Part 21 Report - 2001-240
ENTERGY |
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc. Indian Point 3 NPP P.O. Box 308 Buchanan. NY 10511 Tel 914 736 8001 Fax 736 8012 |
Robert J. Barrett Vice President, Operations-IP3 |
July 9, 2001
IPN-01-052
U.S. Nuclear Regulatory Commission
ATTN: Document Control Desk
Mail Stop O-P1-17
Washington, DC 20555-0001
SUBJECT: | Indian Point 3 Nuclear Power Plant Docket No.50-286 License No. DPR-64 0 CFR 21 Interim Report Failure During Post Installation Testing of Replacement Governor Manufactured by Woodward Governor and Refurbished by Engine Systems, Inc. |
Dear Sir:
The attached Interim Report is being submitted in accordance with 10 CFR 21 (a)(2) to address a potentially reportable equipment failure. A replacement governor installed on the 32 Emergency Diesel Generator failed during post installation testing. The governor has been returned to Engine Systems Inc. for failure analysis to determine if there is a deviation that would make the failure a reportable defect.
Indian Point 3 is not making any new commitments associated with this letter. If you have any questions regarding this submittal, please contact Mr. J. Donnelly.
Very truly yours,
Robert J. Barrett
Vice President Operations
Indian Point 3 Nuclear Plant
cc: see next page
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021