Part 21 Report - 1995-026
ACCESSION #: 9501230101 BW/IP International Inc. Byron P.O Box Los Angeles Telephone Jackson 2017 California 213 587 6171 Pumps Terminal 90051 Telex Annex 677233 United Fax Centrifugal 213 589 2080 Pumps Pump Division 10 January 1995 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C, 20555 Subject: 10CFR, Part 21, Notification No. CFRN 94-03 Gentlemen: An audit of activities relative to Title 10 of the Code of Federal Regulations, Part 21, for the 1994 calendar year has recently been completed. The audit was unable to definitively determine whether Attachment A, Location Of Equipment, had been sent with Notification No. CFRN 94-03 submitted on 25 October, 1994. BW/IP International, Inc., believes the Attachment was correctly included with the Notification. However, there was no specific reference to Attachment A contained in the text. All utilities with valves effected by this Notification were individually informed of the filing and sent a copy of the Notification on 29 October, 1994, in accordance with our 10CFR, Part 21, procedure. To assure that the official identification requirement has indeed been satisfied for this Notification, Supplement 1, attached, adds a reference to Attachment A to the text and transmits the location of the affected valves as required by 10CFR, Part 21. Very truly yours, D.A. Gibson Manager Nuclear Products Operations Attach. CC: Mr. F. Costanzo, Manager of Engineering Mr. D. Lattimore, Manager of Quality Mr. K. Huber, Technical Liaison Mr. W. Klenner, Product Manager Mr. G. Sausman, Field Service Operations NOTIFICATION NO. CFRN 94-03 SUPPLEMENT 1 NOTIFICATION OF A REPORTABLE DATE: 10 January 1995 ISSUE PURSUANT TO 10 CFR 21 TO: U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 NAME AND ADDRESS OF INDIVIDUAL INFORMING THE COMMISSION: Mr. David Gibson BW/IP International, Inc. Pump Division 2300 East Vernon Avenue Vernon, CA 90058 (213) 587-6171 For Technical Information Contact: Dr. Kent Huber BW/IP Evaluation No. CFR 93-008 IDENTIFICATION OF THE FACILITY, THE ACTIVITY, OR THE BASIC COMPONENT SUPPLIED FOR SUCH FACILITY OR ACTIVITY WITHIN THE UNITED STATES WHICH FAILS TO COMPLY OR CONTAINS A DEFECT: Basic Component: 6-inch 900# Motor Operated Y-Globe Valve IDENTIFICATION OF THE FIRM SUPPLYING THE BASIC COMPONENT WHICH FAILS TO COMPLY OR CONTAINS A DEFECT: BW/IP International, Inc. Pump Division Successor to: BW/IP International, Inc Fluid Controls Division Successor to: Borg-Warner Nuclear Valve Division 7500 Tyrone Avenue Van Nuys, CA 91409 Page 1 NOTIFICATION NO. CFRN 94-03 SUPPLEMENT 1 NATURE OF THE DEFECT OR FAILURE TO COMPLY AND THE SAFETY HAZARD WHICH IS CREATED OR COULD BE CREATED BY SUCH DEFECT OR FAILURE TO COMPLY: Design calculations of stem thrust required to close the valve were based on the differential pressure acting on the seat area of the valve. Quantitative measurements of the referenced valve as part of the EPRI MOV Performance Prediction Program in response to NRC Generic Letter 89-10, showed that, when flow through the valve exceeds 5 fps, the stem thrust should be based on the differential pressure acting across the valve guide area. Required stem thrust using the valve guide area can be more than double the value calculated using the seating area. The calculated forces are used to size the valve actuator and motor and to set the actuator torque switch. If the stem thrust required to close the valve against a differential pressure is higher than the design value, the valve may fail to perform its intended safety function. THE DATE ON WHICH THE INFORMATION OF SUCH DEFECT OR FAILURE TO COMPLY WAS OBTAINED: EPRI completed testing of the referenced valve on 18 October 1993 and notified BW/IP of the findings on 18 October 1993. BW/IP initiated an evaluation to determine if a reportable deficiency existed. Prior to completing this evaluation, EPRI reported the dependence of the stem thrust on flow velocity. IN THE CASE OF A BASIC COMPONENT WHICH CONTAINS A DEFECT OR FAILS TO COMPLY, THE NUMBER AND LOCATION OF ALL SUCH COMPONENTS IN USE AT, SUPPLIED FOR, OR BEING SUPPLIED FOR ONE OR MORE FACILITIES OR ACTIVITIES SUBJECT TO THE REGULATIONS: This Notification applies to all sizes and classes of motor operated Borg-Warner Y-Globe valves. See Attachment A for specific station locations. * Page 2 NOTIFICATION NO. CFRN 94-03 SUPPLEMENT 1 THE CORRECTIVE ACTION WHICH HAS, IS BEING, OR WILL BE TAKEN: THE NAME OF THE INDIVIDUAL OR ORGANIZATION RESPONSIBLE FOR THE ACTION: AND THE LENGTH OF TIME THAT HAS BEEN OR WILL BE TAKEN TO COMPLETE THE ACTION: If not already done, utilities should review the set-point calculations on all installed Borg-Warner Y-globe valves and take corrective actions as appropriate. BW/IP has revised the operator selection criteria for new products. ANY ADVICE RELATED TO THE DEFECT OF FAILURE TO COMPLY ABOUT THE FACILITY, ACTIVITY, OR BASIC COMPONENT THAT HAS BEEN, IS BEING, OR WILL BE GIVEN TO PURCHASERS: BW/IP should be contacted for details and assistance. Page 3 ATTACHMENT A NOTIFICATION NO. CFRN 94-03 SUPPLEMENT 1 LOCATION OF EQUIPMENT 1. Florida Power & Light Co.; St. Lucie Station 2. Texas Utilities Generating Co.; Comanche Peak Station 3. Washington Public Power Supply System; WNP-3 SATSOP 4. Tennessee Valley Authority; Watts Bar, Browns Ferry Stations 5. Entergy Operations; Arkansas Power & Light; ANO-1 6. Arizona Public Service Co.; Palo Verde Station 7. Cleveland Electric Illuminating Co.; Perry Nuclear Station 8. Duke Power Company; Catawba, McGuire Station Page 4 *** END OF DOCUMENT ***
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021