Morning Report for November 25, 2002



                       Headquarters Daily Report



*******************************************************
                    REPORT             NEGATIVE
                    ATTACHED           INPUT RECEIVED

HEADQUARTERS          X
REGION I                                 X
REGION II                                X
REGION III                               X
REGION IV                                X



PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS NOV. 25, 2002


 Licensee:                                          Notification:

 PART 21 DATABASE                                   MR NO: H-02-0097
                                                    Date:    11/21/02
 Facility: C&D TECHNOLOGIES (CORRECTION)            Event Date: 11/21/02
     City:                                          Region: 0
    State:                                          Location Code: P21

 Notification Date & Method: 11/21/02
 Subject: Correction - Part 21 - Incorrect welds found in recently
          fabricated battery racks

 VENDOR: C&D Technologies            PT21 FILE NO: m2-29-0

 DATE OF DOCUMENT: 10/11/02          ACCESSION NUMBER: ml022900283

 Headquarters Action: [  ]

  C&D TECHNOLOGIES (CORRECTION)                          MR NO: H-02-0097
 VENDOR: C&D Technologies            PT21 FILE NO: m2-29-0

 DATE OF DOCUMENT: 10/11/02          ACCESSION NUMBER: ml022900283

 SOURCE DOCUMENT: LETTER             REVIEWER: RORP, J. Dozier

 On November 18, 2002, Morning Report H-02-0094 was issued concerning
 incorrect welds found in recently fabricated battery racks.  The MR
 incorrectly stated "fuel" racks and it should have read "battery" racks.
 Below is the correction:

 C&D Technologies, a vendor of battery racks, reported that a series of
 welds joining the horizontal cross beam to the vertical member of the
 frame were not welded correctly during fabrication of two single tier
 battery racks for the Prairie Island nuclear facility. The incorrect
 welds may affect the seismic qualification of the rack. These defects
 were identified before installation, thus the racks were not installed at
 Prairie Island. The vendor is undertaking corrective action to ensure
 that future racks will not have this defect.

 Contact:    J. Dozier, NRR
             301-415-1014
             E-mail: jxd@nrc.gov

   


 

Page Last Reviewed/Updated Wednesday, March 24, 2021