Event Number: 51612
Rep Org: NUTHERM INTERNATIONAL, INC
Licensee: NUTHERM INTERNATIONAL, INC
Region: 3
City: MOUNT VERNON State: IL
County:
License #:
Agreement: Y
Docket:
NRC Notified By: ADRIENNE SMITH
HQ OPS Officer: DONG HWA PARK
Licensee: NUTHERM INTERNATIONAL, INC
Region: 3
City: MOUNT VERNON State: IL
County:
License #:
Agreement: Y
Docket:
NRC Notified By: ADRIENNE SMITH
HQ OPS Officer: DONG HWA PARK
Notification Date: 12/18/2015
Notification Time: 16:41 [ET]
Event Date: 12/18/2015
Event Time: 00:00 [CST]
Last Update Date: 12/18/2015
Notification Time: 16:41 [ET]
Event Date: 12/18/2015
Event Time: 00:00 [CST]
Last Update Date: 12/18/2015
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21(d)(3)(i) - DEFECTS AND NONCOMPLIANCE
10 CFR Section:
21.21(d)(3)(i) - DEFECTS AND NONCOMPLIANCE
Person (Organization):
MARC FERDAS (R1DO)
PART 21/50.55 REACTO (EMAI)
MARC FERDAS (R1DO)
PART 21/50.55 REACTO (EMAI)
POTENTIAL PART 21 INVOLVING RTD TRANSMITTER
The following is excerpted from a report submitted by Nutherm International, Inc.:
"The wire insulation in T2 transformer on the Moores Industry RTD transmitter, Part Number: RBT/3W20-40/4-20MA/117AC/-EZ84.06-LNP-VTD [EX] was damaged during assembly. This damage reduced the insulation resistance and dielectric breakdown between the windings of the transformer. This resulted in early, catastrophic failure of the RTD transmitter.
"It has been determined that no visual inspection of the transformer or testing after the transformer is installed will discover this defect. This defect can only be found by performing testing on the transformer prior to installation."
Two of these transmitters were sent to Entergy Operations - Fitzpatrick.
The following is excerpted from a report submitted by Nutherm International, Inc.:
"The wire insulation in T2 transformer on the Moores Industry RTD transmitter, Part Number: RBT/3W20-40/4-20MA/117AC/-EZ84.06-LNP-VTD [EX] was damaged during assembly. This damage reduced the insulation resistance and dielectric breakdown between the windings of the transformer. This resulted in early, catastrophic failure of the RTD transmitter.
"It has been determined that no visual inspection of the transformer or testing after the transformer is installed will discover this defect. This defect can only be found by performing testing on the transformer prior to installation."
Two of these transmitters were sent to Entergy Operations - Fitzpatrick.
Power Reactor
Event Number: 51613
Facility: FITZPATRICK
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: HENDRIK VERWEY
HQ OPS Officer: DONALD NORWOOD
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: HENDRIK VERWEY
HQ OPS Officer: DONALD NORWOOD
Notification Date: 12/19/2015
Notification Time: 00:44 [ET]
Event Date: 12/18/2015
Event Time: 17:22 [EST]
Last Update Date: 12/19/2015
Notification Time: 00:44 [ET]
Event Date: 12/18/2015
Event Time: 17:22 [EST]
Last Update Date: 12/19/2015
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
MARC FERDAS (R1DO)
MARC FERDAS (R1DO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
BOTH TRAINS OF CONTAINMENT ATMOSPHERE DILUTION SYSTEM INOPERABLE
"On December 18, 2015 at 1722 EST, with James A. FitzPatrick Nuclear Power Plant (JAF) operating at 100 percent power, JAF received a notification pursuit to 10 CFR 21.21(d)(3)(ii) related to Moore Industries RTD temperature transmitters. Specifically, wire insulation in T2 transformer was damaged during assembly which reduced the insulation resistance and dielectric breakdown between the windings of the transformer. This equipment is in both redundant trains (A and B) of the Containment Atmosphere Dilution (CAD) System.
"Preliminary review by Operations and Engineering, which was completed on 12/18/15 at 2100 EST, determined the Part 21 results in both trains of CAD being inoperable and the applicable Technical Specification (TS) for both redundant trains of CAD being inoperable was entered.
"Per TS 3.6.3.2 Condition B, this places the unit in a 7-day shutdown LCO, provided the hydrogen control function is maintained. Per the TS Bases, the alternate hydrogen control capabilities are provided by the Primary Containment lnerting System, which is unaffected.
"The event is reportable pursuant to 10 CFR 50.72(b)(3)(v)(D), as an event or condition that could prevent fulfillment of a safety function."
The licensee notified the NRC Resident Inspector.
"On December 18, 2015 at 1722 EST, with James A. FitzPatrick Nuclear Power Plant (JAF) operating at 100 percent power, JAF received a notification pursuit to 10 CFR 21.21(d)(3)(ii) related to Moore Industries RTD temperature transmitters. Specifically, wire insulation in T2 transformer was damaged during assembly which reduced the insulation resistance and dielectric breakdown between the windings of the transformer. This equipment is in both redundant trains (A and B) of the Containment Atmosphere Dilution (CAD) System.
"Preliminary review by Operations and Engineering, which was completed on 12/18/15 at 2100 EST, determined the Part 21 results in both trains of CAD being inoperable and the applicable Technical Specification (TS) for both redundant trains of CAD being inoperable was entered.
"Per TS 3.6.3.2 Condition B, this places the unit in a 7-day shutdown LCO, provided the hydrogen control function is maintained. Per the TS Bases, the alternate hydrogen control capabilities are provided by the Primary Containment lnerting System, which is unaffected.
"The event is reportable pursuant to 10 CFR 50.72(b)(3)(v)(D), as an event or condition that could prevent fulfillment of a safety function."
The licensee notified the NRC Resident Inspector.