Morning Report for February 5, 1999
Headquarters Daily Report FEBRUARY 05, 1999 *************************************************************************** REPORT NEGATIVE NO INPUT ATTACHED INPUT RECEIVED RECEIVED HEADQUARTERS X REGION I X REGION II X REGION III X REGION IV X PRIORITY ATTENTION REQUIRED MORNING REPORT - HEADQUARTERS FEB. 05, 1999 Licensee/Facility: Notification: Part 21 Database MR Number: H-99-0011 Abb-Ce Date: 02/05/99 Subject: Part 21 - Modeling defect in BISON fast transient analysis code Discussion: VENDOR: ABB-CE PT21 FILE NO: 99-07-0 DATE OF DOCUMENT: 01/15/99 ACCESSION NUMBER: SOURCE DOCUMENT: EN 35271 REVIEWER: PECB, E. Benner NEW ISSUE. The fuel vendor ABB-CE reports incorrect modeling of the reactor vessel lower plenum volume in the BISON fast transient analysis code. The vendor has determined that this defect applies only to reload fuel assemblies currently in operation at the WNP-2 boiling water reactor nuclear power plant and that there is no safety problem for operation of the previous Cycles 12 and 13 and the current Cycle 14. However, for certain operating states in Cycle 14 with fuel exposures less than 5,000 Mwd/MTU and for all operating states with exposure greater than 5,000 Mwd/MTU the minimum critical power ratio operating limits must be increased to accommodate the defect. The WNP-2 licensee projects that exposure will be reached in early 1999. The vendor provided revised operating limits to the licensee, modified the code model, and notified all its customers of this condition. _ HEADQUARTERS MORNING REPORT PAGE 2 FEBRUARY 5, 1999 Licensee/Facility: Notification: Part 21 Database MR Number: H-99-0012 Abb-Ce Date: 02/05/99 Subject: Part 21 - Potential nonconservative critical power ratio in SVEA-96 BWR fuel Discussion: VENDOR: ABB-CE PT21 FILE NO: 99-08-0 DATE OF DOCUMENT: 01/15/99 ACCESSION NUMBER: SOURCE DOCUMENT: EN 35273 REVIEWER: PECB, E. Benner NEW ISSUE. The fuel vendor ABB-CE reports a defect concerning the XL-S96 critical power ratio correlation, which is based solely on a cosine axial power shape, for ABB SVEA-96 fuel assemblies for boiling water reactors. The vendor has determined that the defect only applies to Cycle 14 reload fuel assemblies currently in operation at the WNP-2 nuclear power plant for fuel exposures equal to or greater than 5,600 Mwd/MTU. The WNP-2 licensee projects that exposure will be reached in February 1999. The vendor recommended corrective actions to the licensee to ensure that sufficient margin for monitoring the core critical power ratio is maintained. _ HEADQUARTERS MORNING REPORT PAGE 3 FEBRUARY 5, 1999 Licensee/Facility: Notification: Part 21 Database MR Number: H-99-0013 Abb-Ce Date: 02/05/99 Subject: Part 21 - Potential manufacturing deviation in fuel assembly guide tube wear sleeves Discussion: VENDOR: ABB-CE PT21 FILE NO: 99-06-0 DATE OF DOCUMENT: 12/01/98 ACCESSION NUMBER: 9901060170 SOURCE DOCUMENT: LETTER REVIEWER: PECB, E. Goodwin NEW ISSUE. The fuel vendor ABB-CE reports a potential manufacturing deviation in fuel assembly control element assembly guide tube wear sleeves. Local regions on some sleeves in delivered ABB-CE pressurized water reactor fuel have less than minimum specified chrome plating thickness on the inside diameter. The vendor has determined this condition to not create a substantial safety hazard and therefore not to be reportable under 10 CFR Part 21. However, since the guide tube wear sleeve is an NRC-approved design, the vendor submitted this report for information. The vendor notified all its affected customers. _
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021