Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Morning Report for April 23, 1999

                       Headquarters Daily Report

                         APRIL 23, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X
REGION I            X
REGION II                              X
REGION III          X
REGION IV                              X
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION I  APRIL 23, 1999

Licensee/Facility:                     Notification:

Peco Energy Company.                   MR Number: 1-99-0016
Limerick 2                             Date: 04/23/99
Philadelphia,Pennsylvania              SRI/PC
Dockets: 50-353
BWR/GE-4

Subject: SERIOUS PERSONNEL INJURY DURING REFUELING OUTAGE
Reportable Event Number: 35616

Discussion:

While lowering an approximately 2000 pound flow diffuser from the high
pressure turbine shell during the main turbine retrofit work, a worker
lost a substantial portion of one finger when the cribbing and jack used
to support the diffuser failed and pinned the worker's hand between the
diffuser and an I-beam used as part of the cribbing assembly.

Because of the extent of the injury, the worker was evacuated for offsite
medical attention prior to site personnel completing a contamination
survey.  At the hospital, the individual was determined not to be
contaminated.

The licensee stopped work on the turbine retrofit work and conducted a
safety standdown for all personnel.

Regional Action:

The resident staff continues to follow the licensee's actions in response
to this event.  NRC staff informed the OSHA area office in accordance
with the NRC/OSHA memorandum of understanding.

Contact:  Curtis Cowgill             (610)337-5233
          Arthur Burritt             (609)327-1344
_
REGION III  MORNING REPORT     PAGE  2          APRIL 23, 1999

Licensee/Facility:                     Notification:

Wisconsin Electric Power Co.           MR Number: 3-99-0033
Point Beach 1                          Date: 04/23/99
Two Rivers,Wisconsin                   E-Mail from Resident Inspect. Staff
Dockets: 50-266
PWR/W-2-LP

Subject: Point Beach Nuclear Plant Unit 1 Shut Down For Maintenance
         Outage


Discussion:

On April 23, 1999, the licensee began a mid-cycle maintenance outage for
Unit 1. Major work scheduled for the planned four-day outage included:
repair of a control rod drive mechanism cooling fan, main generator
motor-operated disconnect repair, secondary system valve repairs, and
condenser waterbox cleaning. The outage is being conducted to bolster
reliability during the peak-demand summer months.

Regional Action:

The resident inspectors observed the reactor shutdown and will review
selected maintenance activities during the outage.

Contact:  R. Lanksbury               (630)829-9631
_
 