The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 15, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 99   MAXIMUM OPERATING POWER *  
BEAVER VALLEY 2 0 02/26/1999 REFUELING OUTAGE - DEFUELED    
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 0 03/12/1999 ENTERING REFUELING OUTAGE    
FITZPATRICK 1 100        
GINNA 1 0 03/01/1999 REFUELING OUTAGE - DEFUELED    
HOPE CREEK 1 0 02/12/1999 REFUELING OUTAGE - FUEL LOAD IN PROGRESS *  
INDIAN POINT 2 100     *  
INDIAN POINT 3 58   HOLDING POWER AT THIS LEVEL TO TROUBLESHOOT A MAIN FEEDWATER PUMP DISCHARGE *  
LIMERICK 1 100        
LIMERICK 2 93   COASTDOWN TO REFUELING OUTAGE *  
MILLSTONE 2 0 02/20/1996 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100     *  
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 0 03/12/1999 REFUELING OUTAGE - REACTOR VESSEL HEAD REMOVAL IN PROGRESS *  
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 93   COASTDOWN TO REFUELING OUTAGE *  
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100     *  
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 0 03/12/1999 MAINTENANCE OUTAGE DUE TO AN AUTOMATIC REACTOR TRIP/TURBINE TRIP FROM 100% P *  
HATCH 1 0 03/01/1999 REFUELING OUTAGE - INSPECTING FUEL PRIOR TO PERFORMANCE OF A FUEL SHUFFLE    
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100        
MCGUIRE 2 0 03/12/1999 ENTERING REFUELING OUTAGE    
NORTH ANNA 1 98   HOLDING POWER AT THIS LEVEL TO CONVERT FROM A STEAM FLOW CALORIMETRIC TO A F *  
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 99   INCREASING POWER FOLLOWING A LOAD REDUCTION TO 98% POWER FOR THE PERFORMANCE *  
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 81   COASTDOWN TO REFUELING OUTAGE    
SUMMER 1 100        
SURRY 1 100        
SURRY 2 87   COASTDOWN TO REFUELING OUTAGE    
TURKEY POINT 3 100        
TURKEY POINT 4 0 03/15/1999 ENTERING REFUELING OUTAGE *  
VOGTLE 1 0 02/27/1999 REFUELING OUTAGE - FUEL RELOAD COMPLETE *  
VOGTLE 2 100        
WATTS BAR 1 0 02/27/1999 REFUELING OUTAGE - DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100     *  
BYRON 1 100        
BYRON 2 80   HOLDING POWER AT THIS LEVEL TO PERFORM TURBINE VALVE TESTING *  
CLINTON 1 0 09/06/1996 REFUELING OUTAGE    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 100     *  
DRESDEN 3 99   MAXIMUM OPERATING POWER    
DUANE ARNOLD 1 99   LETTING XENON BUILD IN AND INCREASING POWER FOLLOWING A REDUCTION TO APPROXI *  
FERMI 2 97   POWER LIMITED DUE TO POWER UPRATE ISSUES    
KEWAUNEE 1 98   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING *  
LASALLE 1 100        
LASALLE 2 0 09/20/1996 REFUELING OUTAGE - DEFUELED    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 92   COASTDOWN TO REFUELING OUTAGE *  
POINT BEACH 1 100     *  
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 99   MAXIMUM OPERATING POWER DUE TO JET PUMP RISER BRACE LIMITATIONS *  
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 20   UNIT ON LINE AFTER EXITING A REFUELING OUTAGE - PLAN TO INCREASE POWER FOLL *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100     *  
PALO VERDE 2 100        
PALO VERDE 3 99   HOLDING POWER AT THIS LEVEL TO PERFORM HIGH RATE BLOWDOWNS *  
RIVER BEND 1 81   POWER SUPPRESSED DUE TO FUEL LEAKERS    
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 89   COASTDOWN TO REFUELING OUTAGE *  
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 88   INCREASING POWER AFTER HOLDING AT APPROXIMATELY 65% POWER FOR LOAD FOLLOWING *  
WATERFORD 3 0 02/19/1999 REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS    
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021