Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Part 21 Report - 1999-420

 

 

LICENSEE: SWAGELOK COMPANY      
SITE: SWAGELOK COMPANY   EN NUMBER: 36263
DOCKET:     EVENT DATE: 10-04-99
RX TYPE:     EVENT TIME:  
VENDORS:     NOTIFY DATE: 10-06-99
EMERGENCY CLASS: N/A REGION: 3 STATE: OH TIME: 09:48
OPS OFFICER: LEIGH TROCINE      
10 CFR SECTION: CCCC UNSPECIFIED PARAGRAPH

POSSIBLE 10-CFR-PART-21 REPORT REGARDING A POSSIBLE DEFECT IN A SWAGELOK TUBE FITTING

The following text is a portion of a facsimile submitted by Swagelok Company:

"This is a preliminary notification of a possible defect in a Swagelok tube fitting, part number SS-400-3-4TTM, male branch tee. A drawing of the part is included with this notification. We are also notifying each of the involved utilities."

"We became aware of this on October 4, 1999."

"The defect is a crack in the seat of the fitting. We are continuing our analysis of the part and will provide further details in accordance with NRC timetables."

"[The] following are the six utilities to whom we have sold these parts:

Georgia Power [Company], Plant Vogtle, ... , 10 pcs. ... [;]
Duke Power Company, Oconee Nuclear Station, ... , 100 pcs. ... [;]
Arizona Public Service Co., Palo Verde Nuclear Generating Station, ... , 15 pcs. ... [;]
North Atlantic Energy Service Co., Seabrook Station, ... , 10 pcs. ... [;]
Virginia Power, Surry Power Station, ... , 3 pcs. ... [; and]
Omaha Public Power District, Ft. Calhoun Nuclear Station, ... , 10 Pcs. ... ."

(Call the NRC operations officer for Swagelok contact information.)