Event Notification Report for August 13, 2003
U.S. Nuclear Regulatory Commission Operations Center Event Reports For 08/12/2003 - 08/13/2003 ** EVENT NUMBERS ** 40019 40057 +------------------------------------------------------------------------------+ |General Information or Other |Event Number: 40019 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | REP ORG: CALIFORNIA RADIATION CONTROL PRGM |NOTIFICATION DATE: 07/25/2003| |LICENSEE: DELLAVALLEY LABORATORIES |NOTIFICATION TIME: 13:00[EDT]| | CITY: SACRAMENTO REGION: 4 |EVENT DATE: 07/25/2003| | COUNTY: STATE: CA |EVENT TIME: 09:00[PDT]| |LICENSE#: 3194-10 AGREEMENT: Y |LAST UPDATE DATE: 08/13/2003| | DOCKET: |+----------------------------+ | |PERSON ORGANIZATION | | |TROY PRUETT R4 | | |FRED BROWN NMSS | +------------------------------------------------+ | | NRC NOTIFIED BY: KENT PREDERGAST | | | HQ OPS OFFICER: STEVE SANDIN | | +------------------------------------------------+ | |EMERGENCY CLASS: NON EMERGENCY | | |10 CFR SECTION: | | |NAGR AGREEMENT STATE | | | | | | | | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | AGREEMENT STATE REPORT INVOLVING A STOLEN TROXLER GAUGE | | | | "[The licensee] got in late from work, and failed to take the gauge to | | storage location but instead left the gauge in the back of his pickup and | | covered it. The gauge was covered inside the camper shell. Sometime | | between 11 PM on 7/24/03 and 1:00 AM on 7/25/03, the pickup was stolen from | | it's parking location. The Sacramento Police were notified on 7/25/03 and | | the licensee will be placing an advertisement in the Sacramento Bee | | [newspaper], offering a reward for the stolen gauge. | | | | "The Stolen gauge was a CPN 131, Model 503 DR, serial number H35126508 | | containing 50 millicuries of Americium 241 Beryllium." | | | | *****UPDATE 8/12/03 AT 12:46 GREGER TO LAURA***** | | | | "The stolen nuclear gauge reported in Event # 030603 [NMED Database number] | | was found in a business dumpster in Sacramento, the city in which it was | | stolen, on August 3, 2003 by a member of the public. Both the gauge and the | | truck in which the gauge was stored overnight (inside a camper shell) was | | stolen from a private residence. The truck has not been recovered. The gauge | | was found inside its protective transportation case. The lock on the | | transportation case had been removed, but the gauge remained locked | | (radioactive source not exposed). The individual finding the gauge stated he | | had seen the newspaper ad offering a reward for return of the gauge. The | | gauge will be tested for radioactive leakage before being returned to | | service. Enforcement action is being taken against the gauge company for | | failing to properly store the gauge." | | | | Notified NMSS (J. Hickey) and R4DO (Phil Harrell). | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ |Power Reactor |Event Number: 40057 | +------------------------------------------------------------------------------+ +------------------------------------------------------------------------------+ | FACILITY: HOPE CREEK REGION: 1 |NOTIFICATION DATE: 08/12/2003| | UNIT: [1] [] [] STATE: NJ |NOTIFICATION TIME: 16:11[EDT]| | RXTYPE: [1] GE-4 |EVENT DATE: 06/15/2003| +------------------------------------------------+EVENT TIME: 14:47[EDT]| | NRC NOTIFIED BY: ART BREADY |LAST UPDATE DATE: 08/12/2003| | HQ OPS OFFICER: ERIC THOMAS +-----------------------------+ +------------------------------------------------+PERSON ORGANIZATION | |EMERGENCY CLASS: NON EMERGENCY |GLENN MEYER R1 | |10 CFR SECTION: | | |AINV 50.73(a)(1) INVALID SPECIF SYSTEM A| | | | | | | | | | | +-----+----------+-------+--------+-----------------+--------+-----------------+ |UNIT |SCRAM CODE|RX CRIT|INIT PWR| INIT RX MODE |CURR PWR| CURR RX MODE | +-----+----------+-------+--------+-----------------+--------+-----------------+ |1 N Y 100 Power Operation |100 Power Operation | | | | | | | +------------------------------------------------------------------------------+ EVENT TEXT +------------------------------------------------------------------------------+ | 10 CFR 50.73 REPORT | | | | "The report is being made under 10 CFR 50.73(a)(2)(iv)(A) and is not | | considered a Licensee Event Report. | | | | "During performance of a Surveillance Order, a Reactor Building Ventilation | | System isolation was initiated at 14:47 on 6/15/03. The apparent cause of | | the isolation was human error due to the incorrect de-energizing and | | placement of test leads on the 'B' train component instead of the 'A' train | | component as required by procedure. After the 'B' Train Sorrento RM-80 | | (1SP-RY4856B) was de-energized, the 'A' train detector (1SP-RE-4857A) was | | disconnected in accordance with the procedure. When the opposite train | | detector was disconnected, the Reactor Building Ventilation System isolation | | was initiated. | | | | "Upon receipt of the Reactor Building Equipment (RBE) isolation, the | | following systems isolated: | | | | "Torus water cleanup, Drywell (DW) floor and equipment sumps, Drywell Leak | | Detection (DLD) sampling skid, Reactor Building Ventilation System (RBVS) | | isolated, Radwaste (RW) ventilation isolated, Filtration Recirculation | | Ventilation System (FRVS) auto started, B Station Service Water (SSW) pump | | and B Station Auxiliary Cooling System (SACS) pump auto started, Primary | | Containment Instrument (PCI) gas valves and compressors isolated. | | | | "The operating crew entered the procedure for Primary Containment abnormal | | condition B. When instrument technicians restored the 'B' RBE radiation | | monitor, the operating crew reset PCI Signal in accordance with the | | Operating Procedure and restored the systems to normal. | | | | "All safety systems responded to the isolation signal according to design." | +------------------------------------------------------------------------------+
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021