ACCESSION #: 9504140101 TVA Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381 APR 3 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: In the Matter of the Application of ) Docket Nos. 50-390 Tennessee Valley Authority ) 50-391 WATTS BAR NUCLEAR PLANT (WBN) UNITS 1 AND 2 - 10 CFR 50.55(e) INTERIM REPORT The purpose of this letter is to provide an interim report to NRC in accordance with the requirements of 10 CFR 50.55 (e)(1)(i). On February 3, 1995, Problem Evaluation Report (PER) WBPER950078 was initiated to document an apparent failure to follow the requirements of Site Standard Practice (SSP) 3.04, "Corrective Action Program." The problem identified in the PER was that some contractor individuals may not have been documenting conditions adverse to quality through any of the WBN Administrative Control Programs identified in SSP-3.04. 10 CFR 50.55(e)(1)(i) requires that deficiencies must be evaluated for reportability within 60 days of discovery. Additional time is required to determine whether the undocumented deficiencies in WBPER950078 could have created a substantial safety hazard, if left uncorrected. This action will be completed by June 3, 1995. The Enclosure identifies the commitment made in this submittal. U.S. Nuclear Regulatory Commission Page 2 APR 3 1995 If you should have any questions, contact P. L. Pace at (615)-365-1824. Sincerely, Raul R. Baron Nuclear Assurance and Licensing Manager (Acting) Enclosure cc (Enclosure): INPO Record Center 700 Galleria Parkway Atlanta, Georgia 30339 NRC Resident Inspector Watts Bar Nuclear Plant Rt. 2, Box 700 Spring City, Tennessee 37381 Mr. P. S. Tam, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 ENCLOSURE 1 WATTS BAR NUCLEAR PLANT - UNITS 1 AND 2 10 CFR 50.55(e)REPORTABILITY DETERMINATION EXTENSION REQUEST DOCKET NOS. 50-390, 391 LIST OF COMMITMENTS The substantial safety hazard evaluation for WBPER950078 will be completed by June 3, 1995. *** END OF DOCUMENT ***
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021