The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Morning Report for March 26, 2004

Headquarters Daily Report

To top of page

REGION III

Davis-Besse Reactor Plant is Critical

Licensee/Facility:

FIRSTENERGY NUCLEAR OPERATING CO.
Davis-Besse
AKRON, Ohio
Dockets: 05000346
[1] B&W-L-LP
License No:
Notification:

MR Number: 3-2004-0024
Date: 03/26/2004

RIII-Via Teleconf. with Site

Discussion:

This information is current as of 9:00 a.m. (EST) on March 26, 2004. Davis-Besse completed its maintenance outage to repair feed water and steam line turbine bypass valves and recommenced start-up activities. The plant is currently in Mode 2 at normal operating temperature and pressure. The plant entered Mode 2 at 3:07 a.m. this morning, March 26, achieved criticality at 4:56 a.m., and is continuing with power ascension activities.

Ongoing resident inspector coverage, and enhanced inspection oversight will continue to be utilized to evaluate operational evolutions. Around-the-clock oversight, with NRC resident inspector and examiner support from Region III and other Regional Offices, was re-initiated on March 25 at 4:00 p.m., and will continue during operational evolutions until full power routine operations are achieved.


Regional Action: For Information Only

Accession Numbers:

Accession No Accession Date
ML040860241 03/26/2004

Contacts:

Name Office Abbrev Phone No E-Mail
LIPA, C A R3 (630) 829-9619 CAL@nrc.gov