Morning Report for April 21, 1999
Headquarters Daily Report APRIL 21, 1999 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS X REGION I X REGION II X REGION III X REGION IV X PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION I APRIL 21, 1999 Licensee/Facility: Notification: Northeast Utilities MR Number: 1-99-0015 Millstone 2 Date: 04/21/99 Waterford,Connecticut Resident Inspector Dockets: 50-336 PWR/CE Subject: COMPLETION OF SHUTDOWN COOLING SUCTION ISOLATION VALVE REPAIR Discussion: On April 20, 1999, the licensee completed installation of a welded seal ring on valve 2-SI-652, the shutdown cooling system suction isolation valve, to stop leakage through the pressure seal gasket. The valve is not isolable from the reactor coolant system (RC) because it is located in the 12-inch diameter shutdown cooling suction line just downstream from its intersection with the RCS hot leg piping. While the plant was in operational Mode 5, Cold Shutdown, with shutdown cooling in service, the licensee repaired the valve in a controlled manner that maintained the integrity of the valve's pressure boundary and maintained shutdown cooling flow through the valve. The resident inspectors have been closely following the licensee's repair activities. In addition to the resident inspectors, NRC Personnel in Region I and at Headquarters reviewed the licensee's repair plans and associated safety evaluation prior to initiation of the repair work. The licensee currently plans to have Unit 2 ready for Mode 2 startup by April 27 at the earliest. Contact: Steve R. Jones (860)444-5394 James Linville (610)337-5129 _
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021