Event Notification Report for September 27, 2018

U.S. Nuclear Regulatory Commission
Operations Center

Event Reports For
9/26/2018 - 9/27/2018

** EVENT NUMBERS **


53612 53613 53623 53625 53626 53628

To top of page
!!!!! THIS EVENT HAS BEEN RETRACTED.THIS EVENT HAS BEEN RETRACTED !!!!!
Fuel Cycle Facility Event Number: 53612
Facility: BWX TECHNOLOGIES, INC.
RX Type: URANIUM FUEL FABRICATION
Comments: HEU FABRICATION & SCRAP
Region: 2
City: LYNCHBURG   State: VA
County: CAMPBELL
License #: SNM-42
Docket: 070-27
NRC Notified By: CHRIS TERRY
HQ OPS Officer: ANDREW WAUGH
Notification Date: 09/18/2018
Notification Time: 14:15 [ET]
Event Date: 09/17/2018
Event Time: 00:00 [EDT]
Last Update Date: 09/20/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
PART 70 APP A (b)(1) - UNANALYZED CONDITION
Person (Organization):
EUGENE GUTHRIE (R2DO)
FUELS GROUP (EMAIL)
NMSS_EVENTS_NOTIFICATION (EMAIL)

Event Text

UNANALYZED CONDITION

"On September 17, 2018, a notification was made by [Specialty Fuel Facility] (SFF) Operations that during dissolution of depleted uranium in the Conversion Area, the Recovery scrubber system was shut down for maintenance. During the shutdown, a reduction in vacuum to the box ventilation was experienced and a small amount of NOx [Nitrous Oxide] was released into the room. As the result of BWXT's review of this event, it cannot be determined within the 24 hour notification period that documentation is available to demonstrate that the condition has been analyzed in the [Integrated Safety Analysis] (ISA). BWXT is making this report per 10 CFR 70.61, Appendix A(b)(1), 'Any event or condition that results in the facility being in a state that was not analyzed, was improperly analyzed, or is different from that analyzed in the ISA, and which results in a failure to meet the performance requirements of 10 CFR 70.61 (i.e. high consequence events are highly unlikely and intermediate consequences are unlikely)'.

"The area is currently shutdown and in preparation for inventory. No material has been processed within the system since the event. BWXT is continuing to review the ISA documentation and will provide further updates as appropriate."

The licensee notified the NRC Resident Inspector.

* * * RETRACTION AT 1315 EDT ON 9/20/18 FROM CHRIS TERRY TO JEFF HERRERA * * *

"BWXT is retracting Event Notification #53612 that was reported on September 18, 2018. The notification was made due to the fact that it could not be determined within the 24 hour notification period that documentation was available to demonstrate that a NOx release from the Conversion Area dissolver had been analyzed in the ISA. Subsequently, BWXT located the documentation that the condition was analyzed and meets the performance requirements of 10 CFR 70.61. Additionally, new calculations of the current process were run and the results confirmed the original analysis."

The licensee notified the NRC Resident Inspector.

Notified the R2DO (Guthrie), NMSS Events and Fuels group (via email).

To top of page
Agreement State Event Number: 53613
Rep Org: OHIO BUREAU OF RADIATION PROTECTION
Licensee: THE CLEVELAND CLINIC FOUNDATION
Region: 3
City: CLEVELAND   State: OH
County:
License #: 02110180013
Agreement: Y
Docket:
NRC Notified By: MICHAEL RUBADUE
HQ OPS Officer: ANDREW WAUGH
Notification Date: 09/19/2018
Notification Time: 14:40 [ET]
Event Date: 09/19/2018
Event Time: 00:00 [EDT]
Last Update Date: 09/19/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
AGREEMENT STATE
Person (Organization):
ROBERT ORLIKOWSKI (R3DO)
NMSS_EVENTS_NOTIFICATION (EMAIL)

Event Text

AGREEMENT STATE REPORT - PACKAGE ARRIVED WITH SURFACE CONTAMINATION

The following information was obtained from the Ohio Department of Health via email:

"At approximately 0730 EDT on 9/19/18, a package containing Tc-99m was received by the Cleveland Clinic Foundation from Cardinal Health in
Oakwood, OH that exceeded the DOT surface contamination limits. The contact dose rates were incompliance. An initial wipe for removable
contamination showed 1258 cpm over 300 cm2 of the package surface. Wipes of the handle (10759 cpm), the zipper (11290 cpm) and the
top address label cover (24342 cpm) identified additional removable contamination on the package. Conversion to dpm with appropriate area
correction resulted in 2946 dpm/cm2.

"No other contamination was found in the lab or package receipt area.

"A follow-up inspection at Cardinal Health in Oakwood will be conducted to determine the cause of the event."

Ohio NMED Report No.: OH180008

To top of page
Power Reactor Event Number: 53623
Facility: CLINTON
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: PATRICK SELZER
HQ OPS Officer: VINCE KLCO
Notification Date: 09/26/2018
Notification Time: 15:10 [ET]
Event Date: 09/26/2018
Event Time: 00:00 [CDT]
Last Update Date: 09/26/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
LAURA KOZAK (R3DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 98 Power Operation 98 Power Operation

Event Text

UNDERVOLTAGE CONDITION INITIATES AN AUTOMATIC START OF THE DIESEL GENERATOR

"At 0946 CDT on 9/26/2018, a disruption in power to the offsite 138 kV line and the subsequent trip of the Emergency Reserve Auxiliary Transformer (ERAT) Static VAR Compensator (SVC) resulted in a degraded voltage signal on the Division 1- 4.16 kV safety bus. The degraded voltage signal resulted in a trip of the ERAT feed to the bus, blocking closure of the 345 kV Reserve Auxiliary Transformer (RAT) feed to the bus and auto start of the Division 1 Emergency Diesel Generator (EDG). The Division 1 EDG successfully started and re-energized the Division 1- 4.16 kV bus as designed. The unit is stable with the Division 1 EDG carrying the Division 1- 4.16 kV bus.

"The Ameren Transmission System Operator in St. Louis, MO informed the station that they had received a report that a 138 kV to 13.8 kV transformer at Clinton Route 54 substation was on fire and the South feed to the Tabor substation cycled as a result of this fault.

"The NRC Resident Inspector and Illinois Emergency Management Agency Resident Inspector have been notified."

To top of page
Power Reactor Event Number: 53625
Facility: HOPE CREEK
Region: 1     State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: LAURA MYERS
HQ OPS Officer: VINCE KLCO
Notification Date: 09/26/2018
Notification Time: 21:43 [ET]
Event Date: 09/26/2018
Event Time: 00:00 [EDT]
Last Update Date: 09/26/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
FRANK ARNER (R1DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation

Event Text

HIGH PRESSURE CORE INJECTION (HPCI) SYSTEM INOPERABLE

"On 9/26/2018 at 1530 EDT, it was discovered that the HPCI system was inoperable due to a blown fuse in the 10C617 Panel, E21-F15A. Therefore, this condition Is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v)(D). The blown fuse also impacts 'A' channel Residual Heat Removal (RHR) subsystem and 'A' Core Spray (CS) subsystem. These Emergency Core Cooling subsystems have been declared inoperable. Remaining Emergency Core Cooling subsystems and the Reactor Core Isolation Cooling (RCIC) system remain OPERABLE.

"There was no impact on the health and safety of the public or plant personnel."

The licensee notified the NRC Resident Inspector and will notify the local authorities.

To top of page
Power Reactor Event Number: 53626
Facility: QUAD CITIES
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: MATT SEELEY
HQ OPS Officer: VINCE KLCO
Notification Date: 09/26/2018
Notification Time: 23:25 [ET]
Event Date: 09/26/2018
Event Time: 00:00 [CDT]
Last Update Date: 09/26/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
LAURA KOZAK (R3DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 100 Power Operation 0 Hot Shutdown

Event Text

AUTOMATIC SCRAM DUE TO GENERATOR OUTPUT BREAKER TRIP

"On September 26, 2018 at 1908 CDT. an automatic scram was received on U1 following main generator 345 kV output breaker 7-8 trip with 345 kV output breaker 6-7 already opened for maintenance on line 0401. Following the reactor scram, reactor water level decreased to approximately minus 15 inches, which resulted in automatic Group II and Group Ill isolations (expected response). Reactor pressure rose to approximately 1083 psig, and the 3B and 3C low set relief valves opened briefly to control reactor pressure. Reactor water level and reactor pressure have been restored to their normal bands. All systems responded properly to the event. Unit 1 remains in Mode 3, with reactor pressure being controlled on the turbine bypass valves. The cause and details of the event are under investigation.

"Unit 2 was unaffected by the event and remains at 100% power.

"This report is being made in accordance with 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A)."

All control rods inserted. Decay heat is being removed via the main condenser.

The licensee notified the NRC Resident Inspector.

To top of page
Power Reactor Event Number: 53628
Facility: VOGTLE
Region: 2     State: GA
Unit: [3] [4] []
RX Type: [3] W-AP1000,[4] W-AP1000
NRC Notified By: DANIEL MICKINAC
HQ OPS Officer: OSSY FONT
Notification Date: 09/27/2018
Notification Time: 14:42 [ET]
Event Date: 09/27/2018
Event Time: 00:00 [EDT]
Last Update Date: 09/27/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
26.719 - FITNESS FOR DUTY
Person (Organization):
NICOLE COOVERT (R2DO)
FFD GROUP (EMAIL)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N N 0 Under Construction 0 Under Construction
4 N N 0 Under Construction 0 Under Construction

Event Text

FITNESS FOR DUTY - CONTRACTOR SUPERVISOR TESTS POSITIVE

"At 1000 EDT on September 27, 2018, Southern Nuclear Operating Company (SNC) determined a contractor supervisor confirmed positive for drugs during a random Fitness-for-Duty (FFD) test. The employee's unescorted access to the plant has been suspended.

"The NRC Resident Inspector has been notified."

Page Last Reviewed/Updated Thursday, March 25, 2021