Morning Report for May 21, 1999

                       Headquarters Daily Report

                         MAY 21, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X
REGION I                               X
REGION II                                                 X
REGION III          X
REGION IV                              X
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS MAY 21, 1999

Licensee/Facility:                     Notification:

                                       MR Number: H-99-0045
Proposed Generic Communication         Date: 05/21/99


Subject: Proposed Information Notice

Discussion:

The U.S. Nuclear Regulatory Commission intends to issue an information
notice discussing the May 14, 1999, manual reactor trip at Point Beach
Unit 1. The manual trip was in response to the occurrence of a steam leak
on the number 4B feedwater heater. The steam leak resulted when the
number feedwater heater shell ruptured.

Contact:    E. Nick Fields, NRR
            (301) 415-1173
            Email: enf@nrc.gov
_
REGION III  MORNING REPORT     PAGE  2          MAY 21, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0046
Braidwood 2                            Date: 05/21/99
Braceville,Illinois                    SRI via e-mail
Dockets: 50-457
PWR/W-4-LP

Subject: UNIT 2 STARTUP FROM REFUELING OUTAGE

Discussion:

Unit 2 was returned to service from refueling outage A2R07. The unit was
made critical at 3:30 p.m. and synchronized to the electrical grid at
6:21 p.m. on May 20, 1999. Major work accomplished during the outage
included a modification to the 2B Emergency Diesel Generator electronic
governor, a modification to the auxiliary feedwater flow control valve
trim, and repairs to a pressurizer spray valve.

Regional Action:

None.

Contact:  Michael Jordan             (630)829-9637
_
REGION III  MORNING REPORT     PAGE  3          MAY 21, 1999

Licensee/Facility:                     Notification:

Detroit Edison Co.                     MR Number: 3-99-0047
Fermi 2                                Date: 05/21/99
Newport,Michigan                       SRI via telecon
Dockets: 50-341
BWR/GE-4

Subject: FERMI STARTUP FOLLOWING FORCED OUTAGE

Discussion:

The Fermi 2 nuclear plant was taken critical at 1:27 p.m. on May 20,
1999, and the main generator was synchronized to the grid at 6:40 a.m. on
May 21, 1999, following a forced outage. The forced outage began on May
18, 1999, when the operators manually scrammed the reactor in response to
the trip of the "A" reactor recirculating pump which placed the reactor
in a prohibited region of the Technical Specification power to flow map.

Regional Action:

The resident inspectors monitored the startup activities.

Contact:  Anton Vegel                (630)829-9620
_
 