Part 21 Report - 1995-215
ACCESSION #: 9511020336 Rosemount Nuclear Instruments Rosemount Nuclear Instruments, Inc. 12001 Technology Drive Eden Prairie, MN 55344 USA Tel 1 (612) 828-8252 Fax 1 (612) 828-8280 October 26, 1995 Re: Additional Information Regarding Notification under 10 CFR Part 21 of July 12, 1995, Revision to Instruction Manual 4235. Rosemount Nuclear Instruments, Inc. (RNII) is writing to inform you of an additional issue in an old revision to Instruction Manual 4235 for the Model 1152 nuclear qualified transmitter. You were previously notified in the July 12, 1995 letter that the October 1992 revision to Instruction Manual 4235 inadvertently specified an incorrect process O-ring for use with 1152 High Differential Pressure Transmitters (Model 1152HP). The previous revision to Instruction Manual 4235, dated January 1988, specified the correct O-ring for use with these transmitters. An older revision, revision A, dated 11/82 also specifies the incorrect O-ring for the 1152 High Differential Pressure Transmitters (Model 1152HP). Model 1152 transmitters are offered in Gage, Absolute, Differential and High Differential pressure types. Process O-rings are used to seal the sensor module to the process flange interface. The material of the process O-ring is ethylene propylene rubber for all types of Model 1152 transmitters. Model 1152HP transmitters are specified with process O-rings having a higher durometer (hardness rating) than process O-rings specified for Gage (except Range 9 and 0), Absolute, or Differential types. The higher durometer O-ring provides sealing of the process flange interface when subjected to operating pressures up to the specified 4500 psig over the specified operating temperature range of the 1152 High Differential Pressure transmitter. RNII has revised Instruction Manual 4235 to specify the correct process O-ring kit part number and distributed them to users. This revision, MAN 4235A00 dated July 1995 should be used for all Model 1152 transmitters (except Model 1152 T0280) regardless of the shipment date. 1.0 Name and address of the individual providing the information: Mr. Mark Van Sloun Vice President & General Manager Rosemount Nuclear Instruments, Inc. 12001 Technology Drive Eden Prairie, MN 55344 FISHER-ROSEMOUNT Additional information to 10CFR21 Notification Instruction Manual 4235 October 26, 1995 2.0 Identification of items supplied: Instruction Manual 4235, Revision A (dated 11/82), for the Model 1152 transmitter incorrectly specified a lower durometer process O- ring kit to be used with Model 1152 High Differential Pressure transmitters (Model 1152HP). The Instruction Manual states on page 17, Table 3, "1152 Spare Parts", O-ring for Process Flange, Range Code 3-8, Model 1152HP kit part number 01152-0067-0001. The correct kit part number for this O-ring for Process Flange is 01152-0067- 0002. 3.0 Identification of firm supplying the item: Rosemount Nuclear Instruments, Inc. 12001 Technology Drive Eden Prairie, MN 55344 4.0 Nature of the failure and potential safety hazard: The difference between the process O-rings is the durometer (hardness rating). The Model 1152HP, Range Code 3-8, transmitters are specified to use a process O-ring having a higher durometer than Model 1152 Gage (Except Range Code 9 and 0), Absolute, or Differential types. RNII does not have sufficient information to determine the safety impact related to plant applications. Licensees must determine the impact on plant operations and plant safety and take action as deemed necessary. FISHER-ROSEMOUNT Additional information to 10CFR21 Notification Instruction Manual 4235 October 26, 1995 5.0 The corrective action which is taken, the name of the individual or organization responsible for that action and the length of time taken to complete that action: RNII has revised Manual 4235. The current manual, MAN 4235A00, revision July 1995 was distributed to users October 13, 1995. Mr. Van Sloun is responsible for any further action related to this issue. 6.0 Any advice related to the potential failure of the item: The end user must determine the full scope of this deviation as it relates to plant operations and plant safety and take action as deemed necessary. Rosemount Nuclear Instruments, Inc. has a strong commitment to the nuclear industry and assures you that we are dedicated to the supply of high quality products and services to our customers. We are sorry for any inconvenience. If there are any questions, or you require additional information related to this issue, please contact Tim Layer (612) 828-8240 or Jane Sandstrom and Ian Baldry (612) 828-8250. Sincerely, ROSEMOUNT NUCLEAR INSTRUMENTS, INC. M. L. Van Sloun Vice President & General Manager MVS:JDS FISHER-ROSEMOUNT *** END OF DOCUMENT ***
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021