The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Part 21 Report - 1999-440

ACCESSION #: 9908090058


10CFR21 Substantial Safety Hazard Evaluation Interim Report

R. E. GINNA NUCLEAR POWER PLANT

1. DISCOVERY DATE: 6/18/99
2. DESCRIPTION OF DEFICIENCY:
A safety related DB-25 Breaker Mechanism, procured from Westinghouse, did not pass degradation checks when drawn from stock to be installed into Bus15/03A. The Breaker Mechanism has holes drilled that do not line-up, causing the pin above the toggle lever to be out of alignment. Also, the right rear quarter section of the tripper pan is bent upward, giving us unsatisfactory tripper bar gaps.
3. REFERENCES:
Rochester Gas & Electric Purchase Order NQ-15795-A-JW
4. DATE WHEN EVALUATION WILL BE COMPLETED:
A purchase requisition has been sent to Westinghouse for a failure mode assessment. It is estimated that the evaluation will be completed by December 1, 1999.
Prepared By:
Engineer Date
Reviewed By:
Engineering Manager or designee Date:
Approved By:
PORC Chairman Date:


*** END OF DOCUMENT ***