The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Part 21 Report - 1996-631

ACCESSION #: 9607180070 NOTE: This text document was processed from a scanned version or an electronic submittal and was processed as received. Some tables, figures, strikeouts, redlines, and enclosures are not included with this submittal, and are omitted due to ASCII text conversion limitations. In order to view this document in its entirety, you may wish to use the NUDOCS microfiche in addition to the electronic text. POWER REACTOR EVENT NUMBER: 30752 FACILITY: SUMMER REGION: 2 NOTIFICATION DATE: 07/15/96 UNIT: [1] [ ] [ ] STATE: SC NOTIFICATION TIME: 16:15 [ET] RX TYPE: [1] W-3-LP EVENT DATE: 05/17/96 EVENT TIME: 00:00[EDT] NRC NOTIFIED BY: ZACCONE LAST UPDATE DATE: 07/15/96 HQ OPS OFFICER: BOB STRANSKY NOTIFICATIONS EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION: CDEF 21.21(b)(2) DEFECTS/NONCOMPLIANCE V. HODGE NRR UNIT SCRAM CODE RX CRIT INIT PWR INIT RX MODE CURR PWR CURR RX MODE 1 N N 0 HOT SHUTDOWN 0 HOT SHUTDOWN EVENT TEXT 10 CFR PART 21 REPORT REGARDING FAILURES OF ABB/ITE 27N RELAYS. THE FOLLOWING IS TEXT OF A FACSIMILE SUBMITTED BY THE LICENSEE: "NONCONFORMANCE NOTICE 5472 REPORTS THE THIRD FAILURE OF ABB/ITE 27N RELAYS AT V.C. SUMMER NUCLEAR STATION WITHIN A THREE YEAR PERIOD. IN EACH CASE, THE TIMER INTEGRATED CIRCUIT US WAS DETERMINED TO BE DEFECTIVE. IN ALL CASES, V.C. SUMMER NUCLEAR STATION ENSURED THAT THE ASSOCIATED APPLICATIONS WERE RESTORED TO OPERABLE STATUS UPON IDENTIFICATION, REPLACEMENNT AND TESTING OF THE RESPECTIVE 27N RELAYS. ABB HAS NOT ESTABLISHED A ROOT CAUSE FOR WHAT APPEARS TO BE A REPETITIVE FAILURE OF THE US TIMER. THIS REPORT IS BEING MADE PURSUANT TO 10 CFR PART 21." THE NRC RESIDENT INSPECTOR HAS BEEN INFORMED BY THE LICENSEE. Form "EVENT NOTIFICATION WORKSHEET" omitted. Form "SUBSTANTIAL SAFETY HAZARD (SSH) EVALUATION TRACKING SHEET" omitted. *** END OF DOCUMENT ***

Page Last Reviewed/Updated Wednesday, March 24, 2021