Part 21 Report - 1995-005
ACCESSION #: 9501040173 TELEPHONE (815) 727-2600 POST OFFICE BOX 3339 JOLIET, IL 60434 CRANE NUCLEAR OPERATIONS CRANE VALVES 104 NORTH CHICAGO STREET JOLIET, IL 60431 December 28, 1994 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 SUBJECT: INTERIM REPORT #4 of 10CFR Part 21 Evaluation REFERENCE: Crane Letter Dated May 16, 1994 Gentlemen: This letter is a follow-up to the referenced letter, in which Crane Valves Nuclear Operations advised that we were undertaking an investigation to determine if data supplied in the mid-1980's was used by Nuclear Utilities to set torque switches in Motor Operated Valves. As described in the May correspondence, over 600 issues of Engineering calculations have been generated and the scope of that evaluation is even greater than we initially anticipated. As of this date, we have uncovered no contractual evidence to support the fact that Crane supplied erroneous data to Utilities, since most orders do not specify the objective of our earlier evaluations. It is expected that the evaluation will be completed within the next 30 days. Any questions can be directed to my attention at 815-740-7571. Sincerely, Henry G.L. McCullough, P.E. Manager Engineering/ Quality Assurance HGMcC/cs cc: John Carlson Bruce Harry Kevin Hutchinson File *** END OF DOCUMENT ***
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021