH BOTTOM 2 | 100 | ||||
| PEACH BOTTOM 3 | 100 | ||||
| PILGRIM 1 | 80 | HOLDING POWER AT THIS LEVEL DUE TO AN INOPERABLE MAIN STEAM ISOLATION VALVE | |||
| SALEM 1 | 100 | ||||
| SALEM 2 | 0 | 04/03/1999 | ENTERING REFUELING OUTAGE | ||
| SEABROOK 1 | 0 | 03/27/1999 | REFUELING OUTAGE - | * | |
| SUSQUEHANNA 1 | 100 | ||||
| SUSQUEHANNA 2 | 0 | 03/12/1999 | REFUELING OUTAGE - | * | |
| THREE MILE ISLAND 1 | 100 | ||||
| VERMONT YANKEE 1 | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
| BROWNS FERRY 2 | 82 | COASTDOWN TO REFUELING OUTAGE | * | ||
| BROWNS FERRY 3 | 100 | ||||
| BRUNSWICK 1 | 100 | ||||
| BRUNSWICK 2 | 95 | COASTDOWN TO REFUELING OUTAGE | * | ||
| CATAWBA 1 | 100 | ||||
| CATAWBA 2 | 100 | ||||
| CRYSTAL RIVER 3 | 100 | * | |||
| FARLEY 1 | 100 | ||||
| FARLEY 2 | 49 | OPERATING AT REDUCED POWER TO AVOID COASTDOWN DURING PEAK DEMAND PERIOD | |||
| HARRIS 1 | 100 | ||||
| HATCH 1 | 0 | 03/01/1999 | REFUELING OUTAGE - | * | |
| HATCH 2 | 98 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION AFTER PERFORMA | |||
| MCGUIRE 1 | 100 | ||||
| MCGUIRE 2 | 0 | 03/12/1999 | REFUELING OUTAGE - | * | |
| NORTH ANNA 1 | 100 | ||||
| NORTH ANNA 2 | 100 | ||||
| OCONEE 1 | 100 | ||||
| OCONEE 2 | 100 | ||||
| OCONEE 3 | 100 | ||||
| ROBINSON 2 | 100 | ||||
| SAINT LUCIE 1 | 100 | ||||
| SAINT LUCIE 2 | 50 | REDUCED POWER WHILE REPAIRS ARE MADE TO A SMALL LEAK IN THE ECCS SUCTION PIP | * | ||
| SEQUOYAH 1 | 100 | ||||
| SEQUOYAH 2 | 67 | COASTDOWN TO REFUELING OUTAGE | * | ||
| SUMMER 1 | 0 | 04/03/1999 | ENTERING REFUELING OUTAGE - PLAN TO DETENTION VESSEL HEAD IN A DAY OR TWO | ||
| SURRY 1 | 100 | ||||
| SURRY 2 | 72 | COASTDOWN TO REFUELING OUTAGE | * | ||
| TURKEY POINT 3 | 100 | ||||
| TURKEY POINT 4 | 0 | 03/15/1999 | APPROACHING CRITICALITY | * | |
| VOGTLE 1 | 100 | ||||
| VOGTLE 2 | 100 | ||||
| WATTS BAR 1 | 0 | 02/27/1999 | REFUELING OUTAGE |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| BRAIDWOOD 1 | 0 | 04/05/1999 | FORCED MAINTENANCE OUTAGE DUE TO CATASTROPHIC FAILURE OF A HEATER DRAIN TANK | ||
| BRAIDWOOD 2 | 91 | COASTDOWN TO REFUELING OUTAGE | * | ||
| BYRON 1 | 0 | 03/27/1999 | REFUELING OUTAGE - DEFUELED | ||
| BYRON 2 | 100 | * | |||
| CLINTON 1 | 0 | 09/06/1996 | REFUELING OUTAGE | ||
| COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
| COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
| DAVIS BESSE 1 | 100 | ||||
| DRESDEN 2 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | |||
| DRESDEN 3 | 99 | MAXIMUM OPERATING POWER DUE TO TURBINE CONTROL VALVE POSITION | |||
| DUANE ARNOLD 1 | 100 | ||||
| FERMI 2 | 97 | POWER LIMITED DUE TO POWER UPRATE ISSUES | |||
| KEWAUNEE 1 | 97 | POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING | |||
| LASALLE 1 | 100 | * | |||
| LASALLE 2 | 0 | 09/20/1996 | REFUELING OUTAGE | ||
| MONTICELLO 1 | 100 | ||||
| PALISADES 1 | 100 | ||||
| PERRY 1 | 0 | 03/26/1999 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | ||
| POINT BEACH 1 | 100 | ||||
| POINT BEACH 2 | 100 | ||||
| PRAIRIE ISLAND 1 | 100 | ||||
| PRAIRIE ISLAND 2 | 100 | ||||
| QUAD CITIES 1 | 99 | MAXIMUM OPERATING POWER DUE TO JET PUMP RISER BRACE LIMITATIONS | |||
| QUAD CITIES 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
|---|---|---|---|---|---|
| ARKANSAS NUCLEAR 1 | 100 | ||||
| ARKANSAS NUCLEAR 2 | 100 | ||||
| CALLAWAY 1 | 100 | ||||
| COMANCHE PEAK 1 | 100 | ||||
| COMANCHE PEAK 2 | 0 | 03/20/1999 | REFUELING OUTAGE - DEFUELED | ||
| COOPER 1 | 100 | ||||
| DIABLO CANYON 1 | 100 | ||||
| DIABLO CANYON 2 | 100 | ||||
| FT CALHOUN 1 | 100 | ||||
| GRAND GULF 1 | 100 | ||||
| PALO VERDE 1 | 100 | ||||
| PALO VERDE 2 | 0 | 03/26/1999 | REFUELING OUTAGE - DEFUELED | ||
| PALO VERDE 3 | 100 | ||||
| RIVER BEND 1 | 0 | 04/03/1999 | REFUELING OUTAGE - | * | |
| SAN ONOFRE 2 | 100 | ||||
| SAN ONOFRE 3 | 0 | 03/27/1999 | REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS | ||
| SOUTH TEXAS 1 | 0 | 03/26/1999 | REFUELING OUTAGE - DEFUELED | * | |
| SOUTH TEXAS 2 | 100 | ||||
| WASHINGTON NUCLEAR 2 | 85 | HOLDING POWER AT THIS LEVEL FOR ECONOMIC DISPATCH UNTIL PERFORMANCE OF A PLA | |||
| WATERFORD 3 | 100 | ||||
| WOLF CREEK 1 | 0 | 04/03/1999 | ENTERING REFUELING OUTAGE - | * |