Morning Report for December 16, 1999
Headquarters Daily Report DECEMBER 16, 1999 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS X REGION I X REGION II X REGION III X REGION IV X PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION III DEC. 16, 1999 Licensee/Facility: Notification: Consumers Power Co. MR Number: 3-99-0102 Palisades 1 Date: 12/14/99 Covert,Michigan RI Via Telecon Dockets: 50-255 PWR/CE Subject: PALISADES STARTUP FOLLOWING REFUELING OUTAGE Discussion: The Palisades Nuclear Plant was taken critical at 3:00 p.m. EST on December 10, 1999, and the main generator was synchronized to the grid at approximately 2:23 p.m. EST on December 14, 1999, following a scheduled refueling outage. The outage lasted approximately 59 days. Major maintenance items completed included: 1) replacing the seal package on Primary Coolant Pumps P-50A, P-50C, and P-50D; 2) replacing the motor on Primary Coolant Pump P-50D; 3) rebuilding Primary Coolant Pump P-50A; and 4) replacing both low pressure turbines on the main turbine generator. In addition to the scheduled activities, several equipment problems emerged during the outage necessitating repairs. These included crack indications in control rod drive seal housings and hardened grease in control rod drive mechanism clutch assembly bearings. Appropriate repairs were completed for all the emergent issues. Regional Action: Resident inspectors observed portions of the reactor and plant startup activities and will monitor portions of the plant power escalation to full power. Contact: Anton Vegel (630)829-9620 _
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021