The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Event Notification Report for February 15, 2023

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
02/14/2023 - 02/15/2023

Power Reactor
Event Number: 56080
Facility: Fermi
Region: 3     State: MI
Unit: [2] [] []
RX Type: [2] GE-4
NRC Notified By: Levi Smith
HQ OPS Officer: Mike Stafford
Notification Date: 08/31/2022
Notification Time: 11:56 [ET]
Event Date: 08/31/2022
Event Time: 00:30 [EDT]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
26.719 - Fitness For Duty
Person (Organization):
Hills, David (R3DO)
FFD Group, (EMAIL)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
Event Text
EN Revision Imported Date: 2/15/2023

EN Revision Text: FITNESS FOR DUTY REPORT

A contract supervisor refused to provide a specimen during a fitness-for-duty test. The employee's access to the plant has been terminated.

The licensee notified the NRC Resident Inspector.


Agreement State
Event Number: 56341
Rep Org: Illinois Emergency Mgmt. Agency
Licensee: Bard Brachytherapy
Region: 3
City: Carol Stream   State: IL
County:
License #: IL-02062-01
Agreement: Y
Docket:
NRC Notified By: Gary Forsee
HQ OPS Officer: Adam Koziol
Notification Date: 02/07/2023
Notification Time: 11:45 [ET]
Event Date: 02/06/2023
Event Time: 00:00 [CST]
Last Update Date: 02/09/2023
Emergency Class: Non Emergency
10 CFR Section:
Agreement State
Person (Organization):
Szwarc, Dariusz (R3DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
ILTAB, (EMAIL)
Event Text
AGREEMENT STATE REPORT - LOST BRACHYTHERAPY SEEDS

The following information was provided by the Illinois Emergency Management Agency, Division of Nuclear Safety, Radioactive Material Branch (DNS-RAM) via email:

"DNS-RAM was notified on 2/6/23, by Bard Brachytherapy (IL-02062-01) that a package of radioactive brachytherapy seeds was lost while in the care of a common carrier. The package was shipped on 2/3/2023, from the licensee's facility in Carol Stream, IL to Centrum Radiotherapie in Kortrijk, Belgium. Total package activity at the time of shipment was 65.62 millicuries of I-125 (ninety STM-1251 seeds, each at 0.430 millicuries). DNS-RAM is currently seeking updated information on the last reported location of the package - which is believed to have been in South Africa. This does not represent a significant public safety hazard and there is no indication of intentional theft or diversion.

"Updates will be provided as they become available."

Illinois Event Number: IL230003

* * * UPDATE ON 2/9/23 AT 1201 EST FROM GARY FORSEE TO ADAM KOZIOL * * *

The following information was provided by the Illinois Emergency Management Agency, Division of Nuclear Safety, Radioactive Material Branch (DNS-RAM) via email:

"Licensee advised this morning that the package has been located. Updates will be provided as they become available."

Notified R3DO (Szwarc), NMSS Events Notification, and ILTAB (email).

THIS MATERIAL EVENT CONTAINS A 'Less than Cat 3' LEVEL OF RADIOACTIVE MATERIAL

Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks. For additional information go to http://www-pub.iaea.org/MTCD/publications/PDF/Pub1227_web.pdf* * * UPDATE ON {DATE} AT {TIME} FROM {LICENSEE} TO {HOO} * * *


Agreement State
Event Number: 56343
Rep Org: NJ Dept of Environmental Protection
Licensee: GE Healthcare South Plainfield, NJ
Region: 1
City: South Plainfield   State: NJ
County: USA
License #: 456011
Agreement: Y
Docket:
NRC Notified By: Sarah Sanderlin
HQ OPS Officer: Adam Koziol
Notification Date: 02/08/2023
Notification Time: 15:08 [ET]
Event Date: 02/07/2023
Event Time: 00:00 [EST]
Last Update Date: 02/08/2023
Emergency Class: Non Emergency
10 CFR Section:
Agreement State
Person (Organization):
Cahill, Christopher (R1DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
ILTAB, (EMAIL)
Event Text
AGREEMENT STATE REPORT - SOURCE LOST IN TRANSIT

The following information was provided by the New Jersey Radiation Materials Program (RMP) via email:

"On 2/7/2023, RMP staff was notified via the radiation safety officer that a Cardiogen generator with 100 mCi of Sr-82 and 71 mCi of Sr-85 was considered lost in transit by the common carrier. On 1/31/2023, the licensee sent the generator to a customer via a common carrier. Due to delays, the licensee's logistics team contacted the common carrier for a status update on the generator. On 2/7/2023, it was declared lost and its last location was at the common carrier hub in Memphis, TN."

New Jersey Incident Number: TBD

THIS MATERIAL EVENT CONTAINS A 'Less than Cat 3' LEVEL OF RADIOACTIVE MATERIAL

Sources that are "Less than IAEA Category 3 sources," are either sources that are very unlikely to cause permanent injury to individuals or contain a very small amount of radioactive material that would not cause any permanent injury. Some of these sources, such as moisture density gauges or thickness gauges that are Category 4, the amount of unshielded radioactive material, if not safely managed or securely protected, could possibly - although it is unlikely - temporarily injure someone who handled it or were otherwise in contact with it, or who were close to it for a period of many weeks. For additional information go to http://www-pub.iaea.org/MTCD/publications/PDF/Pub1227_web.pdf


Agreement State
Event Number: 56344
Rep Org: Virginia Rad Materials Program
Licensee: Geo Design & Engineering, Inc.
Region: 1
City: Chantilly   State: VA
County:
License #: 107-329-2
Agreement: Y
Docket:
NRC Notified By: Sheila Nelson
HQ OPS Officer: Adam Koziol
Notification Date: 02/08/2023
Notification Time: 19:13 [ET]
Event Date: 02/08/2023
Event Time: 11:15 [EST]
Last Update Date: 02/08/2023
Emergency Class: Non Emergency
10 CFR Section:
Agreement State
Person (Organization):
Cahill, Christopher (R1DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)
Event Text
AGREEMENT STATE REPORT - DAMAGED PORTABLE GAUGE

The following information was provided by the Virginia Radioactive Materials Program (VRMP) via email:

"On February 8, 2023, at approximately 1300 EST, the VRMP received a report via telephone from the licensee that a portable nuclear moisture/density gauge (Troxler Model 3440+, serial number 72924, containing 8 millicuries of cesium-137 and 40 millicuries of americium-241/beryllium) was damaged. At approximately 1115 EST on February 8, 2023, [the gauge] was hit by a 'Bobcat' compaction vehicle/machine on a temporary jobsite at a private residence. The source rod was not out at the time of the impact. The gauge is not functional as the housing and electronics sustained significant damage. The source appeared to remain intact within the safe position. The authorized user secured the area and immediately contacted his radiation safety officer (RSO) who was several hours away. The RSO then contacted the VRMP. The licensee was instructed to transport the gauge back to their storage facility in its transport container to expedite removal from the residential site before nightfall. At 1615 EST, the RSO confirmed the gauge had arrived at their office in Chantilly VA and was secured. The Virginia Office of Radiological Health will perform surveys of the gauge on February 9, 2023, and will conduct a reactive inspection to investigate the incident. This notification will be updated with additional information determined during the inspection.

"No members of the public have had close proximity to the gauge. Any potential exposure by the authorized user will be determined once surveys have been made."

Virginia Incident Number: VA230001


Power Reactor
Event Number: 56351
Facility: Arkansas Nuclear
Region: 4     State: AR
Unit: [1] [] []
RX Type: [1] B&W-L-LP,[2] CE
NRC Notified By: Bryan Horn
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 02/14/2023
Notification Time: 14:40 [ET]
Event Date: 02/14/2023
Event Time: 11:03 [CST]
Last Update Date: 02/15/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS Actuation - Critical
Person (Organization):
Dixon, John (R4DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 86 Power Operation 0 Hot Standby
Event Text
EN Revision Imported Date: 2/15/2023

EN Revision Text: AUTOMATIC REACTOR TRIP DUE TO TWO REACTOR COOLANT PUMPS TRIPPING

The following information was provided by the licensee via email:

"On February 14, 2023 at 1103 CST, Arkansas Nuclear One, Unit 1, (ANO-1) automatically tripped on reactor protection system actuation due to two reactor coolant pumps tripping.

"ANO-1 is currently stable in MODE 3 (Hot Standby) maintaining reactor coolant system pressure and temperature with main feedwater and steaming to the condenser.

"No additional safety system actuations occurred. All immediate actions were completed satisfactorily.
"There are no indications of a radiological release on either unit as a result of this event.

"This report satisfies the reporting criteria of 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A) for the reactor protection system actuation.

"The NRC Senior Resident Inspector has been notified.

"Unit 2 was not affected."

The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:

The licensee is investigating the cause of the two reactor coolant pump trips.


Power Reactor
Event Number: 56352
Facility: Braidwood
Region: 3     State: IL
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Dennis Moore
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 02/16/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 05:30 [CST]
Last Update Date: 02/06/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dickson, Billy (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES
The following information was provided by the licensee via email:
"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.
"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56354
Facility: Byron
Region: 3     State: IL
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Dennis Moore
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 05:30 [CST]
Last Update Date: 02/06/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dickson, Billy (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:
"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.
"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56355
Facility: Calvert Cliffs
Region: 1     State: MD
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: Dennis Moore
HQ OPS Officer: Ernest West
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 06:30 [EST]
Last Update Date: 02/06/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dentel, Glenn (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 98 Power Operation 98 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:
"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.
"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56356
Facility: Clinton
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: Dennis Moore
HQ OPS Officer: Ernest West
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 05:30 [CST]
Last Update Date: 02/06/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dickson, Billy (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 50 Power Operation 50 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:
"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.
"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56357
Facility: Quad Cities
Region: 3     State: IL
Unit: [1] [2] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: Dennis Moore
HQ OPS Officer: Ernest West
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 05:30 [CST]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dickson, Billy (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 93 Power Operation 93 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:

"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.

"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56358
Facility: Peach Bottom
Region: 1     State: PA
Unit: [2] [3] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: Dennis Moore
HQ OPS Officer: Ernest West
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 06:30 [EST]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dentel, Glenn (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:

"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.

"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56359
Facility: Nine Mile Point
Region: 1     State: NY
Unit: [1] [2] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: Dennis Moore
HQ OPS Officer: Ernest West
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 06:30 [EST]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dentel, Glenn (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 89 Power Operation 89 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:

"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.

"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56360
Facility: Limerick
Region: 1     State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: Dennis Moore
HQ OPS Officer: Ernest West
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 06:30 [EST]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dentel, Glenn (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:

"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.

"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56361
Facility: Dresden
Region: 3     State: IL
Unit: [2] [3] []
RX Type: [2] GE-3,[3] GE-3
NRC Notified By: Dennis Moore
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 05:30 [CST]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dickson, Billy (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:

"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.

"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56362
Facility: FitzPatrick
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: Dennis Moore
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 06:30 [EST]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dentel, Glenn (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:

"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.

"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56363
Facility: Ginna
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: Dennis Moore
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 06:30 [EST]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dentel, Glenn (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:

"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.

"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."


Power Reactor
Event Number: 56364
Facility: LaSalle
Region: 3     State: IL
Unit: [1] [2] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: Dennis Moore
HQ OPS Officer: Karen Cotton-Gross
Notification Date: 02/06/2023
Notification Time: 13:26 [ET]
Event Date: 02/06/2023
Event Time: 05:30 [CST]
Last Update Date: 02/14/2023
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
Dickson, Billy (R3DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 92 Power Operation 92 Power Operation
Event Text
LOSS OF COMMUNICATIONS AND ASSESSMENT CAPABILITIES

The following information was provided by Constellation via email:

"On 02/06/2023 at 0416 EST, the Constellation Emergency Response Organization (ERO) Notification Database System uploaded data files into the Mass Notification System (Everbridge) which is used to notify ERO personnel when activated. At 0630, the individual reviewing the uploaded files discovered that the data files did not upload properly and that Everbridge may not notify all ERO individuals within the required 10 minutes of system initiation. Constellation resolved the issue by 0752.

"During the time period of 0416 to 0752, control room operators would have been unaware that the ERO notification was not successful. Therefore, this issue constitutes a loss of offsite communications capability and is reportable under 10 CFR 50.72(b)(3)(xiii), 'The licensee shall notify the NRC as soon as practical and in all cases within eight hours of the occurrence of any event that results in a major loss of emergency assessment capability, offsite response capability, or offsite communications capability (e.g., significant portion of control room indication, Emergency Notification System, or offsite notification system).' This loss of offsite communications capability affected all Constellation nuclear stations.

"There was no impact on the health and safety of the public or plant personnel. Each affected station NRC Resident Inspectors have been or will be notified."