Event Notification Report for March 06, 2019

U.S. Nuclear Regulatory Commission
Operations Center

Event Reports For
3/5/2019 - 3/6/2019

** EVENT NUMBERS **


5389853911


Agreement State Event Number: 53898
Rep Org: TEXAS DEPT OF STATE HEALTH SERVICES
Licensee: BRASKEM AMERICA, INC
Region: 4
City: FREEPORT   State: TX
County:
License #: Licen-RAM-L06443
Agreement: Y
Docket:
NRC Notified By: CHRIS MOORE
HQ OPS Officer: DONALD NORWOOD
Notification Date: 02/25/2019
Notification Time: 15:43 [ET]
Event Date: 02/25/2019
Event Time: 00:00 [CST]
Last Update Date: 02/25/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
AGREEMENT STATE
Person (Organization):
RICK DEESE (R4DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)

Event Text

AGREEMENT STATE REPORT - GAUGE SHUTTER FAILURE

The following information was received via e-mail:

"On February 25, 2019, the Agency [Texas Department of State Health Services] received a report from the licensee's technical representative stating that the shutter on an Ohmart Vega model SH-F1 gauge, containing a 50 millicurie cesium-137 source, failed to shut during maintenance when the handle broke off. Open is the normal operation position of the gauge shutter. No licensee employee received any exposure as a result of this event. The gauge will be repaired in September 2019 during an outage. Additional information will be sent in accordance with SA-300."

Texas Incident #: 9659


Power Reactor Event Number: 53911
Facility: BRUNSWICK
Region: 2     State: NC
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: RICHARD BARRETT
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 03/05/2019
Notification Time: 12:46 [ET]
Event Date: 03/05/2019
Event Time: 05:35 [EST]
Last Update Date: 03/05/2019
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
STEVE ROSE (R2DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Refueling 0 Refueling

Event Text

AUTOMATIC ACTUATION OF THE PRIMARY CONTAINMENT ISOLATION SYSTEM

"At 05:35 Eastern Standard Time (EST) on March 5, 2019, with Unit 2 in Mode 5 at 0% power, an actuation of the Primary Containment Isolation System occurred during hydrolazing of the reactor water level variable leg instrumentation line nozzle N011B in the reactor cavity. The hydrolazing activity caused low reactor water level to be sensed on Division II of the shutdown range level instrumentation. Per design, the low level 1 signal resulted in Group 2 (i.e., floor and equipment drain isolation valves), Group 6 (i.e., monitoring and sampling isolation valves) and Group 8 (i.e., shutdown cooling isolation valves) isolations.

"This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the Primary Containment Isolation System.

"There was no impact on the health and safety of the public or plant personnel. The Group 8 was reset and shutdown cooling was restored at approximately 05:45 EST.

"The safety significance of this event was minimal. Although there was a brief interruption of the shutdown cooling, the Residual Heat Removal (RHR) shutdown cooling system operation was restored in approximately 10 minutes without extensive troubleshooting or maintenance, and remained operable. The RHR shutdown cooling system is not credited in any Updated Final Safety Analysis Report Chapter 6 or 15 accidents or transients.

"The NRC Resident Inspector has been notified."