Skip to main content

Event Notification Report for November 11, 2022

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
11/10/2022 - 11/11/2022

EVENT NUMBERS
56280
Power Reactor
Event Number: 56280
Facility: Peach Bottom
Region: 1     State: PA
Unit: [3] [] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: Tim Grimme
HQ OPS Officer: Brian Lin
Notification Date: 12/19/2022
Notification Time: 12:50 [ET]
Event Date: 11/11/2022
Event Time: 23:33 [EST]
Last Update Date: 12/19/2022
Emergency Class: Non Emergency
10 CFR Section:
50.73(a)(1) - Invalid Specif System Actuation
Person (Organization):
Eve, Elise (R1DO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N Y 100 Power Operation 100 Power Operation
Event Text
60-DAY TELEPHONIC NOTIFICATION

The following information was provided by the licensee via email:

"This 60-day telephone notification is being made per the reporting requirements specified by 10 CFR 50.73(a)(1) and 50.73(a)(2)(iv)(A) for an invalid actuation of a primary containment isolation signal affecting more than one system.

"On November 11, 2022, at 2333 hours EST, Peach Bottom experienced an unplanned loss of the #343 Off-Site Startup Source. Due to the temporary loss of power during automatic bus transfers, several systems experienced Primary Containment Isolation System (PCIS) Group II and Group III (GP II/III) isolation signals. Plant Systems impacted by isolation valve closure included: Reactor Water Clean Up (RWCU), Containment Atmospheric Control (CAC), Traversing In-Core Probe (TIP) Purge, Primary Containment Floor and Equipment Drains, and the Instrument Nitrogen system. All equipment responded as designed.

"Plant conditions which initiate PCIS GP II isolation signals are Reactor Vessel Low Water Level, High Drywell Pressure, RWCU system High Flow or RWCU Non-Regenerative Heat Exchanger High Outlet Temperature. The PCIS GP III actuations are initiated by the Reactor Vessel Low Water Level, Primary Containment High Pressure, Reactor Building Ventilation High Radiation or Refuel Floor Ventilation High Radiation. At the time of the event, none of these actual plant conditions existed; therefore, the actuation of the PCIS was invalid.

"The loss of the #343 Off-Site Startup Source was caused by a failed printed circuit card in the programable logic controller (PLC) for the 3435 breaker. There is no time-based maintenance strategy for PLC replacement. The PLC circuit card was replaced, and the breaker restored to full qualification and service. Preventive maintenance strategy will be enhanced to address the identified vulnerability.

"The licensee has notified the NRC Resident Inspector."