Morning Report for May 10, 1999
Headquarters Daily Report MAY 10, 1999 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS X REGION I X REGION II X REGION III X REGION IV X PRIORITY ATTENTION REQUIRED MORNING REPORT - HEADQUARTERS MAY 10, 1999 MR Number: H-99-0043 NRR DAILY REPORT ITEM GENERIC COMMUNICATIONS Subject: INFORMATION NOTICE 99-14 HAS BEEN ISSUED 5/5/99 NRC INFORMATION NOTICE 99-14: UNANTICIPATED REACTOR WATER DRAINDOWN AT QUAD CITIES UNIT 2, ARKANSAS NUCLEAR ONE UNIT 2, AND FITZPATRICK, dated May 5, 1999 The NRC has issued this information notice to alert addressees to the potential for personnel errors during infrequently performed evolutions that result in, or contribute to, events such as the inadvertent draining of water from the reactor vessel during shutdown operations. Technical contact: Chuck Petrone, NRR 301-415-1027 E-mail: cdp@nrc.gov _ REGION III MORNING REPORT PAGE 2 MAY 10, 1999 Licensee/Facility: Notification: Consumers Power Co. MR Number: 3-99-0040 Palisades 1 Date: 05/10/99 Covert,Michigan SRI Via Telecon Dockets: 50-255 PWR/CE Subject: PALISADES SHUT DOWN FOR PLANNED MAINTENANCE OUTAGE Discussion: On May 7, 1999, the Palisades Nuclear Plant shut down for a planned maintenance outage. The outage is scheduled to last 8 days and the plant is expected to startup on May 15, 1999. The scheduled major activities include: 1) replace the seal package on Primary Coolant Pump P-50A; 2) repair lube oil leaks on Primary Coolant Pumps P-50B and P-50D; 3) repair Main Condenser tube leaks; and 4) repair position indicators on the Pressurizer Power Operated Relief Valves. Regional Action: The resident inspector observed selected portions of the shut down and will follow the safety and risk significant activities during the outage. Contact: Anton Vegel (630)829-9620 _
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021