The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for February 26, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 28   PERFORMING A CHEMISTRY HOLD AFTER EXITING A MAINTENANCE OUTAGE *  
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 71   COASTDOWN TO REFUELING OUTAGE *  
HOPE CREEK 1 0 02/12/1999 REFUELING OUTAGE- CORE OFFLOAD IN PROGRESS    
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 97   COASTDOWN TO REFUELING OUTAGE    
MILLSTONE 2 0 02/20/1996 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 98   HOLDING POWER AT THIS LEVEL TO PERFORM MAINTENANCE ON THE FOURTH POINT HEATE *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 100        
MCGUIRE 2 87   COASTDOWN TO REFUELING OUTAGE *  
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 0 02/23/1999 PLANNED MAINTENANCE OUTAGE - STEAM GENERATOR RISER LEAK REPAIR ALMOST COMPLE *  
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 98   HOLDING POWER AT THIS LEVEL TO INVESTIGATE FEEDWATER FLOW PROBLEMS    
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 95   COASTDOWN TO REFUELING OUTAGE    
SUMMER 1 100        
SURRY 1 100        
SURRY 2 98   COASTDOWN TO REFUELING OUTAGE *  
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 88   COASTDOWN TO REFUELING OUTAGE *  
VOGTLE 2 100     *  
WATTS BAR 1 65   COASTDOWN TO REFUELING OUTAGE - PLAN TO TAKE UNIT OFF LINE AROUND MIDNIGHT T *  

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 95   HOLDING POWER AT THIS LEVEL TO PERFORM AUXILIARY FEEDWATER FULL FLOW TESTING *  
BYRON 2 100        
CLINTON 1 0 09/06/1996 REFUELING OUTAGE    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 99        
DRESDEN 3 24   HOLDING POWER AT THIS LEVEL TO PERFORM SURVEILLANCE TESTING AFTER EXITING A *  
DUANE ARNOLD 1 100        
FERMI 2 97   POWER LIMITED DUE TO POWER UPRATE ISSUES    
KEWAUNEE 1 97   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING    
LASALLE 1 100        
LASALLE 2 0 09/20/1996 REFUELING OUTAGE - DEFUELED    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 98   COASTDOWN TO REFUELING OUTAGE    
POINT BEACH 1 100        
POINT BEACH 2 0 02/02/1999 EXITING REFUELING OUTAGE - HOLDING RCS AT 535�F TO PERFORM ROD TESTING *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 99   LOAD FOLLOWING *  
QUAD CITIES 2 0 02/20/1999 OUTAGE TO PERFORM TECH SPEC SURVEILLANCE TESTING    

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 21   INCREASING POWER AFTER EXITING A REFUELING OUTAGE - PLAN TO STOP THE POWER A *  
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 0 02/07/1999 REFUELING OUTAGE - DEFUELED - PLAN TO COMMENCE FUEL RELOAD SOMETIME THIS EV *  
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 0 02/21/1999 MAINTENANCE OUTAGE *  
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 58   POWER SUPPRESSED DUE TO FUEL LEAKERS - HOLDING POWER AT THIS LEVEL TO PERFOR *  
SAN ONOFRE 2 15   EXITING REFUELING OUTAGE - REACTOR STARTUP IN PROGRESS - PLAN TO PLACE UNIT *  
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 85   LOAD FOLLOWING *  
WATERFORD 3 0 02/19/1999 REFUELING OUTAGE - REACTOR VESSEL HEAD DETENSIONED *  
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.