Part 21 Report - 1995-026

ACCESSION #:  9501230101

                        BW/IP International Inc. 

Byron                   P.O Box           Los Angeles        Telephone
Jackson                 2017              California         213 587 6171 
Pumps                   Terminal          90051              Telex 
                        Annex                                677233 
United                                                       Fax
Centrifugal                                                  213 589 2080
Pumps 

Pump
Division

10 January 1995

U. S. Nuclear Regulatory Commission
Attn: Document Control Desk
Washington, D. C, 20555

Subject: 10CFR, Part 21, Notification No. CFRN 94-03 

Gentlemen:

An audit of activities relative to Title 10 of the Code of Federal
Regulations, Part 21, for the 1994 calendar year has recently been
completed. The audit was unable to definitively determine whether
Attachment A, Location Of Equipment, had been sent with Notification No. 
CFRN 94-03 submitted on 25 October, 1994.

BW/IP International, Inc., believes the Attachment was correctly included
with the Notification. However, there was no specific reference to
Attachment A contained in the text.  All utilities with valves effected
by this Notification were individually informed of the filing and sent a
copy of the Notification on 29 October, 1994, in accordance with our
10CFR, Part 21, procedure.

To assure that the official identification requirement has indeed been
satisfied for this Notification, Supplement 1, attached, adds a reference
to Attachment A to the text and transmits the location of the affected
valves as required by 10CFR, Part 21.

Very truly yours,


D.A. Gibson
Manager Nuclear Products Operations

Attach.

CC:       Mr.  F.  Costanzo, Manager of Engineering 
          Mr.  D.  Lattimore, Manager of Quality 
          Mr.  K.  Huber, Technical Liaison 
          Mr.  W.  Klenner, Product Manager 
          Mr.  G.  Sausman, Field Service Operations


                                              NOTIFICATION NO. CFRN 94-03 
                                                             SUPPLEMENT 1

NOTIFICATION OF A REPORTABLE                        DATE: 10 January 1995
ISSUE PURSUANT TO 10 CFR 21

TO:       U.  S.  Nuclear Regulatory Commission
          Attn: Document Control Desk
          Washington, D.C.  20555

NAME AND ADDRESS OF INDIVIDUAL INFORMING THE COMMISSION:

          Mr.  David Gibson
          BW/IP International, Inc.
          Pump Division
          2300 East Vernon Avenue
          Vernon, CA 90058
          (213) 587-6171

          For Technical Information Contact: Dr. Kent Huber 
          BW/IP Evaluation No.  CFR 93-008

IDENTIFICATION OF THE FACILITY, THE ACTIVITY, OR THE BASIC COMPONENT
SUPPLIED FOR SUCH FACILITY OR ACTIVITY WITHIN THE UNITED STATES WHICH
FAILS TO COMPLY OR CONTAINS A DEFECT:

          Basic Component:    6-inch 900# Motor Operated Y-Globe Valve

IDENTIFICATION OF THE FIRM SUPPLYING THE BASIC COMPONENT WHICH FAILS
TO
COMPLY OR CONTAINS A DEFECT:

          BW/IP International, Inc.
          Pump Division
          Successor to:

          BW/IP International, Inc
          Fluid Controls Division
          Successor to:

          Borg-Warner Nuclear Valve Division
          7500 Tyrone Avenue
          Van Nuys, CA 91409

                                                                 Page 1


                                            NOTIFICATION NO.  CFRN 94-03
                                                            SUPPLEMENT 1

NATURE OF THE DEFECT OR FAILURE TO COMPLY AND THE SAFETY HAZARD
WHICH IS
CREATED OR COULD BE CREATED BY SUCH DEFECT OR FAILURE TO COMPLY:

          Design calculations of stem thrust required to close the valve
          were based on the differential pressure acting on the seat area
          of the valve. Quantitative measurements of the referenced valve
          as part of the EPRI MOV Performance Prediction Program in
          response to NRC Generic Letter 89-10, showed that, when flow
          through the valve exceeds 5 fps, the stem thrust should be
          based on the differential pressure acting across the valve
          guide area. Required stem thrust using the valve guide area can
          be more than double the value calculated using the seating
          area.

          The calculated forces are used to size the valve actuator and
          motor and to set the actuator torque switch. If the stem thrust
          required to close the valve against a differential pressure is
          higher than the design value, the valve may fail to perform its
          intended safety function.


THE DATE ON WHICH THE INFORMATION OF SUCH DEFECT OR FAILURE TO
COMPLY WAS
OBTAINED:

          EPRI completed testing of the referenced valve on 18 October
          1993 and notified BW/IP of the findings on 18 October 1993.

          BW/IP initiated an evaluation to determine if a reportable
          deficiency existed. Prior to completing this evaluation, EPRI
          reported the dependence of the stem thrust on flow velocity.

IN THE CASE OF A BASIC COMPONENT WHICH CONTAINS A DEFECT OR FAILS TO
COMPLY, THE NUMBER AND LOCATION OF ALL SUCH COMPONENTS IN USE AT,
SUPPLIED FOR, OR BEING SUPPLIED FOR ONE OR MORE FACILITIES OR
ACTIVITIES
SUBJECT TO THE REGULATIONS:

          This Notification applies to all sizes and classes of motor
          operated Borg-Warner Y-Globe valves.
          See Attachment A for specific station locations.       *

                                                                 Page 2


                                             NOTIFICATION NO. CFRN 94-03
                                                            SUPPLEMENT 1

THE CORRECTIVE ACTION WHICH HAS, IS BEING, OR WILL BE TAKEN: THE NAME
OF
THE INDIVIDUAL OR ORGANIZATION RESPONSIBLE FOR THE ACTION: AND THE
LENGTH
OF TIME THAT HAS BEEN OR WILL BE TAKEN TO COMPLETE THE ACTION:

          If not already done, utilities should review the set-point
          calculations on all installed Borg-Warner Y-globe valves and
          take corrective actions as appropriate.

          BW/IP has revised the operator selection criteria for new
          products.


ANY ADVICE RELATED TO THE DEFECT OF FAILURE TO COMPLY ABOUT THE
FACILITY,
ACTIVITY, OR BASIC COMPONENT THAT HAS BEEN, IS BEING, OR WILL BE GIVEN
TO
PURCHASERS:

          BW/IP should be contacted for details and assistance.

                                                                 Page 3


                                                            ATTACHMENT A
                                             NOTIFICATION NO. CFRN 94-03
                                                            SUPPLEMENT 1

                          LOCATION OF EQUIPMENT

          1.  Florida Power & Light Co.; St. Lucie Station
          
          2.  Texas Utilities Generating Co.; Comanche Peak Station

          3.  Washington Public Power Supply System; WNP-3 SATSOP

          4.  Tennessee Valley Authority; Watts Bar, Browns Ferry         
              Stations

          5.  Entergy Operations; Arkansas Power & Light; ANO-1

          6.  Arizona Public Service Co.; Palo Verde Station

          7.  Cleveland Electric Illuminating Co.; Perry Nuclear Station

          8.  Duke Power Company; Catawba, McGuire Station