The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 21, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 98   POWER LIMITED DUE TO A MOISTURE SEPARATOR REHEATER BEING OUT OF SERVICE    
BEAVER VALLEY 2 0 02/26/1999 REFUELING OUTAGE - FUEL RELOAD IN PROGRESS    
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 03/12/1999 REFUELING OUTAGE    
FITZPATRICK 1 100        
GINNA 1 0 03/01/1999 REFUELING OUTAGE - DEFUELED    
HOPE CREEK 1 0 02/12/1999 REFUELING OUTAGE -REFUELED *  
INDIAN POINT 2 99   MAXIMUM OPERATING POWER *  
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 91   COASTDOWN TO REFUELING OUTAGE    
MILLSTONE 2 0 02/20/1996 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 78   INCREASING POWER FOLLOWING FEED PUMP SWAP *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 80   PROBLEM WITH DEBRIS IN THE INTAKE    
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 0 03/12/1999 REFUELING OUTAGE - CORE ALTERATIONS IN PROGRESS    
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 91   COASTDOWN TO REFUELING OUTAGE    
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 99   COASTDOWN    
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 50   WILL OPERATE AT THIS POWER FOR 45 DAYS TO AVOID COASTDOWN DURING PEAK AUGUST    
HARRIS 1 100     *  
HATCH 1 0 03/01/1999 REFUELING OUTAGE    
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100        
MCGUIRE 2 0 03/12/1999 REFUELING OUTAGE *  
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 76   COASTDOWN TO REFUELING OUTAGE *  
SUMMER 1 96   COASTDOWN TO REFUELING OUTAGE *  
SURRY 1 100        
SURRY 2 83   COASTDOWN TO REFUELING OUTAGE    
TURKEY POINT 3 100        
TURKEY POINT 4 0 03/15/1999 REFUELING OUTAGE    
VOGTLE 1 0 02/27/1999 REFUELING OUTAGE - FUEL RELOAD COMPLETE    
VOGTLE 2 100        
WATTS BAR 1 0 02/27/1999 REFUELING OUTAGE - REFUELING *  

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 0 09/06/1996 REFUELING OUTAGE    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 99     *  
DRESDEN 3 86   MAXIMUM OPERATING POWER - REDUCING POWER TO ENTER DRYWELL TO LOOK FOR LEAK *  
DUANE ARNOLD 1 100        
FERMI 2 97   POWER LIMITED DUE TO POWER UPRATE ISSUES    
KEWAUNEE 1 97   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING    
LASALLE 1 100        
LASALLE 2 0 09/20/1996 REFUELING OUTAGE - DEFUELED    
MONTICELLO 1 100        
PALISADES 1 90   REDUCED POWER FOR REPAIR OF A HEATER DRAIN PUMP *  
PERRY 1 79   COASTDOWN TO REFUELING OUTAGE - REDUCED POWER FOR ROD TESTING *  
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 0 03/20/1999 SHUTDOWN FOR REFUELING OUTAGE *  
COOPER 1 76   REDUCED POWER FOR TURBINE TESTING *  
DIABLO CANYON 1 100     *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 97   COASTDOWN *  
PALO VERDE 3 100        
RIVER BEND 1 80   POWER SUPPRESSED DUE TO FUEL LEAKERS    
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 85   COASTDOWN TO REFUELING OUTAGE    
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 65   LOAD FOLLOW    
WATERFORD 3 0 02/19/1999 REFUELING OUTAGE - REACTOR VESSEL REASSEMBLY    
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021