Skip to main content

Event Notification Report for February 13, 2025

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
02/12/2025 - 02/13/2025

EVENT NUMBERS
5755857545
Agreement State
Event Number: 57558
Rep Org: Illinois Emergency Mgmt. Agency
Licensee: OSF St. Anthony Medical Center
Region: 3
City: Rockford   State: IL
County:
License #: IL-01962-01
Agreement: Y
Docket:
NRC Notified By: Gary Forsee
HQ OPS Officer: Josue Ramirez
Notification Date: 02/18/2025
Notification Time: 16:32 [ET]
Event Date: 02/13/2025
Event Time: 00:00 [CST]
Last Update Date: 02/18/2025
Emergency Class: Non Emergency
10 CFR Section:
Agreement State
Person (Organization):
Feliz-Adorno, Nestor (R3DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
Event Text
AGREEMENT STATE REPORT - EQUIPMENT FAILURE

The following information was provided by the Illinois Emergency Management Agency (the Agency) via phone and email:

"The Agency was notified on 2/18/25, by the radiation safety officer for OSF St. Anthony in Rockford, IL of an apparent equipment failure with their high dose rate therapy unit that occurred on 2/13/25. Reportedly, the device was unable to extend the 5.33 Ci Ir-192 source, resulting in the administration being aborted. No dose was delivered to the patient. Inspectors are performing a reactive inspection tomorrow, 2/19/25."

Source: Sealed Source Brachytherapy
Serial Number: 24-01-2930-001-112224-11727-14

Illinois Item Number: IL250008


Non-Power Reactor
Event Number: 57545
Rep Org: Penn State University (PENN)
Licensee: Penn State University
Region: 0
City: University Park   State: PA
County: Centre
License #: R-2
Agreement: Y
Docket: 05000005
NRC Notified By: Jeffery Geuther
HQ OPS Officer: Natalie Starfish
Notification Date: 02/14/2025
Notification Time: 10:02 [ET]
Event Date: 02/13/2025
Event Time: 10:09 [EST]
Last Update Date: 02/18/2025
Emergency Class: Non Emergency
10 CFR Section:
Person (Organization):
Brian Lin (NRR)
Jessica Lovett (NRR)
Event Text
TECHNICAL SPECIFICATION DEVIATION

The following is a summary of information obtained from the licensee by phone:

On February 13, 2025, at 1009 EST, the licensee violated Technical Specification 3.2.3 when conducting a $2.00 reactor pulse while one of the required reactor power measurement channels was in bypass, therefore, the pulse power was not recorded. The pulse was completed per procedure, and the reactor was shutdown and secured. The incident was reported to supervision, and the pulse data was reviewed. The peak observed temperature during the pulse aligned with the expected peak temperature for the conducted pulse, but the peak power was not captured by the system. After review of the data, continued operation was authorized. There is no assessed safety impact due to this event.

Training will be conducted to clarify the Technical Specification requirements to prevent this issue in the future.

NRC Project Managers have been notified.