Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Part 21 Report - 1999-080

 

 

LICENSEE: ABB COMBUSTION ENGINEERING
SITE: ABB COMBUSTION ENGINEERING EN NUMBER: 35273
DOCKET:   EVENT DATE: 01-15-99
RX TYPE:   EVENT TIME: 16:37
VENDORS:   NOTIFY DATE: 01-15-99
EMERGENCY CLASS: N/A REGION: 1 STATE: CT TIME: 16:37
OPS OFFICER: STEVE SANDIN
10 CFR SECTION: CCCC UNSPECIFIED PARAGRAPH

PART 21 NOTIFICATION RELATED TO THE XL-S96 CPR CORRELATION FOR SVEA-96 FUEL

"The purpose of this letter is to notify the Nuclear Regulatory Commission of a defect as defined in 10 CFR 21, 'Reporting of Defects and Noncompliance.' The defect concerns the XL-S96 Critical Power Ratio (CPR) correlation for ABB SVEA-96 fuel assemblies for Boiling Water Reactors (BWRs). Specifically, the defect concerns the XL-S96 CPR correlation, which is based solely on a cosine axial power shape. The defect could lead to non-conservative Operating Limit MCPRs and monitored CPRs for top-peaked axial power shapes.

"The Enclosure summarizes the evaluation performed by ABB Combustion Engineering (ABB-CE). If you have any questions, please feel free to contact me [Ian C. Rickard] or Mr. Virgil Paggen of my staff."

This event effects WNP-2 current operating cycle (Cycle 14).


 