Part 21 Report - 1995-026
ACCESSION #: 9501230101
BW/IP International Inc.
Byron P.O Box Los Angeles Telephone
Jackson 2017 California 213 587 6171
Pumps Terminal 90051 Telex
Annex 677233
United Fax
Centrifugal 213 589 2080
Pumps
Pump
Division
10 January 1995
U. S. Nuclear Regulatory Commission
Attn: Document Control Desk
Washington, D. C, 20555
Subject: 10CFR, Part 21, Notification No. CFRN 94-03
Gentlemen:
An audit of activities relative to Title 10 of the Code of Federal
Regulations, Part 21, for the 1994 calendar year has recently been
completed. The audit was unable to definitively determine whether
Attachment A, Location Of Equipment, had been sent with Notification No.
CFRN 94-03 submitted on 25 October, 1994.
BW/IP International, Inc., believes the Attachment was correctly included
with the Notification. However, there was no specific reference to
Attachment A contained in the text. All utilities with valves effected
by this Notification were individually informed of the filing and sent a
copy of the Notification on 29 October, 1994, in accordance with our
10CFR, Part 21, procedure.
To assure that the official identification requirement has indeed been
satisfied for this Notification, Supplement 1, attached, adds a reference
to Attachment A to the text and transmits the location of the affected
valves as required by 10CFR, Part 21.
Very truly yours,
D.A. Gibson
Manager Nuclear Products Operations
Attach.
CC: Mr. F. Costanzo, Manager of Engineering
Mr. D. Lattimore, Manager of Quality
Mr. K. Huber, Technical Liaison
Mr. W. Klenner, Product Manager
Mr. G. Sausman, Field Service Operations
NOTIFICATION NO. CFRN 94-03
SUPPLEMENT 1
NOTIFICATION OF A REPORTABLE DATE: 10 January 1995
ISSUE PURSUANT TO 10 CFR 21
TO: U. S. Nuclear Regulatory Commission
Attn: Document Control Desk
Washington, D.C. 20555
NAME AND ADDRESS OF INDIVIDUAL INFORMING THE COMMISSION:
Mr. David Gibson
BW/IP International, Inc.
Pump Division
2300 East Vernon Avenue
Vernon, CA 90058
(213) 587-6171
For Technical Information Contact: Dr. Kent Huber
BW/IP Evaluation No. CFR 93-008
IDENTIFICATION OF THE FACILITY, THE ACTIVITY, OR THE BASIC COMPONENT
SUPPLIED FOR SUCH FACILITY OR ACTIVITY WITHIN THE UNITED STATES WHICH
FAILS TO COMPLY OR CONTAINS A DEFECT:
Basic Component: 6-inch 900# Motor Operated Y-Globe Valve
IDENTIFICATION OF THE FIRM SUPPLYING THE BASIC COMPONENT WHICH FAILS
TO
COMPLY OR CONTAINS A DEFECT:
BW/IP International, Inc.
Pump Division
Successor to:
BW/IP International, Inc
Fluid Controls Division
Successor to:
Borg-Warner Nuclear Valve Division
7500 Tyrone Avenue
Van Nuys, CA 91409
Page 1
NOTIFICATION NO. CFRN 94-03
SUPPLEMENT 1
NATURE OF THE DEFECT OR FAILURE TO COMPLY AND THE SAFETY HAZARD
WHICH IS
CREATED OR COULD BE CREATED BY SUCH DEFECT OR FAILURE TO COMPLY:
Design calculations of stem thrust required to close the valve
were based on the differential pressure acting on the seat area
of the valve. Quantitative measurements of the referenced valve
as part of the EPRI MOV Performance Prediction Program in
response to NRC Generic Letter 89-10, showed that, when flow
through the valve exceeds 5 fps, the stem thrust should be
based on the differential pressure acting across the valve
guide area. Required stem thrust using the valve guide area can
be more than double the value calculated using the seating
area.
The calculated forces are used to size the valve actuator and
motor and to set the actuator torque switch. If the stem thrust
required to close the valve against a differential pressure is
higher than the design value, the valve may fail to perform its
intended safety function.
THE DATE ON WHICH THE INFORMATION OF SUCH DEFECT OR FAILURE TO
COMPLY WAS
OBTAINED:
EPRI completed testing of the referenced valve on 18 October
1993 and notified BW/IP of the findings on 18 October 1993.
BW/IP initiated an evaluation to determine if a reportable
deficiency existed. Prior to completing this evaluation, EPRI
reported the dependence of the stem thrust on flow velocity.
IN THE CASE OF A BASIC COMPONENT WHICH CONTAINS A DEFECT OR FAILS TO
COMPLY, THE NUMBER AND LOCATION OF ALL SUCH COMPONENTS IN USE AT,
SUPPLIED FOR, OR BEING SUPPLIED FOR ONE OR MORE FACILITIES OR
ACTIVITIES
SUBJECT TO THE REGULATIONS:
This Notification applies to all sizes and classes of motor
operated Borg-Warner Y-Globe valves.
See Attachment A for specific station locations. *
Page 2
NOTIFICATION NO. CFRN 94-03
SUPPLEMENT 1
THE CORRECTIVE ACTION WHICH HAS, IS BEING, OR WILL BE TAKEN: THE NAME
OF
THE INDIVIDUAL OR ORGANIZATION RESPONSIBLE FOR THE ACTION: AND THE
LENGTH
OF TIME THAT HAS BEEN OR WILL BE TAKEN TO COMPLETE THE ACTION:
If not already done, utilities should review the set-point
calculations on all installed Borg-Warner Y-globe valves and
take corrective actions as appropriate.
BW/IP has revised the operator selection criteria for new
products.
ANY ADVICE RELATED TO THE DEFECT OF FAILURE TO COMPLY ABOUT THE
FACILITY,
ACTIVITY, OR BASIC COMPONENT THAT HAS BEEN, IS BEING, OR WILL BE GIVEN
TO
PURCHASERS:
BW/IP should be contacted for details and assistance.
Page 3
ATTACHMENT A
NOTIFICATION NO. CFRN 94-03
SUPPLEMENT 1
LOCATION OF EQUIPMENT
1. Florida Power & Light Co.; St. Lucie Station
2. Texas Utilities Generating Co.; Comanche Peak Station
3. Washington Public Power Supply System; WNP-3 SATSOP
4. Tennessee Valley Authority; Watts Bar, Browns Ferry
Stations
5. Entergy Operations; Arkansas Power & Light; ANO-1
6. Arizona Public Service Co.; Palo Verde Station
7. Cleveland Electric Illuminating Co.; Perry Nuclear Station
8. Duke Power Company; Catawba, McGuire Station
Page 4
*** END OF DOCUMENT ***
Page Last Reviewed/Updated Wednesday, March 24, 2021