Morning Report for December 1, 1999
Headquarters Daily Report DECEMBER 01, 1999 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS X REGION I X REGION II X REGION III X REGION IV X PRIORITY ATTENTION REQUIRED MORNING REPORT - HEADQUARTERS DEC. 01, 1999 MR Number: H-99-0103 NRR DAILY REPORT ITEM GENERIC COMMUNICATIONS Subject: Issuance of RIS 99-06 NRC Regulatory Issue Summary 99-06 - Voluntary Submission of Performance Indicator Data Dated December 1, 1999 Intent The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary to document the agreement between the Nuclear Energy Institute and the NRC for power reactor licensees to voluntarily submit to the NRC in January 2000, in electronic format, a historical report of selected reactor facility performance attributes, i.e., performance indicator (PI) data, for their respective reactor facilities. Technical Contact: Donald E. Hickman, NRR 301-415-8541 E-mail: deh2@nrc.gov _ REGION III MORNING REPORT PAGE 2 DECEMBER 1, 1999 Licensee/Facility: Notification: Iowa Electric Light & Power Co. MR Number: 3-99-0096 Duane Arnold 1 Date: 12/01/99 Palo,Iowa SRI via LAN Dockets: 50-331 BWR/GE-4 Subject: DUANE ARNOLD NUCLEAR POWER STATION RESTART FROM PLANNED REFUELING OUTAGE Discussion: On December 1, 1999, at 4:54 a.m. (CST), Duane Arnold operations personnel synchronized the main turbine generator to the grid, completing Refueling Outage 16 (RFO-16). Major activities, in addition to refueling the reactor, completed during this 40-day outage included: 1) noble metals chemical addition, 2) weld overlays on the N2B and N2D reactor recirculation riser inlet nozzle to safe-end welds; 3) overhaul of cooling tower structural supports, and 4) replacement of all main turbine elector- hydraulic control systems servos. Regional Action: Resident inspectors observed portions of plant outage and restart activities and will continue to monitor power ascension. Contact: Melvyn Leach (630)829-9705 _ REGION III MORNING REPORT PAGE 3 DECEMBER 1, 1999 Licensee/Facility: Notification: Commonwealth Edison Co. MR Number: 3-99-0097 Quad Cities 2 Date: 11/30/99 Cordova,Illinois E-Mail Dockets: 50-265 BWR/GE-3 Subject: Management Change at Quad Cities Nuclear Station Discussion: On November 30, 1999, the licensee announced the following management changes. Mike Perito will replace Russ Freeman as the Maintenance Manager effective December 6, 1999. Site Engineering Manager Dave Wozniak be replaced by Deputy Site Engineering Manager, Greg Boerschig on December 8, 1999. Mike Perito comes to Quad Cities Station directly from Carolina Power and Light, Cape Fear Fossil station in North Carolina. Previously, Mr. Perito worked at Boston Edison's Pilgrim station as a manager in engineering and in operations. Greg Boerschig was previously the Site Deputy Engineering Manager for about 18 months before being assigned to the Site Engineering Managers position. Regional Action: For information. Contact: M. Ring (630)829-9703 _
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021