|Hospital                                         |Event Number:   39941       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| REP ORG:  GUTHRIE HEALTH CARE                  |NOTIFICATION DATE: 06/16/2003|

|LICENSEE:  GUTHRIE HEALTH CARE                  |NOTIFICATION TIME: 09:20[EDT]|

|    CITY:  SAYRE                    REGION:  1  |EVENT DATE:        06/12/2003|

|  COUNTY:                            STATE:  PA |EVENT TIME:             [EDT]|

|LICENSE#:  37-01893-01           AGREEMENT:  N  |LAST UPDATE DATE:  08/14/2003|

|  DOCKET:                                       |+----------------------------+

|                                                |PERSON          ORGANIZATION |

|                                                |RAYMOND LORSON       R1      |

|                                                |DOUG BROADDUS        NMSS    |

+------------------------------------------------+                             |

| NRC NOTIFIED BY:  JOON PARK                    |                             |

|  HQ OPS OFFICER:  FANGIE JONES                 |                             |

+------------------------------------------------+                             |

|EMERGENCY CLASS:          NON EMERGENCY         |                             |

|10 CFR SECTION:                                 |                             |

|LDIF 35.3045(a)(1)       DOSE <> PRESCRIBED DOSA|                             |

|LOTH 35.3045(a)(3)       DOSE TO OTHER SITE > SP|                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+------------------------------------------------------------------------------+



                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| DISCOVERY THAT PART OF THE IMPLANTED SEEDS WERE NOT IN THE PROPER SITE       |

|                                                                              |

| A patient was referred for treatment, due to reoccurring prostate cancer, to |

| the hospital where he had previously had treatment. Seeds were implanted     |

| around May 2001.  A scan of the previous treatment of implanted seeds        |

| determined that many of the seeds were not located in the prostate, but in   |

| adjacent tissue where they would have been ineffective in treatment.  Also,  |

| a review of the records indicated a scan was performed in early 2002, but    |

| was not followed up on. The patient and referring physician have been        |

| informed.  The hospital is conducting an investigation into the event and    |

| also developing a plan to provide appropriate treatment for the patient.     |

|                                                                              |

| * * * UPDATE ON 07/18/03 AT 1638 FROM JOON PARK TO ARLON COSTA * * *         |

|                                                                              |

| Post-op dosimetry on one patient was determined to be a misadministration.   |

| The dose that covered  the prostate was more than 20 percent different  from |

| the prescription as well as the penile bulb dose being close to 50 percent   |

| of the prescription dose.  Efforts are being made to contact the affected    |

| patient.  The licensee will continue efforts to obtain post-op dosimetry on  |

| the rest of the patients related to this incident so that  evaluations for   |

| misadministration can be performed.                                          |

|                                                                              |

| Notified R1DO (Della Greca) and NMSS EO (Pierson).                           |

|                                                                              |

| * * * UPDATE ON 07/25/03 AT 0921 EDT FROM JOON PARK TO JOHN MACKINNON * * *  |

|                                                                              |

| Post-op dosimetry for two patients were determined to be a                   |

| misadministration.  The patients had their prostates treated some time in    |

| the year 2001.  The iodine-125 seeds were placed  2 to 3 centimeters below   |

| the area where they were supposed to be located.  The improper location of   |

| the iodine-125 seeds caused more than 50% of the prescribed dose to be       |

| delivered to an un-intended organ.  The patients will be notified.           |

|                                                                              |

| Notified R1DO (Dan Holody) and NMSS EO (Trish Holahan).                      |

|                                                                              |

| * * * UPDATE ON 07/30/03 AT 0911 EDT FROM JOON PARK TO ARLON COSTA * * *     |

|                                                                              |

| Two additional patients of a group of seven were identified as having        |

| received a misadministration of iodine-125 to an unintended organ. The       |

| patients will be notified of this misadministration.  The licensee is in the |

| process of clarifying and document the issues related to this incident.      |

|                                                                              |

| Notified R1DO (James Moorman) and NMSS EO (Tom Essig).                       |

|                                                                              |

| * * * UPDATE ON 08/07/03 AT 1535 EDT FROM CHARLES LEE TO NATHAN SANFILIPPO * |

| * *                                                                          |

|                                                                              |

| Another patient has been identified who received a misadministration of      |

| iodine-125 to the prostate.  The prescribed dose was 144 Gy, and it was      |

| delivered using 76 seeds and 27 needles as planned prior to the implant      |

| date.  After reviewing the CT, which was done on Feb. 27, 2001, the V100 of  |

| the prostate received 29% of the prescribed dose.  The penile bulb at 72 Gy  |

| received 44.8%.  The licensee indicated that they have looked into 8         |

| patients who may have been misadministered, of which, one was not declared a |

| misadministration.  The other seven appear in this notification.  There are  |

| 23 total patients that the licensee intends to review.                       |

|                                                                              |

| Notified R1DO (Clifford Anderson) and NMSS EO (Fred Brown).                  |

|                                                                              |

| * * * FINAL UPDATE ON 08/14/03 AT 1150 EDT BY CHARLES LEE TO JOHN MACKINNON  |

| * * *                                                                        |

|                                                                              |

| Twelve more patients have been added to the number of patients. Patients are |

| identified by a six digit number.                                            |

|                                                                              |

| Patient# [deleted]- On this date, March 21, 2001, the former physician,      |

| prescribed a dose of 144Gy to the prostate using 1-125 seeds. The prescribed |

| dose was delivered using 77 seeds and 26 needles as planned prior to the     |

| implant, The V 100 of the prostate received 39% of the prescribed dose and   |

| the V50 of the penile bulb received 88%.                                     |

| Patient# [deleted]- On this date, May 23, 2001, the former physician,        |

| prescribed a dose of 144Gy to the prostate using 1-125 seeds. The prescribed |

| close was delivered using 53 seeds and 18 needles as planned prior to the    |

| implant. The V100 of the prostate received 62% of the prescribed dose and    |

| the V50 of the penile bulb received 57%,                                     |

| Patient# [deleted]- On this date, December. 13, 2001, the former physician,  |

| prescribed a dose of 144Gy to the prostate using 1-125 seeds. The prescribed |

| dose was delivered using 86 seeds and 21 needles as planned prior to the     |

| implant. The V 100 of the prostate received 70% of the prescribed dose and   |

| the V50 of the penile bulb received 99%.                                     |

| Patient# [deleted]- On this date, February 22, 2001, the former physician,   |

| prescribed a dose of 144Gy to the prostate using 1-125 seeds. The prescribed |

| dose was delivered using 77 seeds and 25 needles as planned prior to the     |

| implant. The V100 of the prostate received 52.5% of the prescribed dose and  |

| the V50 of the penile bulb received 80%.                                     |

| Patient# [deleted]- On this date, March 15, 2001, the former physician,      |

| prescribed a dose of 144Gy to the prostate using 1-125 seeds. The prescribed |

| dose was delivered using 67 seeds and 27 needles as planned prior to the     |

| implant. The V 100 of the prostate received 59% of the prescribed dose and   |

| the V50 of the penile bulb received 86.5%.                                   |

| Patient# [deleted]- On this date, July 5, 2001, the former physician,        |

| prescribed a dose of 144Gy to the prostate using 1-125 seeds. The prescribed |

| dose was delivered using 62 seeds and 21 needles as planned prior to the     |

| implant. The VI 00 of the prostate received 49% of the prescribed dose.      |

| Patient# [deleted]- On this date, February 8, 2001, the former physician,    |

| prescribed a dose of 144-Gy to the prostate using 1-125 seeds. The           |

| prescribed dose was delivered using 45 seeds and 18 needles as planned prior |

| to the implant. The V 100 of the prostate received 68% of the prescribed     |

| dose.                                                                        |

| Patient# [deleted]- On this date, September 5, 2001, the former physician,   |

| prescribed a dose of 144Gy to the prostate using 1-125 seeds. The prescribed |

| dose was delivered using 58 seeds and 20 needles as planned prior to the     |

| implant. The V100 of the prostate received 59.5% of the prescribed dose.     |

| Patient# [deleted]- On this date, May 31, 2001, the former physician,        |

| prescribed a dose of 14-4Gy to the prostate using 1-125 seeds. The           |

| prescribed dose was delivered using 60 seeds and 17 needles as planned prior |

| to the implant. The V1 00 of the prostate received 68% of the prescribed.    |

| Dose.                                                                        |

| Patient# [deleted]- On this date, January 22, 2001, the former physician,    |

| prescribed a dose of 144Gy to the prostate using I-125 seeds. The prescribed |

| dose was delivered using 54 seeds and 3, 8 needles as planned prior to the   |

| implant. The V100 of the prostate received 73% of the prescribed dose,       |

| Patient# [deleted]- On this date, January 10, 2001, the former physician,    |

| prescribed a dose of 144Gy to the prostate using I-125 seeds. The prescribed |

| dose was delivered using 58 seeds and 19 needles as planned prior to the     |

| implant. The VI 00 of the prostate received 54% of the prescribed dose.      |

| Patient# [deleted]- On this date, June 21, 2001, the former physician,       |

| prescribed a dose of 144Gy to the prostate using 1-125 seeds, The prescribed |

| dose was delivered using 82 seeds 28 needles as planned prior to the         |

| implant, The V 100 of the prostate received 73% of the prescribed dose.      |

|                                                                              |

| Notified R1DO (Glenn Meyer) & NMSS EO (Linda Psyk).                          |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|General Information or Other                     |Event Number:   40055       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| REP ORG:  TEXAS DEPARTMENT OF HEALTH           |NOTIFICATION DATE: 08/11/2003|

|LICENSEE:  ARIAS & KEZAR, INC.                  |NOTIFICATION TIME: 16:32[EDT]|

|    CITY:  AUSTIN                   REGION:  4  |EVENT DATE:        08/08/2003|

|  COUNTY:                            STATE:  TX |EVENT TIME:             [CDT]|

|LICENSE#:  L04964-001            AGREEMENT:  Y  |LAST UPDATE DATE:  08/11/2003|

|  DOCKET:                                       |+----------------------------+

|                                                |PERSON          ORGANIZATION |

|                                                |PHIL HARRELL         R4      |

|                                                |M. WAYNE HODGES      NMSS    |

+------------------------------------------------+                             |

| NRC NOTIFIED BY:  JIM OGDEN                    |                             |

|  HQ OPS OFFICER:  HOWIE CROUCH                 |                             |

+------------------------------------------------+                             |

|EMERGENCY CLASS:          NON EMERGENCY         |                             |

|10 CFR SECTION:                                 |                             |

|NAGR                     AGREEMENT STATE        |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+------------------------------------------------------------------------------+



                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| AGREEMENT STATE REPORT - TEXAS                                               |

|                                                                              |

| "On Friday, August 11, 2003, the Licensee was transporting the gauge in a    |

| Nissan Pickup truck that had a defective tailgate.  The Type 7A package was  |

| locked to the pickup with a chain but was held in place with a very small    |

| and cheap padlock.  Also in the truck were concrete samples being            |

| transported for analysis.  While transiting FM 471, the tailgate failed to   |

| the open position when the concrete samples shifted and pushed the gauge     |

| (Troxler Model 3430, Serial No. 28510, with two sealed sources - Am-241 /Be, |

| nominal 40 millicuries, Serial No. 47-25576; and Cs-137, nominal 8           |

| millicuries, Serial No. 750-2732) out of the bed and broke the lock allowing |

| the gauge to become detached from the truck.  The gauge was found by a       |

| member of the public laying in the middle of Highway FM471 being swerved     |

| around by traffic.  The member of the public stopped and picked up the       |

| package and placed in his vehicle and transported it to his residence at     |

| [address deleted], Helotes, Texas.  He opened the package which was not      |

| secured by a locking device. There is no indication that the member of the   |

| public exposed the sources.  He made notification to the Helotes Fire        |

| Department who in turn notified the Texas Department of Health's Public      |

| Health Region 8, Radiation Control Office in San Antonio.  The Public Health |

| Region responded with a Radioactive Materials Inspector who determined that  |

| the gauge was intact and appeared to have no damage.  The Licensee was       |

| notified and retrieved the gauge."                                           |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|General Information or Other                     |Event Number:   40056       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| REP ORG:  KENTUCKY DEPT OF RADIATION CONTROL   |NOTIFICATION DATE: 08/12/2003|

|LICENSEE:  UNIVERSITY OF KENTUCKY               |NOTIFICATION TIME: 14:10[EDT]|

|    CITY:  LEXINGTON                REGION:  2  |EVENT DATE:        06/23/2003|

|  COUNTY:  FAYETTE                   STATE:  KY |EVENT TIME:        15:30[CDT]|

|LICENSE#:  203-021-72            AGREEMENT:  Y  |LAST UPDATE DATE:  08/12/2003|

|  DOCKET:                                       |+----------------------------+

|                                                |PERSON          ORGANIZATION |

|                                                |DAVID AYRES          R2      |

|                                                |TOM ESSIG            NMSS    |

+------------------------------------------------+                             |

| NRC NOTIFIED BY:  ROB GRESHAM                  |                             |

|  HQ OPS OFFICER:  ERIC THOMAS                  |                             |

+------------------------------------------------+                             |

|EMERGENCY CLASS:          NON EMERGENCY         |                             |

|10 CFR SECTION:                                 |                             |

|NAGR                     AGREEMENT STATE        |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+------------------------------------------------------------------------------+



                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| AGREEMENT STATE REPORT                                                       |

|                                                                              |

| "On June 23, 2003 at 3:30 PM the [University of Kentucky] radiation safety   |

| office received a call from an AU [Authorized User] in the Dept. of Biology, |

| because a shipment of I-125, triiodothyronine, 100 microcuries, had not been |

| received.  Upon review of the records it was found that the package had      |

| arrived on June 18, 2003, and had measured 10 [millirem]/hr at the surface,  |

| 0.1 [millirem]/hr @ 1meter, and no external contamination. The Radiation     |

| Safety Office shipping paper record shows the I-125 package was included for |

| delivery to room 109, Research Building 3, on June 19.  The required         |

| signature of receipt for the package was not obtained.  With the DOT         |

| shipping labels removed, the greatest likelihood is that the package was put |

| into the ordinary trash.  A thorough search of the Radiation Safety Office   |

| facilities and vehicles was conducted on June 23.  On June 24, the           |

| authorized user's lab was searched, including use of a low energy NAI (Tl)   |

| detector, as well as all labs where deliveries were made on June 19.  No     |

| trace of the package or contents has been found.  It was concluded that the  |

| highest probability was that the package entered the normal waste stream and |

| went to a landfill. Once in a landfill, the I-125 will be sequestered from   |

| any contact, and will be essentially non-radioactive in 1.65 years.          |

| Assuming worst case scenarios, the dose rate to the torso would be about 10  |

| [millirem]/hr or less, and would have to be held against the body            |

| continuously by a single individual for 10 hours to produce a dose in excess |

| of 100 [millirem].  Additionally there is no indication or likelihood of     |

| intentional or accidental ingestion of the contents since this is not        |

| intended for human use.  However, if the entire 100 microcuries were         |

| ingested by a single individual, as sodium iodide, the thyroid dose would be |

| 78 rem, and the effective dose would be 2.4 rem.  While no thyroid dose      |

| information has been  found for the triiodothyronine form, the effective     |

| dose from ingestion of 100 microcuries would be 17 [millirem].  Surveys are  |

| conducted on a continual basis, if the package did not go to a landfill it   |

| would likely be found during monthly use area surveys or quarterly           |

| supervisory surveys.  No NOV was issued based on the corrective actions      |

| taken by licensee to correct deficiencies prior to report completion."       |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Other Nuclear Material                           |Event Number:   40060       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| REP ORG:  UNIVERSITY OF PENNSYLVANIA           |NOTIFICATION DATE: 08/14/2003|

|LICENSEE:  UNIVERSITY OF PENNSYLVANIA           |NOTIFICATION TIME: 09:00[EDT]|

|    CITY:  PHILADELPHIA             REGION:  1  |EVENT DATE:        07/01/2003|

|  COUNTY:                            STATE:  PA |EVENT TIME:             [EDT]|

|LICENSE#:                        AGREEMENT:  N  |LAST UPDATE DATE:  08/14/2003|

|  DOCKET:                                       |+----------------------------+

|                                                |PERSON          ORGANIZATION |

|                                                |GLENN MEYER          R1      |

|                                                |JOHN HICKEY          NMSS    |

+------------------------------------------------+                             |

| NRC NOTIFIED BY:  ROBERT FORREST               |                             |

|  HQ OPS OFFICER:  RICH LAURA                   |                             |

+------------------------------------------------+                             |

|EMERGENCY CLASS:          NON EMERGENCY         |                             |

|10 CFR SECTION:                                 |                             |

|BLO2 20.2201(a)(1)(ii)   LOST/STOLEN LNM>10X    |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+------------------------------------------------------------------------------+



                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| MISSING SOURCE AT UNIVERSITY OF PENNSYLVANIA                                 |

|                                                                              |

| "During a routine sealed source inventory in July 2003, a technician from    |

| the University of Pennsylvania's Office of Environmental Health and          |

| Radiation Safety (EHRS) found that a Hewlett-Packard 6890 gas chromatograph  |

| (GC) containing a generally licensed 15 millicuries source of Ni-63 was      |

| missing from a laboratory undergoing renovations. EHRS contacted faculty and |

| staff associated with the laboratory trying to locate the instrument. After  |

| an extensive search, it was determined that the GC was most likely sent to a |

| scrap metal dealer. According to NUREG-1717, Systematic Radiological         |

| Assessment of Exemptions for Source and Byproduct Materials, the dose to any |

| individual from a scrapped Ni-63 gas chromatograph source would be less than |

| 0.01 millisievert (1 millirem)"                                              |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40061       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: KEWAUNEE                 REGION:  3  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  WI |NOTIFICATION TIME: 10:57[EDT]|

|   RXTYPE: [1] W-2-LP                           |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        09:10[CDT]|

| NRC NOTIFIED BY:  ETHAN TREPTOW                |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  RICH LAURA                   +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |SONIA BURGESS        R3      |

|10 CFR SECTION:                                 |                             |

|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |

|APRE 50.72(b)(2)(xi)     OFFSITE NOTIFICATION   |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       100      Power Operation  |100      Power Operation  |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| EP SIRENS OUT OF SERVICE IN KEWAUNEE COUNTY                                  |

|                                                                              |

| "At 0910 on August 14, It was reported to the Control Room that all thirteen |

| Kewaunee County sirens had a communications problem that rendered them out   |

| of service. The percent siren coverage population lost is 68.52%. The State  |

| and County have been notified of the siren failures. The siren vendor has    |

| been contacted to begin troubleshooting the problem.                         |

|                                                                              |

| "This is being reported under 10 CFR 50.72(b)(3)(xiii) as any event that     |

| results in a major loss of emergency assessment capability, offsite response |

| capability, or offsite communications capability (loss of greater than 50%   |

| of emergency sirens). It is also being reported under 10 CFR 50.72(b)(2)(xi) |

| as any event or situation, related to the health and safety of the public or |

| onsite personnel, or protection of the environment, for which a news release |

| is planned or notification to other government agencies has been or will be  |

| made."                                                                       |

|                                                                              |

| The NRC resident inspector was notified.                                     |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40063       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: PERRY                    REGION:  3  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  OH |NOTIFICATION TIME: 16:33[EDT]|

|   RXTYPE: [1] GE-6                             |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:10[EDT]|

| NRC NOTIFIED BY:  JOE KOTAR                    |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |SONIA BURGESS        R3      |

|10 CFR SECTION:                                 |STUART RICHARDS      NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |HYMAN                FEMA    |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     A/R        Y       100      Power Operation  |0        Hot Shutdown     |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER GREATER THAN 15          |

| MINUTES.                                                                     |

|                                                                              |

| Automatic reactor scram due to a loss of offsite power.  All rods fully      |

| inserted.  Supplying power to vital buses via emergency diesel generators.   |

| All system operating properly.                                               |

|                                                                              |

| NRC Resident Inspector was notified of the event by the licensee.            |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40064       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: PALISADES                REGION:  3  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  MI |NOTIFICATION TIME: 17:10[EDT]|

|   RXTYPE: [1] CE                               |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:07[EDT]|

| NRC NOTIFIED BY:  VANDENALLE                   |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |SONIA BURGESS        R3      |

|10 CFR SECTION:                                 |                             |

|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          Y       100      Power Operation  |100      Power Operation  |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| POWER GRID DISTURBANCE OCCURRED RESULTING IN A MOMENTARY DROP IN VOLTAGE     |

|                                                                              |

| At 1607 EDT a significant electrical power grid disturbance occurred         |

| resulting in a momentary drop in voltage at the site, including both 2400    |

| VAC safety busses 1C and 1D.  The reduced voltage on the 2400VAC safety      |

| busses caused both emergency diesel generators to auto start, but not load.  |

| The plant is stable at pre-event conditions.                                 |

|                                                                              |

| The NRC Resident Inspector was notified.                                     |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40065       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: OYSTER CREEK             REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  NJ |NOTIFICATION TIME: 18:16[EDT]|

|   RXTYPE: [1] GE-2                             |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:11[EDT]|

| NRC NOTIFIED BY:  CIGANIK                      |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |                             |

|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     A/R        Y       100      Power Operation  |0        Hot Shutdown     |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| REACTOR SCRAM FROM 100% POWER DUE TO OFF SITE ELECTRICAL GRID INSTABILITY    |

|                                                                              |

| Reactor scram from 100% due to off site electrical grid instability, but did |

| not lose off site power.  Reactor conditions at 1730 are normal reactor      |

| water level, reactor pressure 850-1000psig, MSIV's closed and all recirc     |

| pumps are off and reactor is in hot shutdown with all rods inserted.         |

|                                                                              |

| The NRC Resident Inspector                                                   |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40066       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: NINE MILE POINT          REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [] [2] []                 STATE:  NY |NOTIFICATION TIME: 17:34[EDT]|

|   RXTYPE: [1] GE-2,[2] GE-5                    |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        17:00[EDT]|

| NRC NOTIFIED BY:  MORAN                        |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |HYMAN                FEMA    |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |STUART RICHARDS      NRR     |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|                                                   |                          |

|2     A/R        Y       100      Power Operation  |0        Hot Shutdown     |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| NOUE WAS DECLARED AT 1700 DUE TO LOSS OF OFFSITE POWER                       |

|                                                                              |

| The plant lost off site power due to grid disturbance which resulted in a    |

| reactor trip from 100% power. The NOUE was declared because of loss of off   |

| site power was greater than 15 minutes.                                      |

|                                                                              |

|                                                                              |

| The NRC Resident Inspector was notified.                                     |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40067       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: INDIAN POINT             REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [2] [] []                 STATE:  NY |NOTIFICATION TIME: 16:39[EDT]|

|   RXTYPE: [2] W-4-LP,[3] W-4-LP                |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:25[EDT]|

| NRC NOTIFIED BY:  MARK COX                     |LAST UPDATE DATE:  08/15/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |STUART RICHARDS      NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |HYMAN                FEMA    |

|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |

|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|2     A/R        Y       100      Power Operation  |0        Hot Standby      |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER GREATER THAN 15          |

| MINUTES.                                                                     |

|                                                                              |

| Automatic reactor scram due to a loss of offsite power.  All rods fully      |

| inserted.  Supplying power to vital buses via emergency diesel generators.   |

| All systems operating properly.                                              |

|                                                                              |

| NRC Resident Inspector was notified of the event by the licensee.            |

|                                                                              |

| * * * UPDATE 2340EDT ON 8/14/03 FROM ANDY MIHALIK TO S.SANDIN * * *          |

|                                                                              |

| The following information was provided as an update:                         |

|                                                                              |

| "RPS Actuation (loss of flow) due to loss of offsite power.  Auto actuation  |

| of AFW in response to the unit trips.  Auto start & load of Emergency Diesel |

| Generators in response to the loss of offsite power."                        |

|                                                                              |

| The licensee informed the state/local authorities and the NRC resident       |

| inspector.  Notified R1IRC.                                                  |

|                                                                              |

| *****UPDATE ON 8/15/03 AT 0226 FROM CELENTANO TO GOTT*****                   |

|                                                                              |

| The licensee exited the Unusual Event at 0210 upon confirmation of a stable  |

| off-site power.                                                              |

|                                                                              |

| Notified R1 IRC and FEMA(Heyman).                                            |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40068       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: GINNA                    REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 16:46[EDT]|

|   RXTYPE: [1] W-2-LP                           |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:12[EDT]|

| NRC NOTIFIED BY:  PAUL HARRIS                  |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |STUART RICHARDS      NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |HYMAN                FEMA    |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     A/R        Y       100      Power Operation  |0        Hot Standby      |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER GREATER THAN 15          |

| MINUTES.                                                                     |

|                                                                              |

| Automatic reactor trip due to a loss of offsite power.  All rods fully       |

| inserted into the core.   All emergency systems operated as expected.        |

|                                                                              |

| NRC Resident Inspector was of this event by the licensee.                    |

|                                                                              |

| * * * UPDATE 0510EDT ON 8/15/03 FROM McCOY TO S.SANDIN * * *                 |

|                                                                              |

| Unit exited the UE at 2108EDT on 8/14/03 after restoration of offsite power. |

| The licensee informed state.local agencies and the NRC resident inspector.   |

| Notified R1IRC and FEMA(Heyman).                                             |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40069       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: INDIAN POINT             REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [] [3] []                 STATE:  NY |NOTIFICATION TIME: 16:50[EDT]|

|   RXTYPE: [2] W-4-LP,[3] W-4-LP                |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:23[EDT]|

| NRC NOTIFIED BY:  MESSINA                      |LAST UPDATE DATE:  08/15/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |STUART RICHARDS      NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |HYMAN                FEMA    |

|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |

|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |

|ASHU 50.72(b)(2)(i)      PLANT S/D REQD BY TS   |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|                                                   |                          |

|3     A/R        Y       100      Power Operation  |0        Hot Shutdown     |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER GREATER THAN 15          |

| MINUTES.                                                                     |

|                                                                              |

| Automatic reactor scram due to a loss of offsite power.  All rods fully      |

| inserted.  Supplying power to vital buses via emergency diesel generators.   |

| All systems operating properly.                                              |

|                                                                              |

| NRC Resident Inspector was notified of the event by the licensee.            |

|                                                                              |

| * * * UPDATE 2340EDT ON 8/14/03 FROM ANDY MIHALIK TO S.SANDIN * * *          |

|                                                                              |

| The following information was provided as an update:                         |

|                                                                              |

| "RPS Actuation (loss of flow) due to loss of offsite power.  Auto actuation  |

| of AFW in response to the unit trips.  Auto start & load of Emergency Diesel |

| Generators in response to the loss of offsite power.  Unit 3 also            |

| experienced a second AFW auto start during the event.  Unit 3 also entered   |

| Tech Spec LCO 3.0.3 for loss of two offsite circuits and one EDG inoperable. |

| #31 EDG was declared inoperable when its associated Fuel oil storage tank    |

| inventory decreased below required."                                         |

|                                                                              |

| The licensee informed the state/local authorities and the NRC resident       |

| inspector.  Notified R1IRC.                                                  |

|                                                                              |

| *****UPDATE ON 8/15/03 AT 0226 FROM CELENTANO TO GOTT*****                   |

|                                                                              |

| The licensee exited the Unusual Event at 0210 upon confirmation of a stable  |

| off-site power.                                                              |

|                                                                              |

| Notified R1 IRC and FEMA(Heyman).                                            |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40070       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: DAVIS BESSE              REGION:  3  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  OH |NOTIFICATION TIME: 16:54[EDT]|

|   RXTYPE: [1] B&W-R-LP                         |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:10[EDT]|

| NRC NOTIFIED BY:  DON BONDY                    |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |SONIA BURGESS        R3      |

|10 CFR SECTION:                                 |STUART RICHARDS      NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |HYMAN                FEMA    |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     N          N       0        Cold Shutdown    |0        Cold Shutdown    |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| UNUSUAL EVENT DECLARED DUE TO A LOSS OF OFFSITE POWER.                       |

|                                                                              |

| All systems operated as expected.   Decay Heat pumps are available if        |

| needed.                                                                      |

|                                                                              |

| NRC Resident Inspector was notified of this event by the licensee.           |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40071       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: NINE MILE POINT          REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 17:15[EDT]|

|   RXTYPE: [1] GE-2,[2] GE-5                    |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:35[EDT]|

| NRC NOTIFIED BY:  HELKER                       |LAST UPDATE DATE:  08/15/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |STUART RICHARDS      NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |HYMAN                FEMA    |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     A/R        Y       100      Power Operation  |0        Hot Shutdown     |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER GREATER THAN 15 MINUTES. |

|                                                                              |

|                                                                              |

| Automatic reactor scram due to a loss of offsite power.  All rods fully      |

| inserted into the core.  All emergency core cooling systems are operating    |

| properly and the emergency diesel generators are operating properly.         |

|                                                                              |

| NRC Resident Inspector was notified of this event by the licensee.           |

|                                                                              |

| *****UPDATE 8/15/03 AT 0145 TO LAURA*****                                    |

|                                                                              |

| Offsite electrical power was restored. The licensee exited the Unusual Event |

| at 0123.  Notified R1IRC  and FEMA(Heyman).                                  |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40072       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: FITZPATRICK              REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 17:17[EDT]|

|   RXTYPE: [1] GE-4                             |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:11[EDT]|

| NRC NOTIFIED BY:  TIM PAGE                     |LAST UPDATE DATE:  08/15/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |STUART RICHARDS      NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |HYMAN                FEMA    |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     A/R        Y       100      Power Operation  |0        Hot Shutdown     |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| UNUSUAL EVENT DECLARED DUE TO A LOSS OF OFFSITE POWER.                       |

|                                                                              |

| Automatic reactor scram due to a loss of offsite power. All rods fully       |

| inserted into the core.  All emergency core cooling systems and the          |

| emergency diesel generators are operating properly.                          |

|                                                                              |

| NRC Resident Inspector was notified of this event by the licensee.           |

|                                                                              |

| *****UPDATE ON 8/15/03 AT 0035 FROM PAGE TO LAURA*****                       |

|                                                                              |

| Reactor vessel pressure is 93 psig.  Plant electrical loads have been        |

| shifted back to offsite power and the EDGs were secured. The licensee exited |

| the Unusual Event at 0039. The licensee tentatively plans to remain shutdown |

| for a brief period to do some maintenance work.                              |

|                                                                              |

| Notified R1IRC  and FEMA(Heyman).                                            |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40073       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: INDIAN POINT             REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [2] [3] []                STATE:  NY |NOTIFICATION TIME: 18:49[EDT]|

|   RXTYPE: [2] W-4-LP,[3] W-4-LP                |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:25[EDT]|

| NRC NOTIFIED BY:  FINUCAH                      |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |                             |

|ACOM 50.72(b)(3)(xiii)   LOSS COMM/ASMT/RESPONSE|                             |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|2     N          N       0        Hot Shutdown     |0        Hot Shutdown     |

|3     N          N       0        Hot Shutdown     |0        Hot Shutdown     |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| EMERGENCY SIRENS LOST IN FOUR COUNTIES                                       |

|                                                                              |

| Emergency sirens lost in four counties due to a loss of power.  At           |

| approximately 1830 hours power starting to be returned to the sirens.        |

|                                                                              |

| NRC Resident Inspector notified of this event by the licensee.               |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40074       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: GINNA                    REGION:  1  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [1] [] []                 STATE:  NY |NOTIFICATION TIME: 20:07[EDT]|

|   RXTYPE: [1] W-2-LP                           |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:11[EDT]|

| NRC NOTIFIED BY:  Roy Gillow                   |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  JOHN MacKINNON               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          NON EMERGENCY         |GLENN MEYER          R1      |

|10 CFR SECTION:                                 |                             |

|ARPS 50.72(b)(2)(iv)(B)  RPS ACTUATION - CRITICA|                             |

|AESF 50.72(b)(3)(iv)(A)  VALID SPECIF SYS ACTUAT|                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|1     A/R        Y       100      Power Operation  |0        Hot Standby      |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| REACTOR TRIP/AUXILIARY FEEDWATER ACTUATION                                   |

|                                                                              |

| Received grid disturbance that caused reactor trip at 1611.  The trip        |

| occurred due to over temperature delta set point being reached from load     |

| swings experienced on the generator. Subsequently in the recovery process,   |

| the Auxiliary Feedwater Pumps auto started from a signal from the Main       |

| Feedwater Pumps being secured. As a result of grid problems it was noted     |

| that Ginna did not meet the required number of emergency sirens (greater     |

| than 25% of sirens without power).                                           |

|                                                                              |

|                                                                              |

| NRC Resident Inspector was notified of this event by the licensee.           |

+------------------------------------------------------------------------------+



+------------------------------------------------------------------------------+

|Power Reactor                                    |Event Number:   40075       |

+------------------------------------------------------------------------------+

+------------------------------------------------------------------------------+

| FACILITY: FERMI                    REGION:  3  |NOTIFICATION DATE: 08/14/2003|

|    UNIT:  [2] [] []                 STATE:  MI |NOTIFICATION TIME: 20:08[EDT]|

|   RXTYPE: [2] GE-4                             |EVENT DATE:        08/14/2003|

+------------------------------------------------+EVENT TIME:        16:10[EDT]|

| NRC NOTIFIED BY:  KEVIN DAHM                   |LAST UPDATE DATE:  08/14/2003|

|  HQ OPS OFFICER:  CHAUNCEY GOULD               +-----------------------------+

+------------------------------------------------+PERSON          ORGANIZATION |

|EMERGENCY CLASS:          UNUSUAL EVENT         |SONIA BURGESS        R3      |

|10 CFR SECTION:                                 |STUART RICHARDS      NRR     |

|AAEC 50.72(a) (1) (i)    EMERGENCY DECLARED     |HYMAN                FEMA    |

|                                                |                             |

|                                                |                             |

|                                                |                             |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|UNIT |SCRAM CODE|RX CRIT|INIT PWR|   INIT RX MODE  |CURR PWR|  CURR RX MODE   |

+-----+----------+-------+--------+-----------------+--------+-----------------+

|2     A/R        Y       100      Power Operation  |0        Hot Shutdown     |

|                                                   |                          |

|                                                   |                          |

+------------------------------------------------------------------------------+

                                   EVENT TEXT                                   

+------------------------------------------------------------------------------+

| PLANT ENTERED AN NOUE DUE TO THE LOSS OF OFF SITE POWER                      |

|                                                                              |

| The reactor scrammed from 100% power due to fluctuations occurring on the    |

| main generator and a loss of off site power.  All rods fully inserted and    |

| all MSIV's closed.  Reactor level is being maintained in the normal band of  |

| 173 to 214 inches using RCIC.  Reactor pressure is being controlled via      |

| SRV's in lo-lo set mode between 905 and 1017 psig.  Isolations occurred as   |

| expected for level 2 and level 3.  HPCI and RCIC started on level 2 signal.  |

| HPCI has been shutdown but is available.  All 4 EDG's started and loaded.    |

|                                                                              |

| The NRC Resident Inspector was notified.                                     |

+------------------------------------------------------------------------------+





                    