Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Part 21 Report - 1997-560

LICENSEE: ABB COMBUSTION ENGINEERING SITE: ABB COMBUSTION ENGINEERING EN NUMBER:32762 DOCKET: EVENT DATE: 08-14-97 RX TYPE: EVENT TIME: 00:00 VENDORS: NOTIFY DATE: 08-14-97 EMERGENCY CLASS: N/A REGION: 1 STATE: CT TIME: 14:24 OPS OFFICER: BOB STRANSKY 10 CFR SECTION: CCCC 21.21 UNSPECIFIED PARAGRAPH 10 CFR PART 21 REPORT ENERGY REDISTRIBUTION FACTORS USED IN LARGE-BREAK LOSS OF COOLANT ACCIDENT ANALYSES DO NOT DIRECTLY REFLECT THE EFFECTS OF MODERATOR VOIDING. SPECIFICALLY, THE ENERGY REDISTRIBUTION FACTORS ARE UNDER PREDICTED BY 0.5% TO 1.5%. THIS CORRESPONDS TO A 20�F TO 60�F INCREASE IN PEAK CLAD TEMPERATURE DURING LARGE-BREAK LOSS OF COOLANT ACCIDENTS. THE FOLLOWING UNITS ARE AFFECTED: PALO VERDE UNITS 1, 2, AND 3; SAN ONOFRE UNITS 2 AND 3; WATERFORD UNIT 3; ARKANSAS NUCLEAR ONE UNIT 2; CALVERT CLIFFS UNITS 1 AND 2; AND SAINT LUCIE UNIT 2.

Page Last Reviewed/Updated Wednesday, March 24, 2021

Page Last Reviewed/Updated Wednesday, March 24, 2021