Part 21 Report - 1995-198
ABB COMBUSTION ENGINEERING 29263 08-31-95 OTH LICENSEE: ABB COMBUSTION ENGINEERING SITE: .ABB COMBUSTION ENGINEERING . EN NUMBER:29263 DOCKET: EVENT DATE: 08-31-95 RX TYPE: EVENT TIME: 00:00 VENDORS: NOTIFY DATE: 08-31-95 EMERGENCY CLASS: N/A REGION: 1 STATE: CT TIME: 10:47 OPS OFFICER: JOSEPH SEBROSKY 10 CFR SECTION: CCCC 21.21 UNSPECIFIED PARAGRAPH ABB COMBUSTION ENGINEERING (CE) OF WINDSOR, CONNECTICUT, REPORTED A DEFECT IN A REACTOR PROTECTION SYSTEM (RPS) SUB-COMPONENT IN ACCORDANCE WITH 10 CFR PART 21. THE DEFECT WAS THE PRESENCE OF A HARD WIRED CONNECTION IN EACH OF THE FOUR CONTAINMENT HIGH PRESSURE TRIP LOGIC CIRCUITS PROVIDED TO CONSUMERS POWER COMPANY FOR THE PALISADES NUCLEAR POWER PLANT. THE DEFECT CAUSES THE RPS TO BE UNABLE TO TRIP THE REACTOR ON A VALID HIGH CONTAINMENT PRESSURE SIGNAL. THE PROBLEM HAS BEEN CORRECTED AT PALISADES, AND CE HAS NO REASON TO BELIEVE THAT THIS REPORTABLE CONDITION APPLIES TO ANY OTHER PLANT FOR WHICH CE DESIGNED THE NUCLEAR STEAM SUPPLY SYSTEM.
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021