Headquarters Daily Report
Headquarters Daily Report
AUGUST 12, 2002
***************************************************************************
REPORT NEGATIVE NO INPUT
ATTACHED INPUT RECEIVED RECEIVED
HEADQUARTERS X
REGION I X
REGION II X
REGION III X
REGION IV X
PRIORITY ATTENTION REQUIRED MORNING REPORT - HEADQUARTERS AUGUST 12, 2002
MR Number: H-02-0059
NRR DAILY REPORT ITEM
GENERIC COMMUNICATIONS
Subject: Issuance of RIS 2002-11
NRC Regulatory Issue Summary 2002-11, Requalification Program Test
Results For Okonite Okolon Single-Conductor Bonded-Jacket Cable (Followup
to Regulatory Issue Summary 2000-25) dated August 9, 2002
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory
issue summary (RIS) as a followup to RIS 2000-25, "Potential Deficiency
in Qualification of Okonite Single-Conductor Electrical Control Cables,"
to notify addressees of the requalification of Okonite's 1/C #12 AWG EP
(Okonite) CSPE HYPALON (Okalon) bonded composite cable used for
instrumentation and control applications in nuclear power plants.
ADAMS Accession No.: ML022190099
Contact: Paul C. Shemanski, NRR
301-415-1377
E-mail: pcs@nrc.gov
_
HEADQUARTERS MORNING REPORT PAGE 2 AUGUST 12, 2002
MR Number: H-02-0060
NRR DAILY REPORT ITEM
GENERIC COMMUNICATIONS
Subject: Issuance of Bulletin 2002-02
NRC Bulletin 2002-02: Reactor Pressure Vessel Head and Vessel Head
Penetration Nozzle Inspection Programs dated August 9, 2002
The NRC is issuing this bulletin to:
(1) Advise pressurized-water reactor (PWR) addressees that visual
examinations, as a primary inspection method for the reactor pressure
vessel (RPV) head and vessel head penetration (VHP) nozzles, may need
to be supplemented with additional measures (e.g., volumetric and
surface examinations) to demonstrate compliance with applicable
regulations.
(2) Advise PWR addressees that inspection methods and frequencies to
demonstrate compliance with applicable regulations should be
demonstrated to be reliable and effective.
(3) Request information from all PWR addressees concerning their RPV
head and VHP nozzle inspection programs to ensure compliance with
applicable regulatory requirements.
(4) Require all PWR addressees to provide written responses to this
bulletin related to their inspection program plans.
ADAMS Accession No.: ML022200494
Technical Contacts: Allen L. Hiser, NRR Timothy K. Steingass, NRR
301-415-1034 301-415-3312
E-mail: alh1@nrc.gov E-mail: txs3@nrc.gov
Lead Project Managers: Michael L. Marshall, NRR Steven D. Bloom, NRR
301-415-2734 301-415-1313
E-mail: mxm2@nrc.gov E-mail: sdb1@nrc.gov
_
Page Last Reviewed/Updated Wednesday, March 24, 2021