Morning Report for December 1, 1999
Headquarters Daily Report
DECEMBER 01, 1999
***************************************************************************
REPORT NEGATIVE NO INPUT
ATTACHED INPUT RECEIVED RECEIVED
HEADQUARTERS X
REGION I X
REGION II X
REGION III X
REGION IV X
PRIORITY ATTENTION REQUIRED MORNING REPORT - HEADQUARTERS DEC. 01, 1999
MR Number: H-99-0103
NRR DAILY REPORT ITEM
GENERIC COMMUNICATIONS
Subject: Issuance of RIS 99-06
NRC Regulatory Issue Summary 99-06 - Voluntary Submission of Performance
Indicator Data Dated December 1, 1999
Intent
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory
issue summary to document the agreement between the Nuclear Energy
Institute and the NRC for power reactor licensees to voluntarily submit
to the NRC in January 2000, in electronic format, a historical report of
selected reactor facility performance attributes, i.e., performance
indicator (PI) data, for their respective reactor facilities.
Technical Contact: Donald E. Hickman, NRR
301-415-8541
E-mail: deh2@nrc.gov
_
REGION III MORNING REPORT PAGE 2 DECEMBER 1, 1999
Licensee/Facility: Notification:
Iowa Electric Light & Power Co. MR Number: 3-99-0096
Duane Arnold 1 Date: 12/01/99
Palo,Iowa SRI via LAN
Dockets: 50-331
BWR/GE-4
Subject: DUANE ARNOLD NUCLEAR POWER STATION RESTART FROM PLANNED
REFUELING OUTAGE
Discussion:
On December 1, 1999, at 4:54 a.m. (CST), Duane Arnold operations
personnel synchronized the main turbine generator to the grid, completing
Refueling Outage 16 (RFO-16). Major activities, in addition to refueling
the reactor, completed during this 40-day outage included: 1) noble
metals chemical addition, 2) weld overlays on the N2B and N2D reactor
recirculation riser inlet nozzle to safe-end welds; 3) overhaul of
cooling tower structural supports, and 4) replacement of all main turbine
elector- hydraulic control systems servos.
Regional Action:
Resident inspectors observed portions of plant outage and restart
activities and will continue to monitor power ascension.
Contact: Melvyn Leach (630)829-9705
_
REGION III MORNING REPORT PAGE 3 DECEMBER 1, 1999
Licensee/Facility: Notification:
Commonwealth Edison Co. MR Number: 3-99-0097
Quad Cities 2 Date: 11/30/99
Cordova,Illinois E-Mail
Dockets: 50-265
BWR/GE-3
Subject: Management Change at Quad Cities Nuclear Station
Discussion:
On November 30, 1999, the licensee announced the following management
changes. Mike Perito will replace Russ Freeman as the Maintenance Manager
effective December 6, 1999. Site Engineering Manager Dave Wozniak be
replaced by Deputy Site Engineering Manager, Greg Boerschig on December
8, 1999.
Mike Perito comes to Quad Cities Station directly from Carolina Power and
Light, Cape Fear Fossil station in North Carolina. Previously, Mr. Perito
worked at Boston Edison's Pilgrim station as a manager in engineering and
in operations.
Greg Boerschig was previously the Site Deputy Engineering Manager for
about 18 months before being assigned to the Site Engineering Managers
position.
Regional Action:
For information.
Contact: M. Ring (630)829-9703
_
Page Last Reviewed/Updated Wednesday, March 24, 2021