The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for January 24, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 0 01/23/1999 REDUCED POWER TO 90% FOR WATERBOX CLEANING - MANUAL REACTOR TRIP FROM 73% DU * 1
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 99        
MILLSTONE 2 0 02/20/1996 REFUELING OUTAGE - REFUELED - PLAN TO ENTER MODE 5 TODAY *  
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 70   HOLDING POWER AT THIS LEVEL DUE TO A LEAK IN THE 'A' FEEDWATER STRING MINIMU    
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 39   HOLDING POWER AT THIS LEVEL TO REPAIR A LEAK IN THE '3C' FEEDWATER HEATER *  
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 0 01/23/1999 REDUCED POWER TO 30% TO PERFORM RECIRC MG SET BRUSH REPLACEMENT - MANUAL REA * 1
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100     *  
HATCH 1 100        
HATCH 2 98   POWER LIMITED BY TURBINE SINCE REACTOR POWER UPRATE    
MCGUIRE 1 100        
MCGUIRE 2 95   HOLDING POWER AT THIS LEVEL TO FACILITATE REACTOR PROTECTION SYSTEM CHANNEL *  
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 85   COASTDOWN TO REFUELING OUTAGE *  

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 0 09/06/1996 REFUELING OUTAGE    
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 99        
DRESDEN 3 73   HOLDING POWER AT THIS LEVEL TO PERFORM ROD SWAPS *  
DUANE ARNOLD 1 100        
FERMI 2 97   ADMINISTRATIVE POWER LIMIT    
KEWAUNEE 1 95   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING    
LASALLE 1 100        
LASALLE 2 0 09/20/1996 REFUELING OUTAGE - DEFUELED    
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 80   HOLDING POWER AT THIS LEVEL TO PERFORM ROD PATTERN CHANGES *  
POINT BEACH 1 0 01/22/1999 MAINTENANCE OUTAGE - TECH SPEC REQUIRED SHUTDOWN FROM 100% POWER DUE TO WEST *  
POINT BEACH 2 0 12/04/1998 REFUELING OUTAGE - DEFUELED    
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 0 01/09/1999 REFUELING OUTAGE - DEFUELED    
CALLAWAY 1 93   JUST STARTED INCREASING POWER AFTER DECREASING TO 93% TO PERFORM TURBINE CON *  
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100     *  
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 0 01/13/1999 MAINTENANCE OUTAGE    
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 95   POWER LIMITED DUE TO ROD CONFIGURATION AND RECIRC FLOW LIMITATIONS    
SAN ONOFRE 2 0 01/02/1999 REFUELING OUTAGE - DEFUELED    
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100     *  
WASHINGTON NUCLEAR 2 100        
WATERFORD 3 98   COASTDOWN TO REFUELING OUTAGE    
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021