Skip to main content

Event Notification Report for August 03, 2023

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
08/02/2023 - 08/03/2023

EVENT NUMBERS
5665256653
Power Reactor
Event Number: 56652
Facility: Nine Mile Point
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: Ryan Bracht
HQ OPS Officer: Bill Gott
Notification Date: 08/03/2023
Notification Time: 16:58 [ET]
Event Date: 08/03/2023
Event Time: 10:03 [EDT]
Last Update Date: 08/03/2023
Emergency Class: Non Emergency
10 CFR Section:
26.719 - Fitness For Duty
Person (Organization):
Bickett, Brice (R1DO)
FFD Group, (EMAIL)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
FAILED FITNESS FOR DUTY TEST

The following information was provided by the licensee via email:

A licensed employee had a confirmed positive for alcohol during a random fitness-for-duty test. The employee's access to the plant has been terminated.

The NRC Senior Resident Inspector was notified.



Part 21
Event Number: 56653
Rep Org: Paragon Energy Solutions
Licensee:
Region: 2
City:   State:
County:
License #:
Agreement: N
Docket:
NRC Notified By: Richard Knott
HQ OPS Officer: Bill Gott
Notification Date: 08/03/2023
Notification Time: 17:05 [ET]
Event Date: 08/03/2023
Event Time: 00:00 []
Last Update Date: 08/25/2023
Emergency Class: Non Emergency
10 CFR Section:
21.21(a)(2) - Interim Eval Of Deviation 21.21(d)(3)(i) - Defects And Noncompliance
Person (Organization):
Miller, Mark (R2DO)
Nguyen, April (R3DO)
Part 21/50.55 Reactors, - (EMAIL)
Event Text
EN Revision Imported Date: 8/28/2023

EN Revision Text: INITIAL PART 21 REPORT - DEFECT WITH EATON/CUTLER HAMMER SIZE 4 AND 5 FREEDOM SERIES CONTACTORS

The following information was provided by Paragon Energy Solutions, LLC via email:

"Pursuant to 10 CFR 21.21(d)(3)(i), Paragon Energy Solutions, LLC is providing this initial notification of a potential defect with Eaton/Cutler Hammer size 4 and 5 freedom series contactors that have been modified to include either a special coil and/or to improve the securing of shading coils. These contactors may have been supplied integral to a motor control center (MCC) cubicle or as spare parts. This condition, if left uncorrected, could potentially cause a substantial safety hazard.

"Paragon completed an initial evaluation of a failure of a size 4 freedom series contactor (PN: NLI-CN15NN3A-T16-MOD-M) supplied to Perry Nuclear Power Plant. The reported failure occurred 26 days following installation into its associated MCC Cubicle. Perry identified the screws holding the contact bar to the push bars had fallen out and were laying in the bottom of the molded base. This allowed the movable contact bar to sit on the stationary contacts and significantly degrade due to arcing and then fail in the energized position. This condition could prevent the contactor from performing its safety function to either energize or de-energize the attached load.

"The loose hardware is most likely a workmanship error since the contactor must be disassembled to complete the special coil and RTV modifications to the shading coils. In the fully re-assembled condition, inspection of this hardware for tightness is not possible."

Affected plants: North Anna, Turkey Point, Harris, and Perry.

* * * UPDATE ON 08/25/23 AT 1448 EDT FROM RICHARD KNOTT TO ERNEST WEST * * *

Paragon Energy Solutions submitted their final report in accordance with 10 CFR 21.21(d)(4).

Paragon reported completion of corrective actions including revising the test inspection procedure to ensure hardware tightness during contactor reassembly, identifying all projects containing the affected contactors and verifying appropriate inspections have been completed, restricted use of test inspection procedures issued prior to 8/2/2023 until a formal review is completed, and issued a technical bulletin (TB-Starter-2023-01 Rev 0) for use by affected clients.

Paragon recommends affected licensees perform the steps contained in Technical Bulletin TB-Starter-2023-01 Rev 0 to verify this condition is not present as part of their next routine maintenance outage associated with the affected in use equipment, and at the earliest opportunity for stock spares.

Affected plants: North Anna, Turkey Point, Harris, and Perry.

Notified R2DO ( Miller), R3DO (Skokowski), and Part 21/50.55 Group via email.