Power Reactor Status Report for March 13, 1999
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BEAVER VALLEY 1 | 98 | ||||
BEAVER VALLEY 2 | 0 | 02/26/1999 | REFUELING OUTAGE - DEFUELED | * | |
CALVERT CLIFFS 1 | 100 | ||||
CALVERT CLIFFS 2 | 0 | 03/12/1999 | REFUELING OUTAGE | * | |
FITZPATRICK 1 | 100 | ||||
GINNA 1 | 0 | 03/01/1999 | REFUELING OUTAGE - DEFUELED | ||
HOPE CREEK 1 | 0 | 02/12/1999 | REFUELING OUTAGE - DEFUELED | ||
INDIAN POINT 2 | 70 | REDUCED POWER TO REPLACE 1st STAGE TURBINE PRESSURE TRANSMITTER | * | ||
INDIAN POINT 3 | 58 | HOLDING POWER WHILE TROUBLESHOOTING MAIN FEED PUMP | * | ||
LIMERICK 1 | 100 | ||||
LIMERICK 2 | 94 | COASTDOWN TO REFUELING OUTAGE | |||
MILLSTONE 2 | 0 | 02/20/1996 | REFUELING OUTAGE | ||
MILLSTONE 3 | 100 | ||||
NINE MILE POINT 1 | 100 | ||||
NINE MILE POINT 2 | 100 | ||||
OYSTER CREEK 1 | 100 | ||||
PEACH BOTTOM 2 | 100 | ||||
PEACH BOTTOM 3 | 60 | HOLDING POWER FOR PLANNED MAINTENANCE - EXPECT TO INCREASE POWER LATER TODAY | * | ||
PILGRIM 1 | 100 | ||||
SALEM 1 | 100 | ||||
SALEM 2 | 100 | ||||
SEABROOK 1 | 100 | ||||
SUSQUEHANNA 1 | 100 | ||||
SUSQUEHANNA 2 | 0 | 03/12/1999 | REFUELING OUTAGE | * | |
THREE MILE ISLAND 1 | 100 | ||||
VERMONT YANKEE 1 | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BROWNS FERRY 1 | 0 | 03/03/1985 | DEFUELED | ||
BROWNS FERRY 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
BROWNS FERRY 3 | 100 | ||||
BRUNSWICK 1 | 100 | ||||
BRUNSWICK 2 | 100 | ||||
CATAWBA 1 | 100 | ||||
CATAWBA 2 | 100 | ||||
CRYSTAL RIVER 3 | 100 | ||||
FARLEY 1 | 100 | ||||
FARLEY 2 | 100 | ||||
HARRIS 1 | 0 | 03/12/1999 | RX TRIP/TURBINE TRIP DUE TO FEED REG VALVE CONTROL FAILURE - SEE EVENT #3546 | * | 1 |
HATCH 1 | 0 | 03/01/1999 | REFUELING OUTAGE - RV HEAD REMOVED | ||
HATCH 2 | 98 | ||||
MCGUIRE 1 | 100 | ||||
MCGUIRE 2 | 0 | 03/12/1999 | REFUELING OUTAGE | * | |
NORTH ANNA 1 | 100 | ||||
NORTH ANNA 2 | 100 | * | |||
OCONEE 1 | 100 | ||||
OCONEE 2 | 100 | ||||
OCONEE 3 | 100 | ||||
ROBINSON 2 | 100 | ||||
SAINT LUCIE 1 | 100 | ||||
SAINT LUCIE 2 | 100 | ||||
SEQUOYAH 1 | 100 | ||||
SEQUOYAH 2 | 83 | COASTDOWN TO REFUELING OUTAGE | |||
SUMMER 1 | 100 | ||||
SURRY 1 | 100 | ||||
SURRY 2 | 88 | COASTDOWN TO REFUELING OUTAGE | * | ||
TURKEY POINT 3 | 100 | ||||
TURKEY POINT 4 | 50 | COASTDOWN TO REFUELING OUTAGE - REDUCED POWER TO PERFORM SECONDARY WORK PRIO | * | ||
VOGTLE 1 | 0 | 02/27/1999 | REFUELING OUTAGE - RELOADING IN PROGRESS | ||
VOGTLE 2 | 100 | ||||
WATTS BAR 1 | 0 | 02/27/1999 | REFUELING OUTAGE - DEFUELED |
Region 3
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
BRAIDWOOD 1 | 100 | ||||
BRAIDWOOD 2 | 90 | REDUCED POWER FOR SECONDARY MAINTENANCE | * | ||
BYRON 1 | 100 | ||||
BYRON 2 | 100 | ||||
CLINTON 1 | 0 | 09/06/1996 | REFUELING OUTAGE | ||
COOK 1 | 0 | 09/08/1997 | MAINTENANCE OUTAGE | ||
COOK 2 | 0 | 09/09/1997 | REFUELING OUTAGE | ||
DAVIS BESSE 1 | 100 | ||||
DRESDEN 2 | 100 | ||||
DRESDEN 3 | 100 | * | |||
DUANE ARNOLD 1 | 100 | ||||
FERMI 2 | 97 | POWER LIMITED DUE TO POWER UPRATE ISSUES | |||
KEWAUNEE 1 | 97 | POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING | |||
LASALLE 1 | 100 | ||||
LASALLE 2 | 0 | 09/20/1996 | REFUELING OUTAGE - DEFUELED | ||
MONTICELLO 1 | 100 | ||||
PALISADES 1 | 100 | ||||
PERRY 1 | 92 | COASTDOWN | |||
POINT BEACH 1 | 100 | ||||
POINT BEACH 2 | 87 | INCREASING POWER | * | ||
PRAIRIE ISLAND 1 | 100 | ||||
PRAIRIE ISLAND 2 | 100 | ||||
QUAD CITIES 1 | 100 | * | |||
QUAD CITIES 2 | 100 | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report(*) | Number of Scrams(#) |
---|---|---|---|---|---|
ARKANSAS NUCLEAR 1 | 100 | ||||
ARKANSAS NUCLEAR 2 | 100 | ||||
CALLAWAY 1 | 100 | ||||
COMANCHE PEAK 1 | 100 | ||||
COMANCHE PEAK 2 | 95 | HOLDING POWER FOR SECONDARY MAINTENANCE | * | ||
COOPER 1 | 100 | ||||
DIABLO CANYON 1 | 0 | 02/07/1999 | PREPARING FOR PLANT STARTUP FROM REFUELING OUTAGE | * | |
DIABLO CANYON 2 | 100 | ||||
FT CALHOUN 1 | 100 | ||||
GRAND GULF 1 | 100 | ||||
PALO VERDE 1 | 12 | HOLDING POWER WITH GENERATOR ONLINE | * | ||
PALO VERDE 2 | 100 | ||||
PALO VERDE 3 | 100 | ||||
RIVER BEND 1 | 81 | POWER SUPPRESSED DUE TO FUEL LEAKERS | |||
SAN ONOFRE 2 | 100 | ||||
SAN ONOFRE 3 | 100 | ||||
SOUTH TEXAS 1 | 91 | COASTDOWN TO REFUELING OUTAGE | * | ||
SOUTH TEXAS 2 | 100 | ||||
WASHINGTON NUCLEAR 2 | 65 | LOAD FOLLOWING | * | ||
WATERFORD 3 | 0 | 02/19/1999 | REFUELING OUTAGE | ||
WOLF CREEK 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021